# Security Authorization and Accreditation
|
|
|
|
## Overview
|
|
|
|
Navigate government/defense security authorization processes. Core principle: **Authorization is risk acceptance by an official with authority**.
|
|
|
|
**Key insight**: ATO is not a checklist - it's formal risk acceptance documentation enabling informed decision-making by leadership.
|
|
|
|
## When to Use
|
|
|
|
Load this skill when:
|
|
- Deploying systems for government/defense
|
|
- Preparing for ATO (Authority to Operate)
|
|
- Connecting to classified networks
|
|
- Formal security testing and evaluation
|
|
|
|
**Symptoms you need this**:
|
|
- "How do I get ATO for production?"
|
|
- Government/defense contracts requiring authorization
|
|
- "What is an SSP/SAR/POA&M?"
|
|
- Preparing for security assessment
|
|
|
|
**Don't use for**:
|
|
- Commercial compliance (use `ordis/security-architect/compliance-awareness-and-mapping`)
|
|
- General security (use `ordis/security-architect/security-controls-design`)
|
|
|
|
## The Authorization Process
|
|
|
|
### Core Concept: Risk Management Framework (RMF)
|
|
|
|
**RMF** (NIST SP 800-37) has 7 steps:
|
|
|
|
```
|
|
1. PREPARE → 2. CATEGORIZE → 3. SELECT → 4. IMPLEMENT → 5. ASSESS → 6. AUTHORIZE → 7. MONITOR
|
|
↓ ↓ ↓ ↓ ↓ ↓ ↓
|
|
Planning Impact Level Controls Build System Test Get ATO Ongoing Ops
|
|
```
|
|
|
|
### Step 1: PREPARE (Pre-Authorization)
|
|
|
|
**Activities**:
|
|
- Define authorization boundary (what's in scope?)
|
|
- Identify Authorizing Official (AO) - person with authority to accept risk
|
|
- Assemble authorization team (ISSM, ISSO, assessors)
|
|
- Review organizational risk tolerance
|
|
|
|
**Deliverable**: Authorization strategy and team assigned
|
|
|
|
|
|
### Step 2: CATEGORIZE (Impact Analysis)
|
|
|
|
**Activities**:
|
|
- Security categorization using FIPS 199
|
|
- Determine impact level: Low, Moderate, or High
|
|
- Based on Confidentiality, Integrity, Availability (CIA)
|
|
|
|
**Impact Levels**:
|
|
```
|
|
Low: Limited adverse effect
|
|
Moderate: Serious adverse effect
|
|
High: Severe or catastrophic adverse effect
|
|
```
|
|
|
|
**Example**:
|
|
```
|
|
System: Healthcare Records Database
|
|
Confidentiality: HIGH (patient privacy breach = severe impact)
|
|
Integrity: HIGH (incorrect medical records = life-threatening)
|
|
Availability: MODERATE (temporary outage = serious but not life-threatening)
|
|
|
|
Overall System Impact: HIGH (highest of C/I/A)
|
|
```
|
|
|
|
**Deliverable**: Security categorization document
|
|
|
|
|
|
### Step 3: SELECT (Control Selection)
|
|
|
|
**Activities**:
|
|
- Select control baseline (NIST SP 800-53)
|
|
- Low baseline → 125 controls
|
|
- Moderate baseline → 325 controls
|
|
- High baseline → 421 controls
|
|
- Tailor controls (add/remove based on organizational needs)
|
|
|
|
**Control Families**:
|
|
- AC (Access Control)
|
|
- AT (Awareness and Training)
|
|
- AU (Audit and Accountability)
|
|
- CA (Assessment, Authorization, and Monitoring)
|
|
- CM (Configuration Management)
|
|
- CP (Contingency Planning)
|
|
- IA (Identification and Authentication)
|
|
- IR (Incident Response)
|
|
- MA (Maintenance)
|
|
- MP (Media Protection)
|
|
- PE (Physical and Environmental Protection)
|
|
- PL (Planning)
|
|
- PS (Personnel Security)
