# Backcasting Method
|
|
|
|
## Temporal Reasoning from Future to Present
|
|
|
|
**Backcasting** is the practice of starting from a future state and working backward to identify the path that led there.
|
|
|
|
**Contrast with forecasting:**
|
|
- **Forecasting:** Present → Future (What will happen?)
|
|
- **Backcasting:** Future → Present (How did this happen?)
|
|
|
|
---
|
|
|
|
## The Structured Backcasting Process
|
|
|
|
### Phase 1: Define the Future State
|
|
|
|
**Step 1.1: Set the resolution date**
|
|
- When will you know if the prediction came true?
|
|
- Be specific: "December 31, 2025"
|
|
|
|
**Step 1.2: State the outcome as a certainty**
|
|
- Don't say "might fail" or "probably fails"
|
|
- Say "HAS failed" or "DID fail"
|
|
- Use past tense
|
|
|
|
**Step 1.3: Emotional calibration**
|
|
- How surprising is this outcome?
|
|
- Shocking → You were very overconfident
|
|
- Expected → Appropriate confidence
|
|
- Inevitable → You were underconfident
|
|
|
|
---
|
|
|
|
### Phase 2: Construct the Timeline
|
|
|
|
**Step 2.1: Work backward in time chunks**
|
|
|
|
Start at resolution date, work backward in intervals:
|
|
|
|
**For 2-year prediction:**
|
|
- Resolution date (final failure)
|
|
- 6 months before (late-stage warning)
|
|
- 1 year before (mid-stage problems)
|
|
- 18 months before (early signs)
|
|
- Start date (initial conditions)
|
|
|
|
**For 6-month prediction:**
|
|
- Resolution date
|
|
- 1 month before
|
|
- 3 months before
|
|
- Start date
|
|
|
|
---
|
|
|
|
**Step 2.2: Fill in each time chunk**
|
|
|
|
For each period, ask:
|
|
- What was happening at this time?
|
|
- What decisions were made?
|
|
- What external events occurred?
|
|
- What warning signs appeared?
|
|
|
|
**Template:**
|
|
```
|
|
[Date]: [Event that occurred]
|
|
Effect: [How this contributed to failure]
|
|
Warning sign: [What would have indicated this was coming]
|
|
```
|
|
|
|
---
|
|
|
|
### Phase 3: Identify Causal Chains
|
|
|
|
**Step 3.1: Map the causal structure**
|
|
|
|
```
|
|
Initial condition → Trigger event → Cascade → Failure
|
|
```
|
|
|
|
**Example:**
|
|
```
|
|
Team overworked → Key engineer quit → Lost 3 months → Missed deadline → Funding fell through → Failure
|
|
```
|
|
|
|
---
|
|
|
|
**Step 3.2: Classify causes**
|
|
|
|
| Type | Description | Example |
|
|
|------|-------------|---------|
|
|
| **Necessary** | Without this, failure wouldn't happen | Regulatory ban |
|
|
| **Sufficient** | This alone causes failure | Founder death |
|
|
| **Contributing** | Makes failure more likely | Market downturn |
|
|
| **Catalytic** | Speeds up inevitable failure | Competitor launch |
|
|
|
|
---
|
|
|
|
**Step 3.3: Find the "brittle point"**
|
|
|
|
**Question:** Which single event, if prevented, would have avoided failure?
|
|
|
|
This is your **critical dependency** and highest-priority monitoring target.
|
|
|
|
---
|
|
|
|
### Phase 4: Narrative Construction
|
|
|
|
**Step 4.1: Write the headlines**
|
|
|
|
Imagine you're a journalist covering this failure. What headlines mark the timeline?
|
|
|
|
**Example:**
|
|
- "Startup X raises $10M Series A" (12 months before)
|
|
- "Startup X faces regulatory scrutiny" (9 months before)
|
|
- "Key executive departs Startup X" (6 months before)
|
|
- "Startup X misses Q3 targets" (3 months before)
|
|
- "Startup X shuts down, cites regulatory pressure" (resolution)
|
|
|
|
---
|
|
|
|
**Step 4.2: Write the obituary**
|
|
|
|
"Startup X failed because..."
|
|
|
|
Complete this sentence with a single, clear causal narrative. Force yourself to be concise.
