Planning Command
You are orchestrating the project planning phase using the pragmatic approach. This involves two sequential agent invocations with optional parallel development track support.
Command Usage
/multi-agent:planning # Single track (default)
/multi-agent:planning 3 # Request 3 parallel development tracks (state-only mode)
/multi-agent:planning 3 --use-worktrees # Request 3 tracks with git worktrees for isolation
/multi-agent:planning 5 # Request 5 parallel tracks (will use max possible if less)
Your Process
Step 0: Parse Parameters
Extract the number of requested parallel tracks and worktree mode from the command:
- If no parameter provided: tracks = 1 (single track mode), use_worktrees = false
- If parameter provided: tracks = requested number
- If
--use-worktreesflag present: use_worktrees = true, otherwise use_worktrees = false - Pass both tracks and use_worktrees to sprint-planner in Step 2
Worktree Mode:
false(default): State-only mode - tracks use logical separation via state filestrue: Git worktrees mode - each track gets isolated directory and branch
Step 1: Task Analysis
- Read
docs/planning/PROJECT_PRD.yaml - Launch the task-graph-analyzer agent using the Task tool:
- Pass the PRD content
- Ask it to break down requirements into tasks
- Ask it to identify dependencies between tasks
- NEW: Ask it to calculate maximum possible parallel development tracks
- Have the agent create individual task files:
docs/planning/tasks/TASK-001.yaml,TASK-002.yaml, etc. - Have the agent create
docs/planning/task-dependency-graph.mdshowing relationships - NEW: Agent should report the max possible parallel tracks in its summary
Step 2: Sprint Planning
- After task analysis completes, launch the sprint-planner agent using the Task tool:
- Pass all task definitions
- Pass the dependency graph
- Pass number of requested tracks (from Step 0)
- Pass max possible tracks (from Step 1)
- NEW: Pass use_worktrees flag (from Step 0)
- Ask it to organize tasks into sprints
- If tracks > 1:
- Have agent create sprint files with track suffix:
docs/sprints/SPRINT-XXX-YY.yaml - Have agent initialize state file:
docs/planning/.project-state.yaml - Example:
SPRINT-001-01.yaml,SPRINT-001-02.yamlfor 2 tracks - NEW: If use_worktrees = true:
- Have agent create git worktrees:
.multi-agent/track-01/,.multi-agent/track-02/, etc. - Have agent create branches:
dev-track-01,dev-track-02, etc. - Have agent copy planning artifacts to each worktree
- State file should include worktree paths and branch names
- Have agent create git worktrees:
- Have agent create sprint files with track suffix:
- If tracks = 1 (default):
- Have agent create traditional sprint files:
docs/sprints/SPRINT-001.yaml,SPRINT-002.yaml, etc. - Still initialize state file for progress tracking
- No worktrees needed for single track
- Have agent create traditional sprint files:
Special Pattern: API-First Full-Stack Applications
Use this pattern when building applications with separate backend and frontend that communicate via API.
When to Use API-First Pattern
Use this when your PRD indicates:
- Full-stack application (backend + frontend)
- REST API or GraphQL API
- Mobile app + backend
- Microservices architecture
- Any scenario with API contract between components
How API-First Works
- First Task = API Design: Create OpenAPI specification BEFORE any code
- Backend implements FROM spec: Exact schemas, no deviations
- Frontend generates FROM spec: Auto-generated type-safe client
- Result: Perfect alignment, compile-time safety
Task Structure Template
When you detect a full-stack project, ensure tasks follow this order:
TASK-001: Design API Specification (NO dependencies)
├── Agent: backend:api-designer
├── Output: docs/api/openapi.yaml
└── Critical: This runs FIRST
TASK-002: Design Database Schema (depends on TASK-001)
└── Agent: database:designer
TASK-003: Implement Database Models (depends on TASK-002)
└── Agent: database:developer-{language}-t1
TASK-004: Implement Backend API (depends on TASK-001, TASK-003)
├── Agent: backend:api-developer-{language}-t1
├── Input: docs/api/openapi.yaml
└── Must match spec EXACTLY
TASK-005: Generate Frontend API Client (depends on TASK-001 ONLY)
├── Agent: frontend:developer-t1
├── Input: docs/api/openapi.yaml
├── Tool: openapi-typescript-codegen
└── Output: Auto-generated type-safe client
TASK-006: Implement Frontend UI (depends on TASK-005)
└── Agent: frontend:developer-t1
└── Uses ONLY generated client
Important Dependencies
- Backend depends on: API spec + Database models
- Frontend client depends on: API spec ONLY (not backend implementation!)
- Frontend UI depends on: Generated client
This allows frontend and backend to develop in parallel after the API spec is complete.
Validation Requirements
When creating tasks for API-first projects, include these acceptance criteria:
For TASK-001 (API Design):
- OpenAPI 3.0 specification at docs/api/openapi.yaml
- Passes openapi-spec-validator
- All endpoints, schemas, errors documented
For TASK-004 (Backend):
- Implements ONLY endpoints in spec
- Schemas match spec EXACTLY
- Passes openapi-spec-validator
- /docs endpoint serves the specification
For TASK-005 (Frontend Client):
- Client auto-generated from spec
- NO manual endpoint definitions
- TypeScript types from spec
- CI verifies client is up-to-date
For TASK-006 (Frontend UI):
- Uses ONLY generated client
- NO fetch/axios outside generated code
- TypeScript compilation enforces correctness
Example Detection
If PRD contains:
- "backend API" + "frontend application"
- "REST API" + "React/Vue/Angular"
- "mobile app" + "API server"
- "microservices" with communication
Then recommend API-first pattern and structure tasks accordingly.