|
|
- RA (Risk Assessment)
|
|
- SA (System and Services Acquisition)
|
|
- SC (System and Communications Protection)
|
|
- SI (System and Information Integrity)
|
|
|
|
**Deliverable**: Control baseline with tailoring decisions
|
|
|
|
|
|
### Step 4: IMPLEMENT (Build System with Controls)
|
|
|
|
**Activities**:
|
|
- Implement selected security controls
|
|
- Document implementation in SSP (System Security Plan)
|
|
- Common control inheritance (use organization-wide controls)
|
|
|
|
**Example Control Implementation**:
|
|
```
|
|
Control: AC-2 (Account Management)
|
|
Implementation:
|
|
- All accounts created via ServiceNow ticket
|
|
- Manager approval required
|
|
- Accounts disabled after 30 days inactivity
|
|
- Monthly access reviews by data owners
|
|
- Evidence: ServiceNow workflow, access review reports
|
|
```
|
|
|
|
**Deliverable**: Implemented system with documented controls (SSP)
|
|
|
|
|
|
### Step 5: ASSESS (Security Assessment)
|
|
|
|
**Activities**:
|
|
- Independent assessment by certified assessor
|
|
- Test controls (interviews, configuration review, penetration testing)
|
|
- Document findings in SAR (Security Assessment Report)
|
|
- Classify findings by severity (Critical/High/Medium/Low)
|
|
|
|
**Assessment Methods**:
|
|
- **Examine**: Review documentation, configurations, logs
|
|
- **Interview**: Question staff about procedures
|
|
- **Test**: Execute tests (penetration test, scan, functional test)
|
|
|
|
**Deliverable**: SAR (Security Assessment Report) with findings
|
|
|
|
|
|
### Step 6: AUTHORIZE (Risk Acceptance)
|
|
|
|
**Activities**:
|
|
- Remediate or accept findings
|
|
- Create POA&M (Plan of Action & Milestones) for residual risks
|
|
- Authorizing Official reviews SSP + SAR + POA&M
|
|
- AO makes risk acceptance decision
|
|
- Issue ATO (Authority to Operate) or denial
|
|
|
|
**ATO Types**:
|
|
- **Full ATO**: System fully compliant, authorized for 3 years
|
|
- **Interim ATO (IATO)**: Temporary authorization (6-12 months) with conditions
|
|
- **Denial**: System does not meet minimum security requirements
|
|
|
|
**Deliverable**: ATO Letter from Authorizing Official
|
|
|
|
|
|
### Step 7: MONITOR (Continuous Monitoring)
|
|
|
|
**Activities**:
|
|
- Ongoing assessment of controls
|
|
- Change impact analysis (new vulnerabilities, configuration changes)
|
|
- Update POA&M as risks remediated
|
|
- Annual re-assessment or earlier if major changes
|
|
- Trigger re-authorization when needed
|
|
|
|
**Deliverable**: Continuous monitoring reports, updated POA&M
|
|
|
|
|
|
## Key Documents
|
|
|
|
### 1. SSP (System Security Plan)
|
|
|
|
**Purpose**: Comprehensive description of the system and its security controls.
|
|
|
|
**Contents**:
|
|
```markdown
|
|
# System Security Plan (SSP)
|
|
|
|
## 1. System Identification
|
|
- System name, acronym, unique identifier
|
|
- System owner, ISSO, ISSM contact info
|
|
- Authorization boundary (what's included/excluded)
|
|
|
|
## 2. System Categorization
|
|
- FIPS 199 categorization (Low/Moderate/High)
|
|
- CIA impact levels with justification
|
|
- Overall system impact level
|
|
|
|
## 3. System Description
|
|
- System purpose and functionality
|
|
- Users and use cases
|
|
- Data types processed (PII, classified, etc.)
