name, description
| name | description |
|---|---|
| finishing-a-development-branch | Use when implementation complete and tests pass - closes bd epic, presents integration options (merge/PR/keep/discard), executes choice |
<skill_overview> Close bd epic, verify tests pass, present 4 integration options, execute choice, cleanup worktree appropriately. </skill_overview>
<rigidity_level> LOW FREEDOM - Follow the 6-step process exactly. Present exactly 4 options. Never skip test verification. Must confirm before discarding. </rigidity_level>
<quick_reference>
| Step | Action | If Blocked |
|---|---|---|
| 1 | Close bd epic | Tasks still open → STOP |
| 2 | Verify tests pass (test-runner agent) | Tests fail → STOP |
| 3 | Determine base branch | Ask if needed |
| 4 | Present exactly 4 options | Wait for choice |
| 5 | Execute choice | Follow option workflow |
| 6 | Cleanup worktree (options 1,2,4 only) | Option 3 keeps worktree |
Options: 1=Merge locally, 2=PR, 3=Keep as-is, 4=Discard (confirm) </quick_reference>
<when_to_use>
- Implementation complete and reviewed
- All bd tasks for epic are done
- Ready to integrate work back to main branch
- Called by hyperpowers:review-implementation (final step)
Don't use for:
- Work still in progress
- Tests failing
- Epic has open tasks
- Mid-implementation (use hyperpowers:executing-plans) </when_to_use>
<the_process>
Step 1: Close bd Epic
Announce: "I'm using hyperpowers:finishing-a-development-branch to complete this work."
Verify all tasks closed:
bd dep tree bd-1 # Show task tree
bd list --status open --parent bd-1 # Check for open tasks
If any tasks still open:
Cannot close epic bd-1: N tasks still open:
- bd-3: Task Name (status: in_progress)
- bd-5: Task Name (status: open)
Complete all tasks before finishing.
STOP. Do not proceed.
If all tasks closed:
bd close bd-1
Step 2: Verify Tests
IMPORTANT: Use hyperpowers:test-runner agent to avoid context pollution.
Dispatch hyperpowers:test-runner agent:
Run: cargo test
(or: npm test / pytest / go test ./...)
Agent returns summary + failures only.
If tests fail:
Tests failing (N failures). Must fix before completing:
[Show failures]
Cannot proceed until tests pass.
STOP. Do not proceed.
If tests pass: Continue to Step 3.
Step 3: Determine Base Branch
git merge-base HEAD main 2>/dev/null || git merge-base HEAD master 2>/dev/null
Or ask: "This branch split from main - is that correct?"
Step 4: Present Options
Present exactly these 4 options:
Implementation complete. What would you like to do?
1. Merge back to <base-branch> locally
2. Push and create a Pull Request
3. Keep the branch as-is (I'll handle it later)
4. Discard this work
Which option?
Don't add explanation. Keep concise.
Step 5: Execute Choice
Option 1: Merge Locally
git checkout <base-branch>
git pull
git merge <feature-branch>
# Verify tests on merged result
Dispatch hyperpowers:test-runner: "Run: <test command>"
# If tests pass
git branch -d <feature-branch>
Then: Step 6 (cleanup worktree)
Option 2: Push and Create PR
Get epic info:
bd show bd-1
bd dep tree bd-1
Create PR:
git push -u origin <feature-branch>
gh pr create --title "feat: <epic-name>" --body "$(cat <<'EOF'
## Epic
Closes bd-<N>: <Epic Title>
## Summary
<2-3 bullets from epic implementation>
## Tasks Completed
- bd-2: <Task Name>
- bd-3: <Task Name>
## Test Plan
- [ ] All tests passing
- [ ] <verification steps from epic>
EOF
)"
Then: Step 6 (cleanup worktree)
Option 3: Keep As-Is
Report: "Keeping branch . Worktree preserved at ."
Don't cleanup worktree.
Option 4: Discard
Confirm first:
This will permanently delete:
- Branch <name>
- All commits: <commit-list>
- Worktree at <path>
Type 'discard' to confirm.
Wait for exact "discard" confirmation.
If confirmed:
git checkout <base-branch>
git branch -D <feature-branch>
Then: Step 6 (cleanup worktree)
Step 6: Cleanup Worktree
For Options 1, 2, 4 only:
# Check if in worktree
git worktree list | grep $(git branch --show-current)
# If yes
git worktree remove <worktree-path>
For Option 3: Keep worktree (don't cleanup). </the_process>
Developer skips test verification before presenting options
# Step 1: Epic closed ✓
bd close bd-1
Step 2: SKIPPED test verification
Jump directly to presenting options
"Implementation complete. What would you like to do?
- Merge back to main locally
- Push and create PR
..."
User selects Option 1
git checkout main
git merge feature-branch
Tests fail! Broken code now on main
<why_it_fails>
- Skipped mandatory test verification
- Merged broken code to main branch
- Other developers pull broken main
- CI/CD fails, blocks deployment
- Must revert, fix, merge again (wasted time) </why_it_fails>
# After closing epic
bd close bd-1 ✓
# MANDATORY: Verify tests BEFORE presenting options
Dispatch hyperpowers:test-runner agent: "Run: cargo test"
# Agent reports
"Test suite passed (127 tests, 0 failures, 2.3s)"
# NOW present options
"Implementation complete. What would you like to do?
