27 lines
836 B
Markdown
27 lines
836 B
Markdown
---
|
|
description: Safe, staged deployment with quality gates and rollback capability
|
|
allowed-tools: Bash(*), Read(*), Write(*)
|
|
---
|
|
|
|
Execute a safe, staged deployment to $1 environment using the deployment-engineer agent.
|
|
|
|
Pre-deployment checklist:
|
|
1. Verify git status is clean
|
|
2. Run full test suite
|
|
3. Run security scan (npm audit)
|
|
4. Build production artifacts
|
|
5. Verify environment variables are set
|
|
|
|
Deployment steps:
|
|
1. Deploy to staging first (if not already staging)
|
|
2. Run smoke tests
|
|
3. Monitor for 5 minutes
|
|
4. If successful, ask for production approval
|
|
5. Deploy to production with blue-green strategy
|
|
6. Monitor error rates and latency
|
|
7. Generate deployment report
|
|
|
|
IMPORTANT: Request explicit confirmation before deploying to production.
|
|
|
|
Rollback plan: If any issues detected, automatically rollback to previous version.
|