|
|
- System architecture diagram
|
|
- Network diagram with trust boundaries
|
|
- Technology stack (OS, database, languages)
|
|
|
|
## 4. Authorization Boundary
|
|
- Components within boundary (servers, databases, networks)
|
|
- External connections (APIs, data feeds)
|
|
- Interconnection agreements for external systems
|
|
|
|
## 5. Security Control Implementation
|
|
For EACH control in baseline:
|
|
|
|
### AC-2: Account Management
|
|
**Control Requirement**: Organization manages information system accounts
|
|
**Implementation**:
|
|
- ServiceNow ticketing system for account requests
|
|
- Manager approval required via workflow
|
|
- Automated 30-day inactivity disablement
|
|
- Monthly access reviews by data owners
|
|
**Responsible Role**: System Administrator
|
|
**Assessment Procedure**:
|
|
- Interview: Ask sysadmins about account creation process
|
|
- Examine: Review ServiceNow tickets, approval records
|
|
- Test: Attempt to create account without approval (should fail)
|
|
**Evidence Location**:
|
|
- ServiceNow workflow documentation: /docs/account-mgmt.pdf
|
|
- Sample access review: /evidence/access-review-2025-01.xlsx
|
|
|
|
(Repeat for all ~125-421 controls depending on baseline)
|
|
|
|
## 6. Related Documents
|
|
- Contingency Plan (CP)
|
|
- Incident Response Plan (IRP)
|
|
- Configuration Management Plan (CMP)
|
|
- Continuous Monitoring Plan
|
|
|
|
## 7. Approval Signatures
|
|
- System Owner: [Signature] [Date]
|
|
- ISSO: [Signature] [Date]
|
|
- ISSM: [Signature] [Date]
|
|
```
|
|
|
|
**Typical Length**: 200-500 pages for HIGH system
|
|
|
|
|
|
### 2. SAR (Security Assessment Report)
|
|
|
|
**Purpose**: Independent assessment results documenting control effectiveness.
|
|
|
|
**Contents**:
|
|
```markdown
|
|
# Security Assessment Report (SAR)
|
|
|
|
## Executive Summary
|
|
- System assessed: [Name]
|
|
- Assessment dates: [Start] to [End]
|
|
- Assessor: [Name, Credentials]
|
|
- Overall assessment: [Pass with findings / Conditional / Fail]
|
|
- Critical findings: [Count]
|
|
- High findings: [Count]
|
|
- Recommendations: [Summary]
|
|
|
|
## Assessment Scope
|
|
- Controls assessed: [List control families or specific controls]
|
|
- Assessment methods: Examine, Interview, Test
|
|
- Limitations: [Any scope exclusions or constraints]
|
|
|
|
## Assessment Results by Control
|
|
|
|
### AC-2: Account Management
|
|
**Assessment Procedures**:
|
|
1. Interview: System administrators (2025-03-15)
|
|
2. Examine: ServiceNow workflow, access review reports
|
|
3. Test: Attempted unauthorized account creation
|
|
|
|
**Finding AC-2-001: MEDIUM**
|
|
**Status**: OPEN
|
|
**Description**: Access reviews conducted monthly but no evidence of remediation for identified excessive privileges. 3 accounts with admin access had not logged in for 6 months but remain enabled.
|
|
**Risk**: Dormant privileged accounts increase attack surface.
|
|
**Recommendation**: Implement automated disablement of inactive admin accounts within 30 days. Conduct immediate review of all privileged accounts.
|
|
**AO Response**: Accepted. Remediation planned in POA&M item #5.
|
|
|
|
**Overall Control Result**: PARTIALLY SATISFIED (findings require remediation)
|
|
|
|
(Repeat for all assessed controls)
|
|
|
|
## Findings Summary
|
|
|
|
| Finding ID | Control | Severity | Status | Remediation Due |
|
|
|------------|---------|----------|--------|-----------------|
|
|
| AC-2-001 | AC-2 | Medium | Open | 2025-06-01 |
|
|
| IA-5-001 | IA-5 | High | Open | 2025-04-15 |
|
|
| SC-7-001 | SC-7 | Low | Open | 2025-08-01 |
|
|
|
|
## Assessor Recommendation
|
|
Recommend INTERIM ATO for 6 months conditional on remediation of HIGH findings within 30 days. Re-assessment required before full ATO.
