bd Metrics Guide
This guide covers the key metrics for tracking work in bd.
Cycle Time vs. Lead Time
Two distinct time measurements:
Cycle Time
- Definition: Time from "work started" to "work completed"
- Start: When task moves to "in-progress" status
- End: When task moves to "closed" status
- Measures: How efficiently work flows through active development
- Use: Identify process inefficiencies, improve development speed
# Calculate cycle time for completed task
bd show bd-5 | grep "status.*in-progress" # Get start time
bd show bd-5 | grep "status.*closed" # Get end time
# Difference = cycle time
Lead Time
- Definition: Time from "request created" to "delivered to customer"
- Start: When task is created (enters backlog)
- End: When task is deployed/delivered
- Measures: Overall responsiveness to requests
- Use: Set realistic expectations, measure total process duration
# Calculate lead time for completed task
bd show bd-5 | grep "created_at" # Get creation time
bd show bd-5 | grep "deployed_at" # Get deployment time (if tracked)
# Difference = lead time
Key Differences
| Metric | Starts | Ends | Includes Waiting? | Measures |
|---|---|---|---|---|
| Cycle Time | In-progress | Closed | No | Development efficiency |
| Lead Time | Created | Deployed | Yes | Total responsiveness |
Example
Task created: Monday 9am (enters backlog)
↓ [waits 2 days]
Task started: Wednesday 9am (moved to in-progress)
↓ [active work]
Task completed: Wednesday 5pm (moved to closed)
↓ [waits for deployment]
Task deployed: Thursday 2pm (delivered)
Cycle Time: 8 hours (Wednesday 9am → 5pm)
Lead Time: 3 days, 5 hours (Monday 9am → Thursday 2pm)
Why Both Matter
-
Short cycle time, long lead time: Work is efficient once started, but tasks wait too long in backlog
- Fix: Reduce WIP, start fewer tasks, finish faster
-
Long cycle time, short lead time: Work starts immediately but takes forever to complete
- Fix: Split tasks smaller, remove blockers, improve focus
-
Both long: Overall process is slow
- Fix: Address both backlog management AND development efficiency
Tracking Over Time
# Average cycle time (manual calculation)
# For each closed task: (closed_at - started_at)
# Sum and divide by task count
# Trend analysis
# Week 1: Avg cycle time = 3 days
# Week 2: Avg cycle time = 2 days ✅ Improving
# Week 3: Avg cycle time = 4 days ❌ Getting worse
Improvement Targets
- Cycle time: Reduce by splitting tasks, removing blockers, improving focus
- Lead time: Reduce by prioritizing backlog, reducing WIP, faster deployment
Work in Progress (WIP)
# All in-progress tasks
bd list --status in-progress
# Count
bd list --status in-progress | grep "^bd-" | wc -l
WIP Limits
Work in Progress limits prevent overcommitment and identify bottlenecks.
Setting WIP limits:
- Personal WIP limit: 1-2 tasks in-progress at a time
- Team WIP limit: Depends on team size and workflow stages
- Rule of thumb: WIP limit = (Team size ÷ 2) + 1
Example for individual developer:
✅ Good: 1 task in-progress, 0-1 in code review
❌ Bad: 5 tasks in-progress simultaneously
Example for team of 6:
Workflow stages and limits:
- Backlog: Unlimited
- Ready: 8 items max
- In Progress: 4 items max (team size ÷ 2 + 1)
- Code Review: 3 items max
- Testing: 2 items max
- Done: Unlimited
Why WIP Limits Matter
- Focus: Fewer tasks means deeper focus, faster completion
- Flow: Prevents bottlenecks from accumulating
- Quality: Less context switching, fewer mistakes
- Visibility: High WIP indicates blocked work or overcommitment
Monitoring WIP
# Check personal WIP
bd list --status in-progress | grep "assignee:me" | wc -l
# If > 2: Focus on finishing before starting new work
Red Flags
- WIP consistently at or above limit (need more capacity or smaller tasks)
- WIP growing week-over-week (work piling up, not finishing)
- WIP high but velocity low (tasks blocked or too large)
Response to High WIP
- Finish existing tasks before starting new ones
- Identify and remove blockers
- Split large tasks
- Add capacity (if chronically high)
Bottleneck Identification
# Find tasks that are blocking others
# (Tasks that many other tasks depend on)
for task in $(bd list --status open | grep "^bd-" | cut -d: -f1); do
echo -n "$task: "
bd list --status open | xargs -I {} sh -c "bd show {} | grep -q \"depends on $task\" && echo {}" | wc -l
done | sort -t: -k2 -n -r
# Shows tasks with most dependencies (top bottlenecks)