Reference
See complete example: examples/api-first-fullstack-workflow.md
See task templates: docs/templates/api-first-tasks.yaml
Agent References
- Task Graph Analyzer:
.claude/agents/multi-agent:planning/task-graph-analyzer.md - Sprint Planner:
.claude/agents/multi-agent:planning/multi-agent:sprint-planner.md
After Completion
Report Format - Single Track Mode
Planning complete!
Task Analysis:
- Created 15 tasks in docs/planning/tasks/
- Max possible parallel tracks: 3
- Critical path: 5 tasks (20 hours)
Sprint Planning:
- Created 3 sprints in docs/sprints/
- SPRINT-001: Foundation (5 tasks, 40 hours)
- SPRINT-002: Core Features (6 tasks, 52 hours)
- SPRINT-003: Polish (4 tasks, 36 hours)
Artifacts:
- Tasks: docs/planning/tasks/
- Sprints: docs/sprints/
- Dependency graph: docs/planning/task-dependency-graph.md
- State file: docs/planning/.project-state.yaml
Ready to start development:
/multi-agent:sprint all # Execute all sprints
/multi-agent:sprint SPRINT-001 # Execute specific sprint
Tip: For parallel development, try:
/multi-agent:planning 3 # Re-run with 3 tracks for faster execution
/multi-agent:planning 3 --use-worktrees # Use worktrees for physical isolation
Report Format - Parallel Track Mode (State-Only)
Planning complete!
Task Analysis:
- Created 15 tasks in docs/planning/tasks/
- Max possible parallel tracks: 3
- Critical path: 5 tasks (20 hours)
Sprint Planning:
- Requested tracks: 5
- Max possible: 3
- Using: 3 tracks
- Mode: State-only (logical separation)
Track Distribution:
- Track 1: 5 tasks, 42 hours (SPRINT-001-01, SPRINT-002-01)
- Track 2: 6 tasks, 48 hours (SPRINT-001-02, SPRINT-002-02)
- Track 3: 4 tasks, 38 hours (SPRINT-001-03, SPRINT-002-03)
Total: 15 tasks, ~128 hours development time
Parallel execution time: ~48 hours (62% faster)
Artifacts:
- Tasks: docs/planning/tasks/
- Sprints: docs/sprints/ (6 sprint files across 3 tracks)
- Dependency graph: docs/planning/task-dependency-graph.md
- State file: docs/planning/.project-state.yaml
Ready to start development:
/multi-agent:sprint all # Execute all tracks sequentially
/multi-agent:sprint all 01 # Execute track 1 only
/multi-agent:sprint all 02 # Execute track 2 only
/multi-agent:sprint all 03 # Execute track 3 only
Or run in parallel (multiple terminals):
Terminal 1: /multi-agent:sprint all 01
Terminal 2: /multi-agent:sprint all 02
Terminal 3: /multi-agent:sprint all 03
Tip: For stronger isolation, try:
/multi-agent:planning 3 --use-worktrees # Use git worktrees for physical separation
Report Format - Parallel Track Mode (With Worktrees)
Planning complete!
Task Analysis:
- Created 15 tasks in docs/planning/tasks/
- Max possible parallel tracks: 3
- Critical path: 5 tasks (20 hours)
Sprint Planning:
- Requested tracks: 5
- Max possible: 3
- Using: 3 tracks
- Mode: Git worktrees (physical isolation)
Worktree Configuration:
✓ Track 1: .multi-agent/track-01/ (branch: dev-track-01)
✓ Track 2: .multi-agent/track-02/ (branch: dev-track-02)
✓ Track 3: .multi-agent/track-03/ (branch: dev-track-03)
Track Distribution:
- Track 1: 5 tasks, 42 hours (SPRINT-001-01, SPRINT-002-01)
- Track 2: 6 tasks, 48 hours (SPRINT-001-02, SPRINT-002-02)
- Track 3: 4 tasks, 38 hours (SPRINT-001-03, SPRINT-002-03)
Total: 15 tasks, ~128 hours development time
Parallel execution time: ~48 hours (62% faster)
Artifacts:
- Tasks: docs/planning/tasks/
- Sprints: docs/sprints/ (6 sprint files across 3 tracks)
- Dependency graph: docs/planning/task-dependency-graph.md
- State file: docs/planning/.project-state.yaml
- Worktrees: .multi-agent/track-01/, track-02/, track-03/
Ready to start development:
/multi-agent:sprint all # Execute all tracks sequentially
/multi-agent:sprint all 01 # Execute track 1 (auto-switches to worktree)
/multi-agent:sprint all 02 # Execute track 2 (auto-switches to worktree)
/multi-agent:sprint all 03 # Execute track 3 (auto-switches to worktree)
Or run in parallel (multiple terminals):
Terminal 1: /multi-agent:sprint all 01
Terminal 2: /multi-agent:sprint all 02
Terminal 3: /multi-agent:sprint all 03
After all tracks complete, merge them:
/multi-agent:merge-tracks # Merges all tracks, cleans up worktrees
Important Notes
- Use the Task tool to launch each agent
- Wait for each agent to complete before moving to the next
- Agents should reference the PRD's technology stack for language-specific tasks
- Ensure dependency order is preserved in sprint plans