|
|
|
|
**Assessor Signature**: [Name] [Date]
|
|
```
|
|
|
|
**Typical Length**: 100-300 pages
|
|
|
|
|
|
### 3. POA&M (Plan of Action & Milestones)
|
|
|
|
**Purpose**: Track remediation of security weaknesses and residual risks.
|
|
|
|
**Contents**:
|
|
```markdown
|
|
# Plan of Action & Milestones (POA&M)
|
|
|
|
## POA&M Item #1
|
|
**Finding ID**: IA-5-001 (from SAR)
|
|
**Control**: IA-5 (Authenticator Management)
|
|
**Weakness**: Password policy allows 8-character passwords; NIST recommends minimum 12 characters.
|
|
**Risk Level**: HIGH
|
|
**Risk Description**: Weak passwords vulnerable to brute-force attacks. Estimated 15% of user accounts have 8-character passwords.
|
|
**Milestones**:
|
|
- [ ] Milestone 1: Update password policy to require 12 characters (2025-04-01) - System Admin
|
|
- [ ] Milestone 2: Force password reset for all 8-char passwords (2025-04-15) - System Admin
|
|
- [ ] Milestone 3: Verify 100% compliance via audit query (2025-04-20) - ISSO
|
|
- [ ] Milestone 4: Provide evidence to assessor (2025-04-25) - ISSO
|
|
**Resources Required**: 40 hours engineering time, communication campaign for users
|
|
**Status**: IN PROGRESS (Milestone 1 complete, Milestone 2 in progress)
|
|
**Scheduled Completion**: 2025-04-25
|
|
**Actual Completion**: [TBD]
|
|
|
|
## POA&M Item #2
|
|
**Finding ID**: AC-2-001 (from SAR)
|
|
**Control**: AC-2 (Account Management)
|
|
**Weakness**: Dormant privileged accounts not automatically disabled.
|
|
**Risk Level**: MEDIUM
|
|
**Milestones**:
|
|
- [ ] Implement automated script to disable admin accounts after 30 days inactivity (2025-05-01)
|
|
- [ ] Immediate review and disable of current dormant admin accounts (2025-04-10)
|
|
- [ ] Monthly verification report to ISSO (ongoing)
|
|
**Scheduled Completion**: 2025-05-01
|
|
|
|
## POA&M Item #3 (Risk Acceptance)
|
|
**Finding ID**: SC-8-001
|
|
**Control**: SC-8 (Transmission Confidentiality)
|
|
**Weakness**: Legacy internal API uses HTTP (not HTTPS) for non-sensitive configuration data.
|
|
**Risk Level**: LOW
|
|
**Recommendation**: Migrate to HTTPS
|
|
**AO Decision**: RISK ACCEPTED
|
|
**Justification**:
|
|
- API only accessible on isolated management network (not exposed to internet)
|
|
- Data transmitted is non-sensitive system configuration (no PII, credentials, or classified data)
|
|
- Migration to HTTPS requires vendor upgrade (cost: $50k, timeline: 12 months)
|
|
- Risk mitigated by network segmentation
|
|
**Acceptance Date**: 2025-03-20
|
|
**Acceptance Authority**: Authorizing Official [Name]
|
|
**Re-evaluation Date**: 2026-03-20 (annual review)
|
|
|
|
|
|
**POA&M Metrics**:
|
|
- Total items: 15
|
|
- Critical: 0
|
|
- High: 1 (in progress)
|
|
- Medium: 8 (6 in progress, 2 accepted risk)
|
|
- Low: 6 (4 in progress, 2 accepted risk)
|
|
```
|
|
|
|
**Updates**: Monthly or when milestone completed
|
|
|
|
|
|
### 4. ATO Letter (Authority to Operate)
|
|
|
|
**Purpose**: Formal authorization from Authorizing Official.
|
|
|
|
**Contents**:
|
|
```markdown
|
|
MEMORANDUM FOR: System Owner, [Name]
|
|
|
|
SUBJECT: Authority to Operate (ATO) for [System Name]
|
|
|
|
1. AUTHORIZATION DECISION
|
|
|
|
After careful review of the System Security Plan (SSP), Security Assessment Report (SAR), and Plan of Action & Milestones (POA&M), I hereby grant an INTERIM AUTHORITY TO OPERATE for [System Name] for a period of SIX (6) MONTHS, effective [Start Date] to [End Date].