|
|
|
|
**Good:**
|
|
"Startup X failed because regulatory uncertainty froze customer adoption, leading to missed revenue targets and inability to raise Series B."
|
|
|
|
**Bad (too vague):**
|
|
"Startup X failed because of various challenges."
|
|
|
|
---
|
|
|
|
**Step 4.3: The insider vs outsider narrative**
|
|
|
|
**Insider view:** What would the founders say?
|
|
- "We underestimated regulatory risk"
|
|
- "We hired too slowly"
|
|
- "We ran out of runway"
|
|
|
|
**Outsider view:** What would analysts say?
|
|
- "82% of startups in this space fail due to regulation"
|
|
- "Classic execution failure"
|
|
- "Unit economics never made sense"
|
|
|
|
**Compare:** Does your insider narrative match outsider base rates?
|
|
|
|
---
|
|
|
|
## Narrative vs Quantitative Backcasting
|
|
|
|
### Narrative Backcasting
|
|
|
|
**Strengths:**
|
|
- Rich, detailed stories
|
|
- Reveals unknown unknowns
|
|
- Good for complex systems
|
|
|
|
**Weaknesses:**
|
|
- Subject to narrative fallacy
|
|
- Can feel too "real" and bias you
|
|
- Hard to quantify
|
|
|
|
**Use when:**
|
|
- Complex, multi-causal failures
|
|
- Human/organizational factors dominate
|
|
- Need to surface blind spots
|
|
|
|
---
|
|
|
|
### Quantitative Backcasting
|
|
|
|
**Strengths:**
|
|
- Precise probability estimates
|
|
- Aggregates multiple failure modes
|
|
- Less subject to bias
|
|
|
|
**Weaknesses:**
|
|
- Requires data
|
|
- Can miss qualitative factors
|
|
- May feel mechanical
|
|
|
|
**Use when:**
|
|
- Statistical models exist
|
|
- Multiple independent failure modes
|
|
- Need to calculate confidence intervals
|
|
|
|
---
|
|
|
|
## Advanced Technique: Multiple Backcast Paths
|
|
|
|
### Generate 3-5 Different Failure Narratives
|
|
|
|
Instead of one story, create multiple:
|
|
|
|
**Path 1: Internal Execution Failure**
|
|
- Team burned out
|
|
- Product quality suffered
|
|
- Customers churned
|
|
- Revenue missed
|
|
- Funding dried up
|
|
|
|
**Path 2: External Market Shift**
|
|
- Competitor launched free tier
|
|
- Market commoditized
|
|
- Margins compressed
|
|
- Unit economics broke
|
|
- Shutdown
|
|
|
|
**Path 3: Regulatory Kill**
|
|
- New law passed
|
|
- Business model illegal
|
|
- Forced shutdown
|
|
|
|
**Path 4: Black Swan**
|
|
- Pandemic
|
|
- Supply chain collapse
|
|
- Force majeure
|
|
|
|
---
|
|
|
|
### Aggregate the Paths
|
|
|
|
**Calculate probability for each path:**
|
|
- Path 1 (Internal): 40%
|
|
- Path 2 (Market): 30%
|
|
- Path 3 (Regulatory): 20%
|
|
- Path 4 (Black Swan): 10%
|
|
|
|
**Total failure probability:** 100% (since we assumed failure)
|
|
|
|
**Insight:** But in reality, your prediction gives 25% failure. This means you're underestimating by 75 percentage points, OR these paths are not independent.
|
|
|
|
**Adjustment:**
|
|
If paths are partially overlapping (e.g., internal failure AND market shift), use:
|
|
```
|
|
P(A or B) = P(A) + P(B) - P(A and B)
|
|
```
|
|
|
|
---
|
|
|
|
## Temporal Reasoning Techniques
|
|
|
|
### The "Newspaper Test"
|
|
|
|
**Method:**
|
|
For each time period, imagine you're reading a newspaper from that date.
|
|
|
|
**What headlines would you see?**
|
|
- Macro news (economy, politics, technology)
|
|
- Industry news (competitors, regulations, trends)
|
|
- Company news (your specific case)
|
|
|
|
**This forces you to think about:**
|
|
- External context, not just internal execution
|
|
- Leading indicators, not just lagging outcomes
|
|
|
|
---
|
|
|
|
### The "Retrospective Interview"
|
|
|
|
**Method:**
|
|
Imagine you're interviewing someone 1 year after failure.
