# Reviews, Retros & Reflection: Advanced Methodologies
|
|
|
|
## Table of Contents
|
|
1. [Advanced Retrospective Formats](#1-advanced-retrospective-formats)
|
|
2. [Facilitation Techniques](#2-facilitation-techniques)
|
|
3. [Root Cause Analysis Methods](#3-root-cause-analysis-methods)
|
|
4. [Psychological Safety Building](#4-psychological-safety-building)
|
|
5. [Action Tracking and Metrics](#5-action-tracking-and-metrics)
|
|
6. [Remote and Async Retrospectives](#6-remote-and-async-retrospectives)
|
|
|
|
## 1. Advanced Retrospective Formats
|
|
|
|
### Lean Coffee (Self-Organizing Agenda)
|
|
|
|
**Setup**:
|
|
- Participants write topics on cards
|
|
- Group similar topics
|
|
- Dot vote to prioritize
|
|
- Discuss top topics time-boxed (5-7 min each)
|
|
- Thumbs up/down/sideways to continue or move on
|
|
|
|
**When**: Diverse team needs, unclear what to discuss, want emergent agenda
|
|
|
|
**Pros**: Democratic, surfaces unexpected issues, adapts to group needs
|
|
**Cons**: Can be unfocused, requires strong time-boxing
|
|
|
|
### Perfection Game (Aspirational)
|
|
|
|
**Process**:
|
|
1. Rate period 1-10 (10 = perfect)
|
|
2. "What did you like about this period?"
|
|
3. "What would make it a 10?"
|
|
4. Convert "make it 10" suggestions into actions
|
|
|
|
**When**: Positive framing needed, team demoralized, focus on future not past
|
|
|
|
**Pros**: Forward-looking, avoids negativity spiral, actionable
|
|
**Cons**: Can avoid real problems if not pushed for honesty
|
|
|
|
### Return on Time Invested (ROTI)
|
|
|
|
**Process**:
|
|
- Each participant rates retro value: thumb up (worth time), sideways (neutral), down (waste of time)
|
|
- Anonymous or public depending on culture
|
|
- Discuss: What made it valuable/not? How to improve next time?
|
|
|
|
**When**: End of every retro to improve retro itself
|
|
|
|
**Metrics to track**: % thumbs up over time (target: >80%)
|
|
|
|
### Starfish (Five Categories)
|
|
|
|
**Categories**:
|
|
- **Keep Doing**: Works well, maintain
|
|
- **Less Of**: Doing too much, scale back
|
|
- **More Of**: Doing some, do more
|
|
- **Stop Doing**: Not working, eliminate
|
|
- **Start Doing**: Not doing, should begin
|
|
|
|
**When**: More nuance than Start/Stop/Continue, want gradation
|
|
|
|
**Pros**: Spectrum of actions, acknowledges partial successes
|
|
**Cons**: More complex, can overwhelm with options
|
|
|
|
### Speedboat with Crew (Team Dynamics Focus)
|
|
|
|
**Extended metaphor**:
|
|
- **Captain** (leadership): What's steering us?
|
|
- **Crew** (team): What's propelling us?
|
|
- **Wind** (external help): What's helping externally?
|
|
- **Anchor** (drag): What's slowing us?
|
|
- **Rocks** (risks): What dangers ahead?
|
|
- **Shore** (safety): What's our safety net?
|
|
- **Island** (goal): Where are we going?
|
|
|
|
**When**: Complex team dynamics, cross-functional alignment, strategic context needed
|
|
|
|
### Kaleidoscope (Multiple Perspectives)
|
|
|
|
**Process**:
|
|
- Divide team into small groups (3-4 people)
|
|
- Each group discusses period from different lens:
|
|
- Customer perspective
|
|
- Business perspective
|
|
- Technical perspective
|
|
- Team health perspective
|
|
- Groups share findings
|
|
- Synthesize cross-perspective insights
|
|
|
|
**When**: Cross-functional team, need multiple viewpoints, large retro (>10 people)
|
|
|
|
## 2. Facilitation Techniques
|
|
|
|
### Balancing Participation
|
|
|
|
**Silent participants**:
|
|
- Call on directly with specific question
|
|
- Use round-robin (everyone speaks once before anyone twice)
|
|
- Silent brainstorming before verbal discussion
|
|
- Anonymous input (digital tools, sticky notes)
|
|
|
|
**Dominant participants**:
|
|
- "Let's hear from folks who haven't spoken yet"