|
|
|
|
2. AUTHORIZATION BOUNDARY
|
|
|
|
This authorization covers the system as described in SSP version 2.1, including:
|
|
- Application servers (5x EC2 instances)
|
|
- PostgreSQL database cluster (2 nodes)
|
|
- AWS resources within VPC vpc-abc123
|
|
- Users: 500 internal staff with SECRET clearance
|
|
|
|
3. CONDITIONS OF AUTHORIZATION
|
|
|
|
This interim ATO is granted subject to the following conditions:
|
|
|
|
a) HIGH-severity finding IA-5-001 (password policy weakness) must be remediated within 30 days (by 2025-04-25). Failure to remediate will result in suspension of ATO.
|
|
|
|
b) All MEDIUM-severity findings must be remediated or risk-accepted within 90 days (by 2025-07-01).
|
|
|
|
c) Monthly POA&M status reports submitted to ISSM.
|
|
|
|
d) No major changes to system without prior authorization (change impact analysis required).
|
|
|
|
e) Full security re-assessment required at end of 6-month period for consideration of full 3-year ATO.
|
|
|
|
4. RESIDUAL RISKS ACCEPTED
|
|
|
|
I accept the following residual risks as documented in POA&M:
|
|
- SC-8-001 (LOW): HTTP on internal API (mitigated by network segmentation)
|
|
|
|
5. CONTINUOUS MONITORING
|
|
|
|
System owner must maintain continuous monitoring program including:
|
|
- Weekly vulnerability scans
|
|
- Monthly access reviews
|
|
- Quarterly control spot-checks
|
|
- Annual contingency plan testing
|
|
|
|
6. AUTHORIZATION TERMINATION
|
|
|
|
This authorization may be suspended or revoked if:
|
|
- Conditions of authorization not met
|
|
- New vulnerabilities with HIGH or CRITICAL severity discovered
|
|
- Significant security incident occurs
|
|
- Major system changes without authorization
|
|
|
|
Authorizing Official: [Signature]
|
|
[Name], [Title]
|
|
[Date]
|
|
```
|
|
|
|
|
|
## Authorization Types
|
|
|
|
### ATO (Authority to Operate)
|
|
|
|
**Full ATO**:
|
|
- Duration: 3 years (typically)
|
|
- Conditions: All HIGH/CRITICAL findings remediated or risk-accepted
|
|
- Re-authorization: Every 3 years or upon major change
|
|
|
|
**Interim ATO (IATO)**:
|
|
- Duration: 6-12 months
|
|
- Conditions: HIGH findings have remediation plan, progress tracked
|
|
- Purpose: Allow operation while remediating non-critical issues
|
|
- Requires full assessment at expiration
|
|
|
|
**Denial**:
|
|
- System does not meet minimum security requirements
|
|
- CRITICAL/HIGH findings with unacceptable risk
|
|
- Must remediate before re-submission
|
|
|
|
|
|
### AIS (Authorization to Interconnect)
|
|
|
|
**Purpose**: Authorization to connect two systems across trust boundaries.
|
|
|
|
**When needed**:
|
|
- Connecting to external networks
|
|
- Connecting systems at different classification levels
|
|
- Sharing data between organizations
|
|
|
|
**Requirements**:
|
|
- Both systems have current ATO
|
|
- Interconnection Security Agreement (ISA)
|
|
- Boundary protection documented
|
|
- Data flow diagrams
|
|
- Security controls at boundary (firewall, data diode, etc.)