|
|
|
|
**Questions:**
|
|
- "Looking back, when did you first know this was in trouble?"
|
|
- "What was the moment of no return?"
|
|
- "If you could go back, what would you change?"
|
|
- "What signs did you ignore?"
|
|
|
|
**This reveals:**
|
|
- Early warning signals you should monitor
|
|
- Critical decision points
|
|
- Hindsight that can become foresight
|
|
|
|
---
|
|
|
|
### The "Parallel Universe" Technique
|
|
|
|
**Method:**
|
|
Create two timelines:
|
|
|
|
**Timeline A: Success**
|
|
What had to happen for success?
|
|
|
|
**Timeline B: Failure**
|
|
What happened instead?
|
|
|
|
**Divergence point:**
|
|
Where do the timelines split? That's your critical uncertainty.
|
|
|
|
---
|
|
|
|
## Common Backcasting Mistakes
|
|
|
|
### Mistake 1: Being Too Vague
|
|
|
|
**Bad:** "Things went wrong and it failed."
|
|
**Good:** "Q3 2024: Competitor X launched free tier. Q4 2024: We lost 30% of customers. Q1 2025: Revenue dropped below runway. Q2 2025: Failed to raise Series B. Q3 2025: Shutdown."
|
|
|
|
**Fix:** Force yourself to name specific events and dates.
|
|
|
|
---
|
|
|
|
### Mistake 2: Only Internal Causes
|
|
|
|
**Bad:** "We executed poorly."
|
|
**Good:** "We executed poorly AND market shifted AND regulation changed."
|
|
|
|
**Fix:** Use PESTLE framework to ensure external factors are considered.
|
|
|
|
---
|
|
|
|
### Mistake 3: Hindsight Bias
|
|
|
|
**Bad:** "It was always obvious this would fail."
|
|
**Good:** "In retrospect, these warning signs were present, but at the time they were ambiguous."
|
|
|
|
**Fix:** Acknowledge that foresight ≠ hindsight. Don't pretend everything was obvious.
|
|
|
|
---
|
|
|
|
### Mistake 4: Single-Cause Narratives
|
|
|
|
**Bad:** "Failed because of regulation."
|
|
**Good:** "Regulation was necessary but not sufficient. Also needed internal execution failure and market downturn to actually fail."
|
|
|
|
**Fix:** Multi-causal explanations are almost always more accurate.
|
|
|
|
---
|
|
|
|
## Integration with Forecasting
|
|
|
|
### How Backcasting Improves Forecasts
|
|
|
|
**Before Backcasting:**
|
|
- Forecast: 80% success
|
|
- Reasoning: Strong team, good market, solid plan
|
|
- Confidence interval: 70-90%
|
|
|
|
**After Backcasting:**
|
|
- Identified failure modes: Regulatory (20%), Execution (15%), Market (10%), Black Swan (5%)
|
|
- Total failure probability from backcasting: 50%
|
|
- **Realized:** Current 80% is too high
|
|
- **Adjusted forecast:** 60% success
|
|
- **Adjusted CI:** 45-75% (wider, reflecting uncertainty)
|
|
|
|
---
|
|
|
|
## Practical Workflow
|
|
|
|
### Quick Backcast (15 minutes)
|
|
|
|
1. **State outcome:** "It failed."
|
|
2. **One-sentence cause:** "Failed because..."
|
|
3. **Three key events:** Timeline points
|
|
4. **Probability check:** Does failure narrative feel >20% likely?
|
|
5. **Adjust:** If yes, lower confidence.
|
|
|
|
---
|
|
|
|
### Rigorous Backcast (60 minutes)
|
|
|
|
1. Define future state and resolution date
|
|
2. Create timeline working backward in chunks
|
|
3. Write detailed narrative for each period
|
|
4. Identify causal chains (necessary, sufficient, contributing)
|
|
5. Generate 3-5 alternative failure paths
|
|
6. Estimate probability of each path
|
|
7. Aggregate and compare to current forecast
|
|
8. Adjust probability and confidence intervals
|
|
9. Set monitoring signposts
|
|
10. Document assumptions
|
|
|
|
---
|
|
|
|
**Return to:** [Main Skill](../SKILL.md#interactive-menu)
|