1. Merge back to main locally
..."
What you gain:
- Confidence tests pass before integration
- No broken code merged to main
- CI/CD stays green
- Other developers unblocked
- Professional workflow
# User selects Option 2: Create PR
git push -u origin feature-auth
gh pr create --title "feat: Add OAuth" --body "..."
Developer immediately cleans up worktree
git worktree remove ../feature-auth-worktree
PR gets feedback: "Please add rate limiting"
User: "Can you address the PR feedback?"
Worktree is gone! Have to recreate it
git worktree add ../feature-auth-worktree feature-auth
Lost local state, uncommitted experiments, etc.
<why_it_fails>
- Cleaned worktree when PR still active
- User likely needs worktree for PR feedback
- Have to recreate worktree for changes
- Lost any local uncommitted work
- Inefficient workflow </why_it_fails>
git push -u origin feature-auth
gh pr create --title "feat: Add OAuth" --body "..."
# Report PR created
"Pull request created: https://github.com/user/repo/pull/42
Keeping worktree at ../feature-auth-worktree for PR updates."
# NO worktree cleanup
# User can address PR feedback in same worktree
Cleanup happens later when:
- PR is merged
- User explicitly requests cleanup
- User uses finishing-a-development-branch again after PR merges
What you gain:
- Worktree available for PR feedback
- No need to recreate worktree
- Preserve local state and experiments
- Efficient PR iteration workflow
# User says: "Actually, discard this work"
Developer immediately executes
git checkout main
git branch -D feature-experimental
git worktree remove ../feature-experimental-worktree
50 commits deleted
User: "Wait, I meant discard the LAST commit, not the whole branch!"
Too late - work is gone
<why_it_fails>
- No confirmation before destructive action
- Misunderstood user intent
- Permanent data loss
- No way to recover work
- Catastrophic for user </why_it_fails>
User: "Discard this work"
"This will permanently delete:
- Branch feature-experimental
- All commits:
* a1b2c3d Add OAuth integration
* d4e5f6g Add rate limiting
* g7h8i9j Update tests
... (47 more commits)
- Worktree at ../feature-experimental-worktree
Type 'discard' to confirm."
# WAIT for exact confirmation
User types: "discard"
# NOW execute
git checkout main
git branch -D feature-experimental
git worktree remove ../feature-experimental-worktree
"Branch feature-experimental deleted."
What you gain:
- User sees exactly what will be deleted
- Explicit confirmation required
- Prevents accidental data loss
- Time to reconsider or clarify
- Safe destructive operations
<option_matrix>
| Option | Merge | Push | Keep Worktree | Cleanup Branch | Cleanup Worktree |
|---|---|---|---|---|---|
| 1. Merge locally | ✓ | - | - | ✓ | ✓ |
| 2. Create PR | - | ✓ | ✓ | - | - |
| 3. Keep as-is | - | - | ✓ | - | - |
| 4. Discard | - | - | - | ✓ (force) | ✓ |
| </option_matrix> |
<critical_rules>
Rules That Have No Exceptions
- Never skip test verification → Tests must pass before presenting options
- Present exactly 4 options → No open-ended questions
- Require confirmation for Option 4 → Type "discard" exactly
- Keep worktree for Options 2 & 3 → PR and keep-as-is need worktree
- Verify tests after merge (Option 1) → Merged result might break
Common Excuses
All of these mean: STOP. Follow the process.
- "Tests passed earlier, don't need to verify" (Might have changed, verify now)
- "User knows what they want" (Present options, let them choose)
- "Obvious they want to discard" (Require explicit confirmation)
- "PR done, cleanup worktree" (PR likely needs updates, keep worktree)
- "Too many options" (Exactly 4, no more, no less) </critical_rules>
<verification_checklist> Before completing:
- bd epic closed (all child tasks closed)
- Tests verified passing (via test-runner agent)
- Presented exactly 4 options (no open-ended questions)
- Waited for user choice (didn't assume)
- If Option 4: Got typed "discard" confirmation
- Worktree cleaned for Options 1, 4 only (not 2, 3)
- If Option 1: Verified tests on merged result
Can't check all boxes? Return to process and complete missing steps. </verification_checklist>
**This skill is called by:** - hyperpowers:review-implementation (final step after approval)Call chain:
hyperpowers:executing-plans → hyperpowers:review-implementation → hyperpowers:finishing-a-development-branch
↓
(if gaps found: STOP)
This skill calls:
- hyperpowers:test-runner agent (for test verification)
- bd commands (epic management)
- gh commands (PR creation)
CRITICAL: Never read .beads/issues.jsonl directly. Always use bd CLI commands.
When stuck:
- Tasks won't close → Check bd status, verify all child tasks done
- Tests fail → Fix before presenting options (can't proceed)
- User unsure → Explain options, but don't make choice for them
- Worktree won't remove → Might have uncommitted changes, ask user