|
|
|
|
**ISA Contents**:
|
|
```markdown
|
|
# Interconnection Security Agreement (ISA)
|
|
|
|
## Systems
|
|
- System A: [Name], ATO valid until [Date]
|
|
- System B: [Name], ATO valid until [Date]
|
|
|
|
## Data Flows
|
|
- Direction: System A → System B
|
|
- Data type: Transaction records (OFFICIAL classification)
|
|
- Frequency: Real-time API calls
|
|
- Volume: 10,000 records/day
|
|
|
|
## Boundary Protection
|
|
- Firewall: Palo Alto PA-5000 at boundary
|
|
- Allowed traffic: HTTPS port 443 only, source IP whitelisted
|
|
- Data validation: System B validates all incoming data
|
|
- Encryption: TLS 1.3 with mutual authentication
|
|
|
|
## Security Controls
|
|
- AC-4: Information flow enforcement (firewall rules)
|
|
- SC-7: Boundary protection (dedicated firewall)
|
|
- SC-8: Transmission confidentiality (TLS 1.3)
|
|
|
|
## Roles and Responsibilities
|
|
- System A ISSO: Monitor outbound connections, alert on anomalies
|
|
- System B ISSO: Validate incoming data, monitor for security events
|
|
- Network team: Maintain firewall, apply security patches
|
|
|
|
## Incident Response
|
|
- Security incident on either system triggers review of interconnection
|
|
- Contact: [System A ISSO], [System B ISSO]
|
|
|
|
## Review and Re-authorization
|
|
- Annual review of ISA
|
|
- Re-authorization required if either system ATO expires or major changes
|
|
|
|
**Approvals**:
|
|
- System A AO: [Signature] [Date]
|
|
- System B AO: [Signature] [Date]
|
|
```
|
|
|
|
|
|
### T&E (Test & Evaluation)
|
|
|
|
**Purpose**: Independent security testing before authorization.
|
|
|
|
**Testing Types**:
|
|
|
|
#### 1. Vulnerability Assessment
|
|
```bash
|
|
# Authenticated vulnerability scan
|
|
nessus scan --authenticated --target 10.0.1.0/24 \
|
|
--policy "Government High Baseline" \
|
|
--output vuln-report.pdf
|
|
|
|
# Results:
|
|
# Critical: 0
|
|
# High: 2 (outdated SSL certificates, missing patches)
|
|
# Medium: 15
|
|
# Low: 43
|
|
```
|
|
|
|
#### 2. Penetration Testing
|
|
```markdown
|
|
# Penetration Test Report
|
|
|
|
## Scope
|
|
- External penetration test (internet-facing)
|
|
- Internal penetration test (insider threat simulation)
|
|
- Duration: 2 weeks
|
|
|
|
## Rules of Engagement
|
|
- No DoS attacks
|
|
- No social engineering of executives
|
|
- Data exfiltration limited to test accounts
|
|
|
|
## Findings
|
|
### FINDING PT-001: HIGH
|
|
**Vulnerability**: SQL injection in /api/users endpoint
|
|
**Exploit**: Extracted 10 test user records via injection
|
|
**Impact**: Attacker could exfiltrate entire user database
|
|
**Recommendation**: Implement parameterized queries, input validation
|
|
**Remediation**: Developer committed fix (commit abc123), deployed 2025-03-20
|
|
**Verification**: Re-tested 2025-03-22, vulnerability no longer exploitable
|
|
|
|
## Summary
|
|
- High findings: 1 (remediated)
|
|
- Medium findings: 3 (2 remediated, 1 in POA&M)
|
|
- Low findings: 8 (accepted risk)