|
|
- Time limits per person
|
|
- Parking lot for off-topic deep dives
|
|
- Private conversation outside retro if pattern persists
|
|
|
|
**Conflict emergence**:
|
|
- Acknowledge tension, don't dismiss
|
|
- Reframe as system/process issue, not personal
|
|
- Focus on data/facts, not judgments
|
|
- Table if too heated, address offline with parties
|
|
|
|
### Time-Boxing Discipline
|
|
|
|
**Visible timer**: Project countdown timer, everyone sees time remaining
|
|
|
|
**Gentle warnings**: "3 minutes left on this topic"
|
|
|
|
**Hard stops**: Move on even mid-discussion (capture in parking lot if needed)
|
|
|
|
**Flex time**: Reserve 10-15 min at end for parking lot topics if time permits
|
|
|
|
### Clustering and Affinity Mapping
|
|
|
|
**Process**:
|
|
1. Gather all items (sticky notes, digital cards)
|
|
2. Read aloud without discussion
|
|
3. Ask: "Which items are about the same thing?"
|
|
4. Physically group similar items
|
|
5. Name each cluster (theme)
|
|
6. Dot vote on clusters, not individual items
|
|
|
|
**Benefit**: Reduces 30 individual items to 5-6 themes, focuses discussion
|
|
|
|
### Dot Voting Variants
|
|
|
|
**Standard**: Each person gets 3-5 votes, distribute as they wish (can multi-vote same item)
|
|
|
|
**Forced distribution**: Must place votes on different items (prevents piling)
|
|
|
|
**Weighted**: Different color dots for "must discuss" (3 pts) vs "nice to have" (1 pt)
|
|
|
|
**Quadrant voting**: Vote on impact AND effort separately, plot on 2x2 matrix
|
|
|
|
### Parking Lot Management
|
|
|
|
**Purpose**: Capture important but off-topic ideas without derailing
|
|
|
|
**Process**:
|
|
- Visible "parking lot" section (whiteboard, digital doc)
|
|
- When topic emerges: "This is important. Let's park it and return if time."
|
|
- At end: Review parking lot, decide which to address (next retro, separate meeting, async)
|
|
|
|
**Don't let parking lot become graveyard**: Follow up or explicitly discard
|
|
|
|
## 3. Root Cause Analysis Methods
|
|
|
|
### 5 Whys (Iterative Questioning)
|
|
|
|
**Process**:
|
|
1. State problem: "We missed sprint goal by 20%"
|
|
2. Why? "Too much unplanned work came in"
|
|
3. Why? "Sales committed features without engineering input"
|
|
4. Why? "No clear process for vetting customer requests"
|
|
5. Why? "We haven't defined roles in customer escalations"
|
|
6. Why? "Product/Sales alignment meetings were cancelled repeatedly"
|
|
|
|
**Root cause**: Inconsistent cross-functional communication, not just "too much work"
|
|
|
|
**Pitfalls**: Stopping too early (symptom not root), blaming people not systems
|
|
|
|
### Fishbone/Ishikawa Diagram (Categorical)
|
|
|
|
**Structure**: Problem at head, "bones" are categories of causes
|
|
|
|
**Categories (6Ms for manufacturing, adapt for software)**:
|
|
- **Methods**: Processes, workflows
|
|
- **Machines**: Tools, systems, infrastructure
|
|
- **Materials**: Code, data, resources
|
|
- **Measurements**: Metrics, monitoring
|
|
- **Mother Nature/Environment**: External factors
|
|
- **Manpower/People**: Skills, capacity, communication
|
|
|
|
**Process**:
|
|
1. Draw fishbone, problem at right
|
|
2. Brainstorm causes in each category
|
|
3. For each cause, ask "why?" to find sub-causes
|
|
4. Identify which causes have most sub-causes or highest impact
|
|
5. Select root causes to address
|
|
|
|
**When**: Complex problem with multiple contributing factors, want structured brainstorming
|
|
|
|
### Timeline Analysis (Chronological Reconstruction)
|
|
|
|
**Process**:
|
|
1. Draw timeline of period (days, weeks, sprints)
|
|
2. Plot events chronologically:
|
|
- Decisions made
|
|
- Incidents occurred
|
|
- Metrics changed
|
|
- External events (outages, launches, org changes)
|
|
3. Mark sentiment highs/lows
|
|
4. Look for patterns:
|
|
- What preceded highs? (replicate)
|
|
- What preceded lows? (avoid)
|
|
- Clustering of incidents?
|
|
- Recurring cycles?
