Project Mapping Patterns
Overview
Project maps help see the big picture while breaking down the path forward. They make invisible work visible and show how pieces connect.
When to Use
- User is starting a new project and doesn't know where to begin
- User feels overwhelmed by project scope
- User needs to see dependencies between tasks
- User asks "what do I need to do for this project?"
- User mentions feeling lost in the middle of a project
Pattern: Project Phases Map
Use for projects with distinct phases or stages.
flowchart LR
subgraph Phase1[" 🎯 Define Phase (Week 1)"]
P1A[Clarify goal<br/>1 hour]
P1B[List must-haves<br/>30 min]
P1C[Identify constraints<br/>30 min]
end
subgraph Phase2[" 🔍 Research Phase (Week 2)"]
P2A[Gather examples<br/>2 hours]
P2B[List options<br/>1 hour]
P2C[Pick approach<br/>1 hour]
end
subgraph Phase3[" 🛠️ Build Phase (Weeks 3-4)"]
P3A[Create outline/structure<br/>2 hours]
P3B[Fill in content<br/>6 hours]
P3C[Initial review<br/>1 hour]
end
subgraph Phase4[" ✨ Finish Phase (Week 5)"]
P4A[Revise based on feedback<br/>2 hours]
P4B[Final polish<br/>1 hour]
P4C[Ship it<br/>30 min]
end
Phase1 --> Phase2
Phase2 --> Phase3
Phase3 --> Phase4
Note1[You are here 👉] -.-> Phase1
style Phase1 fill:#e1f5ff
style Phase2 fill:#fff3cd
style Phase3 fill:#ffeef0
style Phase4 fill:#d4f1d4
Key features:
- Chunks project into manageable phases
- Shows rough time estimates for planning
- Indicates current location ("You are here")
- Each phase has 3-5 tasks maximum
- Emoji help distinguish phases visually
Pattern: Dependency Map
Use when tasks depend on each other or have blocking relationships.
flowchart TD
Start[Plan Home Office Setup] --> Research[Research desk options<br/>⚡⚡ 2 hours]
Start --> Measure[Measure space<br/>⚡ 15 min]
Measure --> Layout[Sketch layout options<br/>⚡ 30 min]
Research --> Layout
Layout --> Budget[Set budget<br/>⚡ 30 min]
Budget --> Shop[Order desk & chair<br/>⚡⚡ 1 hour]
Shop --> Wait1[⏳ Wait for delivery<br/>5-7 days]
Wait1 --> Clear[Clear space<br/>⚡⚡ 1 hour]
Clear --> Assemble[Assemble furniture<br/>⚡⚡⚡ 2-3 hours]
Assemble --> Arrange[Arrange items<br/>⚡⚡ 1 hour]
Layout --> Tech[Check cable needs<br/>⚡ 20 min]
Tech --> OrderCables[Order cables if needed<br/>⚡ 15 min]
OrderCables --> Wait2[⏳ Wait for delivery<br/>2-3 days]
Wait2 --> Arrange
Arrange --> Done[Enjoy new setup!<br/>Take a photo]
style Start fill:#e1f5ff
style Done fill:#d4f1d4
style Wait1 fill:#fff3cd
style Wait2 fill:#fff3cd
Key features:
- Shows what can happen in parallel vs. sequentially
- Highlights waiting/blocking periods (⏳)
- Energy indicators for each task (⚡)
- Identifies the critical path
- Celebrates completion
Pattern: Overwhelm-to-Action Breakdown
Use when user says "I don't even know where to start" or project feels too big.
flowchart TD
Overwhelm[😰 Overwhelming Project:<br/>Plan cross-country move] --> Tiny[What's the tiniest<br/>first step?]