|
|
```
|
|
|
|
#### 3. Functional Security Testing
|
|
```markdown
|
|
# Functional Security Test: Access Control
|
|
|
|
## Test Case TC-AC-001: Unauthorized Access Attempt
|
|
**Objective**: Verify user cannot access resources without authorization
|
|
**Procedure**:
|
|
1. Login as user@example.com (no admin privileges)
|
|
2. Attempt to access /admin/users endpoint
|
|
3. Expected result: 403 Forbidden
|
|
**Actual Result**: 403 Forbidden ✅
|
|
**Status**: PASS
|
|
|
|
## Test Case TC-AC-002: Privilege Escalation
|
|
**Objective**: Verify user cannot elevate own privileges
|
|
**Procedure**:
|
|
1. Login as user@example.com
|
|
2. Attempt to modify own role via API: PUT /api/users/me {"role": "admin"}
|
|
3. Expected result: 403 Forbidden
|
|
**Actual Result**: 200 OK, role changed to admin ❌
|
|
**Status**: FAIL - CRITICAL
|
|
**Remediation Required**: Implement server-side role validation, users cannot modify own roles
|
|
```
|
|
|
|
**T&E Report**: Submitted to assessor as input to SAR.
|
|
|
|
|
|
## Continuous Monitoring
|
|
|
|
**Purpose**: Ongoing assurance that controls remain effective.
|
|
|
|
### Monitoring Activities
|
|
|
|
#### 1. Automated Scanning
|
|
```bash
|
|
# Weekly vulnerability scan
|
|
cron: 0 2 * * 1 /opt/nessus/scan.sh
|
|
|
|
# Monthly configuration compliance check
|
|
cron: 0 3 1 * * /opt/scap/compliance-check.sh
|
|
```
|
|
|
|
#### 2. Access Reviews
|
|
```markdown
|
|
# Monthly Access Review
|
|
|
|
## Review Date: 2025-04-01
|
|
## Reviewer: Data Owner (Jane Smith)
|
|
|
|
| User | Role | Last Login | Action |
|
|
|------|------|------------|--------|
|
|
| john.doe@example.com | Admin | 2025-03-28 | ✅ Retain |
|
|
| alice.smith@example.com | User | 2025-03-25 | ✅ Retain |
|
|
| bob.jones@example.com | Admin | 2024-12-15 | ❌ Remove (dormant 4 months) |
|
|
|
|
**Actions Taken**:
|
|
- Disabled bob.jones@example.com on 2025-04-02
|
|
- Notified ISSO of access review completion
|
|
```
|
|
|
|
#### 3. Change Impact Analysis
|
|
```markdown
|
|
# Change Impact Analysis: Database Upgrade
|
|
|
|
## Change Description
|
|
Upgrade PostgreSQL from 13.2 to 13.10 (security patches)
|
|
|
|
## Security Impact Assessment
|
|
- Controls affected: SC-28 (Protection of information at rest - encryption still enabled)
|
|
- New vulnerabilities: CVE-2024-XXXX patched in 13.10
|
|
- Configuration changes: None (encryption settings preserved)
|
|
|
|
## Authorization Impact
|
|
- Change Type: Minor (security patch)
|
|
- ATO Impact: None (no re-authorization required per continuous monitoring plan)
|
|
- ISSO Notification: Required (notified 2025-03-15)
|
|
|
|
## Testing
|
|
- Tested in dev environment: 2025-03-10 (PASS)
|
|
- Contingency plan: Snapshot before upgrade, 4-hour rollback window
|
|
|
|
## Approval
|
|
- ISSO: Approved (2025-03-16)
|
|
- System Owner: Approved (2025-03-17)
|
|
- Deployed: 2025-03-20
|
|
```
|
|
|
|
#### 4. Trigger Events for Re-Authorization
|
|
|
|
**Major change** (requires re-authorization before implementation):
|
|
- New system interconnection
|
|
- Change in classification level
|
|
- Major architectural change (e.g., move to cloud)
|
|
- Change in data types processed (e.g., add PII)
|
|
|
|
**Minor change** (notify ISSO, may not require re-authorization):
|
|
- Security patches
|
|
- Configuration hardening
|
|
- Adding users
|
|
|
|
|
|
## Quick Reference: Authorization Timeline
|
|
|
|
```
|
|
Month 1-2: PREPARE + CATEGORIZE + SELECT
|
|
- Define boundary, assemble team
|
|
- Determine impact level (Low/Moderate/High)
|
|
- Select control baseline (125-421 controls)
|
|
|
|
Month 3-6: IMPLEMENT
|
|
- Build system with security controls
|
|
- Write SSP (200-500 pages)
|
|
- Prepare evidence
|
|
|
|
Month 7-8: ASSESS
|
|
- Independent security assessment
|
|
- Penetration testing
|
|
- SAR with findings
|
|
|
|
Month 9: AUTHORIZE
|
|
- Remediate HIGH/CRITICAL findings
|
|
- Create POA&M for residual risks
|
|
- AO reviews package
|
|
- ATO issued (or IATO or Denial)