|
|
|
|
**When**: Long period (quarter), complex project, team needs shared understanding of sequence
|
|
|
|
**Insight example**: "Every time we skip retrospective, next sprint has more bugs" (correlation)
|
|
|
|
### Systemic Root Cause (Layers of Systems)
|
|
|
|
**Go beyond immediate cause to systemic**:
|
|
- **Immediate**: "Typo caused outage"
|
|
- **Proximate**: "No code review caught it"
|
|
- **Systemic**: "Code review process not enforced on urgent fixes"
|
|
- **Cultural**: "Urgency culture prioritizes speed over safety"
|
|
|
|
**Questions to surface systemic issues**:
|
|
- "What allowed this to happen?"
|
|
- "What would prevent this in the future?"
|
|
- "Is this an isolated incident or pattern?"
|
|
- "What incentives/pressures contributed?"
|
|
|
|
## 4. Psychological Safety Building
|
|
|
|
### Pre-Retro Norms Setting
|
|
|
|
**Establish explicitly** (don't assume):
|
|
- Prime Directive: Everyone did best with what they had
|
|
- Focus on systems/processes, not people
|
|
- Listen to understand, not to judge
|
|
- Disagree respectfully
|
|
- What's said here stays here (Chatham House Rule)
|
|
- Assume positive intent
|
|
|
|
**Post visibly**: On screen share, whiteboard, meeting notes
|
|
|
|
**Reference during**: "Remember, we're focusing on the process, not individuals"
|
|
|
|
### Blameless Language
|
|
|
|
**Shift from**:
|
|
- "You broke production" → "Production broke when X was deployed"
|
|
- "Why didn't you test this?" → "What prevented testing from catching this?"
|
|
- "That was a stupid decision" → "What information led to that decision?"
|
|
|
|
**Focus on learning, not fault**: "What can we learn?" not "Who's responsible?"
|
|
|
|
### Retro Facilitator Rotation
|
|
|
|
**Why**: Prevents one person's biases from dominating, distributes facilitation skill
|
|
|
|
**How**: Rotate each retro, pair new facilitators with experienced
|
|
|
|
**Training**: Share facilitation guide, observe retros, debrief after facilitation
|
|
|
|
### Confidentiality vs Transparency
|
|
|
|
**Rule of thumb**: What's said in retro stays in retro UNLESS:
|
|
- It's an action item that needs external visibility
|
|
- Team explicitly decides to share broadly
|
|
- It's a safety/legal/ethical issue requiring escalation
|
|
|
|
**Document actions, not discussions**: Share what we'll do, not who said what
|
|
|
|
### Building Trust Over Time
|
|
|
|
**Early retros** (first 3-5): Focus on safe topics (tools, process), celebrate wins, build habit
|
|
|
|
**Mid-term** (after ~10): Team comfortable, can address harder topics (communication, decision-making)
|
|
|
|
**Mature retros**: Can discuss interpersonal issues, performance, strategic direction
|
|
|
|
**Regression**: If trust breaks (leadership change, reorganization), return to basics
|
|
|
|
## 5. Action Tracking and Metrics
|
|
|
|
### Action Completion Tracking
|
|
|
|
**Metrics**:
|
|
- **Completion rate**: % actions completed before next retro (target: >80%)
|
|
- **Cycle time**: Days from action creation to completion (target: <14 days for sprint teams)
|
|
- **Carry-over rate**: % actions moved to next retro (target: <20%)
|
|
|
|
**Dashboard** (simple spreadsheet or tool):
|
|
|
|
| Action | Owner | Due | Status | Completed | Notes |
|
|
|--------|-------|-----|--------|-----------|-------|
|
|
| Create standup template | Sarah | Nov 18 | ✓ Done | Nov 17 | |
|
|
| Fix CI pipeline timeout | James | Nov 25 | ⚠ In Progress | - | Blocked on infra |
|
|
|
|
**Review at start of every retro**: Celebrate completions, discuss blockers, decide on carry-overs
|
|
|
|
### Leading Indicators (Retro Health)
|
|
|
|
**Participation rate**: % team attending (target: 100% or explained absence)
|
|
|
|
**Engagement**: % participants contributing ideas (target: >80%)
|
|
|
|
**ROTI scores**: % thumbs up on retro value (target: >80%)
|
|
|
|
**Sentiment trend**: Are Mad/Sad decreasing, Glad increasing over time?
|
|
|
|
**Repeat issues**: Same problem >3 retros → escalate to leadership (systemic issue beyond team control)
|
|
|
|
### Lagging Indicators (Business Impact)
|
|
|
|
**Team performance**:
|
|
- Velocity trend (increasing/stable/decreasing)
|
|
- Bug rate trend (decreasing ideal)
|
|
- On-time delivery % (increasing ideal)
|
|
|
|
**Team health**:
|
|
- Turnover rate (decreasing ideal)
|
|
- Engagement scores (increasing ideal)
|
|
- Sick leave patterns (stable or decreasing ideal)