Tiny --> List[Make a brain dump list<br/>15 min<br/>Everything that comes to mind]
List --> Group{Can you group<br/>these into<br/>categories?}
Group -->|Yes| Categories[Group into themes<br/>10 min<br/>Housing, Logistics, Stuff, People]
Group -->|Feels hard| Skip[Skip categorizing<br/>Just pick easiest item]
Categories --> Pick1[Pick ONE category<br/>to focus on today]
Skip --> Pick2[Pick ONE item<br/>to do today]
Pick1 --> Micro[Break that ONE thing<br/>into micro-steps]
Pick2 --> Micro
Micro --> Do[Do first micro-step<br/>10-15 min<br/>That's enough for today]
Do --> Celebrate[🎉 Celebrate!<br/>You started.<br/>That's the hardest part.]
style Overwhelm fill:#f8d7da
style Celebrate fill:#d4f1d4
style Do fill:#e1f5ff
Key features:
- Starts from emotional state (overwhelm)
- Reduces to tiniest possible action
- One thing at a time
- Celebrates starting (not finishing)
- No pressure to do more
Pattern: Parallel Workstreams
Use for projects with multiple independent tracks that can happen simultaneously.
flowchart TD
Start[App Development Project] --> Split{Can be split into<br/>parallel tracks}
Split --> Design[🎨 Design Track]
Split --> Backend[⚙️ Backend Track]
Split --> Content[📝 Content Track]
subgraph DesignWork[" "]
D1[Wireframes<br/>⚡⚡⚡ 4 hours]
D2[Visual design<br/>⚡⚡⚡ 6 hours]
D3[Prototype<br/>⚡⚡⚡ 3 hours]
D1 --> D2 --> D3
end
subgraph BackendWork[" "]
B1[Set up database<br/>⚡⚡ 2 hours]
B2[Build API<br/>⚡⚡⚡ 8 hours]
B3[Testing<br/>⚡⚡ 3 hours]
B1 --> B2 --> B3
end
subgraph ContentWork[" "]
C1[Write copy<br/>⚡⚡ 3 hours]
C2[Create examples<br/>⚡⚡ 2 hours]
C3[Review & edit<br/>⚡ 1 hour]
C1 --> C2 --> C3
end
Design --> DesignWork
Backend --> BackendWork
Content --> ContentWork
D3 --> Merge[🔗 Integration Phase]
B3 --> Merge
C3 --> Merge
Merge --> Final[Final polish & launch<br/>⚡⚡⚡ 4 hours]
style Start fill:#e1f5ff
style Final fill:#d4f1d4
Key features:
- Shows work can happen in parallel
- Helps delegate or time-shift work
- Makes it clear when tracks must merge
- Can help identify bottlenecks
Pattern: Minimum Viable Progress (MVP)
Use when perfectionism is blocking progress or user needs permission to ship something "incomplete."
flowchart LR
Start[Portfolio Website Project] --> MVP{What's the<br/>bare minimum?}
MVP --> V1[" 🎯 Version 1: Bare Minimum<br/>(Shippable in 1 day)"]
MVP --> V2[" ✨ Version 2: Better<br/>(If you have energy)"]
MVP --> V3[" 🌟 Version 3: Ideal<br/>(Nice to have)"]
V1 --> V1Tasks[• One-page HTML<br/>• Name & contact<br/>• 3 project links<br/>• Basic styling]
V2 --> V2Tasks[• About section<br/>• Project descriptions<br/>• Responsive design<br/>• Custom domain]
V3 --> V3Tasks[• Animations<br/>• Case studies<br/>• Blog section<br/>• Dark mode]
V1Tasks --> Ship1[Ship V1<br/>Then stop or continue]
V2Tasks --> Ship2[Ship V2<br/>Then stop or continue]
V3Tasks --> Ship3[Ship V3<br/>You're done!]
Ship1 -.Optional.-> Ship2 -.Optional.-> Ship3
style V1 fill:#d4f1d4
style V2 fill:#fff3cd
style V3 fill:#e1f5ff
style Ship1 fill:#d4f1d4
Key features:
- Separates "must have" from "nice to have"
- Permission to ship V1 and stop
- Shows optional progression
- Reduces perfectionism paralysis
- Clear definition of "done"
Language Guidelines
Use empowering, realistic language:
✅ DO:
- "You can tackle this one phase at a time"
- "This can happen in parallel"
- "You're here → next is there"
- "Version 1 can be simple"
- "Take breaks between phases"
- "You can adjust the plan as you go"
❌ DON'T:
- "This is the only way"
- "You must complete everything"
- "It's a linear path"
- "You should finish faster"
- "Real professionals would..."
Time Estimate Tips
When adding time estimates:
- Give ranges, not exact numbers ("2-3 hours" not "2 hours")
- Include setup/cleanup time
- Note when things require focus vs. can be split
- Indicate energy cost with ⚡ symbols
- Acknowledge waiting time separately (⏳)