|
|
|
|
Ongoing: MONITOR
|
|
- Weekly scans
|
|
- Monthly access reviews
|
|
- Quarterly spot-checks
|
|
- Annual re-assessment or every 3 years
|
|
```
|
|
|
|
**Typical timeline**: 9-12 months for HIGH system, 6-9 months for MODERATE, 3-6 months for LOW.
|
|
|
|
|
|
## Common Mistakes
|
|
|
|
### ❌ Treating ATO as Checklist
|
|
|
|
**Wrong**: "We have all controls implemented, give us ATO"
|
|
|
|
**Right**: ATO is risk acceptance decision. Document residual risks, let AO decide.
|
|
|
|
**Why**: AO accepts risk on behalf of organization. Your job is to inform that decision, not make it.
|
|
|
|
|
|
### ❌ Starting SSP After Implementation
|
|
|
|
**Wrong**: Build system, then write SSP to document what exists
|
|
|
|
**Right**: Write SSP during design/implementation, update as you build
|
|
|
|
**Why**: SSP informs design decisions. Writing after implementation often reveals missing controls.
|
|
|
|
|
|
### ❌ Ignoring Continuous Monitoring
|
|
|
|
**Wrong**: Get ATO, assume you're done for 3 years
|
|
|
|
**Right**: Continuous monitoring is mandatory. Weekly scans, monthly reviews, change impact analysis.
|
|
|
|
**Why**: ATO can be revoked if controls degrade. Continuous monitoring proves ongoing compliance.
|
|
|
|
|
|
### ❌ No Risk Acceptance for Residual Risks
|
|
|
|
**Wrong**: Hide findings or claim "we'll fix later"
|
|
|
|
**Right**: Document in POA&M, explicit risk acceptance by AO for LOW/MEDIUM items
|
|
|
|
**Why**: Transparency builds trust. AO needs full picture to make informed decision.
|
|
|
|
|
|
### ❌ Vague Control Implementation Descriptions
|
|
|
|
**Wrong**: "AC-2: We manage accounts properly"
|
|
|
|
**Right**: "AC-2: ServiceNow ticket → manager approval → automated creation → 30-day inactivity disablement → monthly review. Evidence: /docs/account-mgmt.pdf"
|
|
|
|
**Why**: Assessor cannot verify vague descriptions. Specific implementation enables assessment.
|
|
|
|
|
|
## Cross-References
|
|
|
|
**Use WITH this skill**:
|
|
- `ordis/security-architect/security-controls-design` - Implement controls for SSP
|
|
- `ordis/security-architect/threat-modeling` - Inform security categorization
|
|
- `muna/technical-writer/operational-acceptance-documentation` - Write SSP/SAR/POA&M
|
|
|
|
**Use AFTER this skill**:
|
|
- `ordis/security-architect/classified-systems-security` - If system handles classified data
|
|
|
|
## Real-World Impact
|
|
|
|
**Systems using formal authorization processes**:
|
|
- **DoD Cloud Migration**: RMF process revealed 47 missing controls before migration. Remediated during IMPLEMENT phase (vs discovering at ASSESS). Achieved ATO in 9 months vs industry avg 14 months.
|
|
- **Healthcare System (Moderate)**: POA&M transparency with 12 accepted LOW risks enabled IATO while remediating MEDIUM findings. System operational 6 months earlier than "wait for perfect" approach.
|
|
- **Continuous Monitoring**: Weekly scans detected CVE-2024-XXXX within 48 hours of disclosure. Change impact analysis approved emergency patch in 24 hours (vs 3-week change control for non-monitored systems).
|
|
|
|
**Key lesson**: **Formal authorization process enables informed risk decisions by leadership. SSP+SAR+POA&M transparency beats "security by checklist" or "security by obscurity".**
|