|
|
|
|
**Correlation**: Do teams with regular retros + high action completion have better metrics?
|
|
|
|
### Action Type Distribution
|
|
|
|
**Track action categories** over time:
|
|
- **Process**: 40-50% (change how we work)
|
|
- **Technical**: 20-30% (tools, infrastructure, code quality)
|
|
- **Communication**: 15-25% (meetings, documentation, alignment)
|
|
- **Team dynamics**: 5-15% (collaboration, morale, conflict)
|
|
|
|
**Red flags**:
|
|
- >60% process actions → too much overhead, simplify
|
|
- 0% technical actions → accumulating technical debt
|
|
- >30% communication actions → organizational dysfunction
|
|
|
|
## 6. Remote and Async Retrospectives
|
|
|
|
### Synchronous Remote Retros
|
|
|
|
**Tools**: Miro, Mural, Jamboard, FigJam, Retrium
|
|
|
|
**Best practices**:
|
|
- **Cameras on**: Increases engagement, reads body language
|
|
- **Silent brainstorming**: Everyone types simultaneously (prevents groupthink, balances introverts/extroverts)
|
|
- **Timers visible**: Keep time-boxing discipline
|
|
- **Breakout rooms**: For large teams, split for intimate discussion, reconvene for synthesis
|
|
- **Emoji reactions**: Quick, non-verbal feedback during shares
|
|
|
|
**Challenges**:
|
|
- Harder to read room energy → Check in explicitly: "Sensing some tension, am I reading that right?"
|
|
- Tech issues → Have backup plan (phone-in, async fallback)
|
|
- Timezone spread → Rotate times to share burden, or go async
|
|
|
|
### Async Retrospectives
|
|
|
|
**When**: Extreme timezone spread (>8 hours), team prefers written reflection
|
|
|
|
**Process** (5-day cycle):
|
|
1. **Monday**: Facilitator posts retro format, instructions, deadline (Friday)
|
|
2. **Mon-Thu**: Team adds items asynchronously
|
|
3. **Thursday**: Facilitator clusters items, posts summary, asks for votes
|
|
4. **Friday**: Team votes on priorities, facilitator summarizes top themes
|
|
5. **Friday PM**: Facilitator proposes actions based on votes/themes
|
|
6. **Monday (next week)**: Finalize actions, assign owners
|
|
|
|
**Pros**: Time to reflect deeply, written record, inclusive of all timezones
|
|
**Cons**: Less energy, harder to build on ideas, slower resolution
|
|
|
|
**Hybrid approach**: Async data gathering, sync discussion and action planning (60 min)
|
|
|
|
### Tooling Recommendations
|
|
|
|
**Simple** (small teams, <10 people):
|
|
- Google Docs/Slides: Shared doc, everyone edits simultaneously
|
|
- Jamboard: Simple, sticky-note style
|
|
|
|
**Advanced** (large teams, dedicated retros):
|
|
- **Retrium**: Purpose-built for retros, many formats, voting, action tracking
|
|
- **Miro/Mural**: Infinite canvas, rich templates, integrations
|
|
- **Parabol**: Open-source, async support, Jira integration
|
|
|
|
**Action tracking**:
|
|
- Lightweight: Spreadsheet in shared drive
|
|
- Integrated: Jira, Linear, Asana (link retro actions to work tracking)
|
|
- Dedicated: Retrium, Parabol (built-in action tracking and reminders)
|
|
|
|
---
|
|
|
|
## Workflow Integration
|
|
|
|
**When to use advanced techniques**:
|
|
|
|
**Advanced formats** → When standard formats feel stale, team wants variety
|
|
**Root cause analysis** → When recurring issues appear >3 times, need depth
|
|
**Facilitation techniques** → When participation imbalanced, conflicts emerge
|
|
**Psychological safety building** → New teams, post-conflict, low trust
|
|
**Metrics tracking** → Mature retro practice, want to measure improvement
|
|
**Remote/async** → Distributed teams, timezone challenges
|
|
|
|
**Progression**:
|
|
1. **Start simple**: Start/Stop/Continue, 30-min retros, basic facilitation
|
|
2. **Build habit**: Consistent schedule, track action completion, >80% attendance
|
|
3. **Deepen practice**: Experiment with formats, root cause techniques, track metrics
|
|
4. **Embed in culture**: Retros feel safe, honest, valuable; team requests retros proactively
|