Files
gh-gtmagents-gtm-agents-plu…/commands/forecast-renewals.md
2025-11-29 18:31:29 +08:00

49 lines
3.3 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
name: forecast-renewals
description: Builds segmented renewal forecasts with health signals, variance commentary, and executive-ready views.
usage: /renewal-orchestration:forecast-renewals --window 90d --segment enterprise --detail full
---
# Command: forecast-renewals
## Inputs
- **window** time horizon (30d, 60d, 90d, quarter) to include in the forecast.
- **segment** optional filters (enterprise, midmarket, smb, region, vertical).
- **detail** summary | full (controls depth of commentary and tables).
- **include-expansion** true/false toggle to incorporate upsell scenarios.
- **confidence-threshold** percentage for highlighting low-confidence projections.
### GTM Agents Pattern & Plan Checklist
> Based on GTM Agents orchestrator blueprint @puerto/plugins/orchestrator/README.md#112-325.
- **Pattern selection**: Forecast builds usually run **pipeline** (data → segmentation → scenarios → commentary → packaging). If segmentation + scenario modeling can parallelize, note a **diamond** segment and merge gate in the plan header.
- **Plan schema**: Save `.claude/plans/plan-<timestamp>.json` capturing objective, filters, task IDs, parallel groups, dependency graph (CS Ops, Finance, Product), error handling, and success metrics (forecast accuracy, coverage %, confidence spread).
- **Tool hooks**: Reference `docs/gtm-essentials.md` stack—Serena for data model diffs, Context7 for product/support doc pulls, Sequential Thinking for scenario retros, Playwright for dashboard QA if embedded.
- **Guardrails**: Default retry limit = 2 for failed data pulls or scenario jobs; escalation ladder = CS Ops Partner → Renewal Director → Finance lead.
- **Review**: Run `docs/usage-guide.md#orchestration-best-practices-puerto-parity` checklist before execution to confirm agents, dependencies, deliverables.
## Workflow
1. **Data Pull** combine ARR, contract terms, product usage, CS health, support tickets, and sentiment data.
2. **Segmentation** bucket accounts by tier, segment, and renewal phase; calculate coverage ratios.
3. **Scenario Modeling** run base, upside, downside scenarios with expansion overlays.
4. **Variance Commentary** note drivers (product adoption, exec engagement, risk flags) per segment.
5. **Package Deliverables** produce dashboards + slides for CS leadership and finance.
## Outputs
- Renewal forecast table with ARR, NRR, churn %, and confidence per segment.
- Commentary deck with drivers, blockers, and next steps.
- Data extract for RevOps/finance to ingest into planning tools.
- Plan JSON entry stored/updated in `.claude/plans` for audit trail.
## Agent/Skill Invocations
- `renewal-director` validates scenario assumptions and narratives.
- `cs-ops-partner` ensures data integrity + automation hooks.
- `renewal-playbooks` skill maps forecast insights to plays.
## GTM Agents Safeguards
- **Fallback agents**: document substitutes (e.g., Exec Sponsor covering Renewal Director commentary) when specialists unavailable.
- **Escalation triggers**: if accuracy or confidence guardrails fall below thresholds twice in a row, escalate to Renewal Director + Finance leadership per GTM Agents rip-cord.
- **Plan maintenance**: update plan JSON/change log whenever segments, scenario assumptions, or deliverables change to maintain GTM Agents audit parity.
---