bd Metrics Guide

This guide covers the key metrics for tracking work in bd.

Cycle Time vs. Lead Time

Two distinct time measurements:

Cycle Time

  • Definition: Time from "work started" to "work completed"
  • Start: When task moves to "in-progress" status
  • End: When task moves to "closed" status
  • Measures: How efficiently work flows through active development
  • Use: Identify process inefficiencies, improve development speed
# Calculate cycle time for completed task
bd show bd-5 | grep "status.*in-progress" # Get start time
bd show bd-5 | grep "status.*closed"      # Get end time
# Difference = cycle time

Lead Time

  • Definition: Time from "request created" to "delivered to customer"
  • Start: When task is created (enters backlog)
  • End: When task is deployed/delivered
  • Measures: Overall responsiveness to requests
  • Use: Set realistic expectations, measure total process duration
# Calculate lead time for completed task
bd show bd-5 | grep "created_at"    # Get creation time
bd show bd-5 | grep "deployed_at"   # Get deployment time (if tracked)
# Difference = lead time

Key Differences

Metric Starts Ends Includes Waiting? Measures
Cycle Time In-progress Closed No Development efficiency
Lead Time Created Deployed Yes Total responsiveness

Example

Task created: Monday 9am (enters backlog)
↓ [waits 2 days]
Task started: Wednesday 9am (moved to in-progress)
↓ [active work]
Task completed: Wednesday 5pm (moved to closed)
↓ [waits for deployment]
Task deployed: Thursday 2pm (delivered)

Cycle Time: 8 hours (Wednesday 9am → 5pm)
Lead Time: 3 days, 5 hours (Monday 9am → Thursday 2pm)

Why Both Matter

  • Short cycle time, long lead time: Work is efficient once started, but tasks wait too long in backlog

    • Fix: Reduce WIP, start fewer tasks, finish faster
  • Long cycle time, short lead time: Work starts immediately but takes forever to complete

    • Fix: Split tasks smaller, remove blockers, improve focus
  • Both long: Overall process is slow

    • Fix: Address both backlog management AND development efficiency

Tracking Over Time

# Average cycle time (manual calculation)
# For each closed task: (closed_at - started_at)
# Sum and divide by task count

# Trend analysis
# Week 1: Avg cycle time = 3 days
# Week 2: Avg cycle time = 2 days  ✅ Improving
# Week 3: Avg cycle time = 4 days  ❌ Getting worse

Improvement Targets

  • Cycle time: Reduce by splitting tasks, removing blockers, improving focus
  • Lead time: Reduce by prioritizing backlog, reducing WIP, faster deployment

Work in Progress (WIP)

# All in-progress tasks
bd list --status in-progress

# Count
bd list --status in-progress | grep "^bd-" | wc -l

WIP Limits

Work in Progress limits prevent overcommitment and identify bottlenecks.

Setting WIP limits:

  • Personal WIP limit: 1-2 tasks in-progress at a time
  • Team WIP limit: Depends on team size and workflow stages
  • Rule of thumb: WIP limit = (Team size ÷ 2) + 1

Example for individual developer:

✅ Good: 1 task in-progress, 0-1 in code review
❌ Bad: 5 tasks in-progress simultaneously

Example for team of 6:

Workflow stages and limits:
- Backlog: Unlimited
- Ready: 8 items max
- In Progress: 4 items max  (team size ÷ 2 + 1)
- Code Review: 3 items max
- Testing: 2 items max
- Done: Unlimited

Why WIP Limits Matter

  1. Focus: Fewer tasks means deeper focus, faster completion
  2. Flow: Prevents bottlenecks from accumulating
  3. Quality: Less context switching, fewer mistakes
  4. Visibility: High WIP indicates blocked work or overcommitment

Monitoring WIP

# Check personal WIP
bd list --status in-progress | grep "assignee:me" | wc -l

# If > 2: Focus on finishing before starting new work

Red Flags

  • WIP consistently at or above limit (need more capacity or smaller tasks)
  • WIP growing week-over-week (work piling up, not finishing)
  • WIP high but velocity low (tasks blocked or too large)

Response to High WIP

  1. Finish existing tasks before starting new ones
  2. Identify and remove blockers
  3. Split large tasks
  4. Add capacity (if chronically high)

Bottleneck Identification

# Find tasks that are blocking others
# (Tasks that many other tasks depend on)
for task in $(bd list --status open | grep "^bd-" | cut -d: -f1); do
  echo -n "$task: "
  bd list --status open | xargs -I {} sh -c "bd show {} | grep -q \"depends on $task\" && echo {}" | wc -l
done | sort -t: -k2 -n -r

# Shows tasks with most dependencies (top bottlenecks)