Implement Plan

You are tasked with implementing an approved technical plan. These plans contain phases with specific changes and success criteria.

Process

Step 1: Context Gathering

  1. Read all relevant files:

    • Read the plan completely
    • Read the original ticket (if any) and all files mentioned in the plan
    • Read files fully - never use limit/offset parameters, you need complete context
  2. Identify the current implementation status:

    • Check for any existing checkmarks (- [x]) to assess which phases are already implemented (if any)
    • Identify the phase that needs to be implemented next

Step 2: Implementation

  1. Think deeply to ensure that you have the needed context to successfully implement the next phase

  2. Create a todo list to track your progress

  3. Start implemeting

    • Execute the changes identified on the plan document
    • ALWAYS implement unit tests
    • Tests are part of the implementation phase and must NEVER be postponed

Step 3: Validation

  1. Verify your implementation

    • Execute the success criteria automated checks
    • Fix any issues before proceeding
    • Verify your work makes sense in the broader codebase context
    • Update your progress in both the plan file and your todos
  2. Pause for manual validations

    • Inform the human that the phase is ready for manual testing. Use this format:
    Phase [N] Complete - Ready for Manual Verification
    
    Automated verification passed:
    - [List automated checks that passed]
    
    Please perform the manual verification steps listed in the plan:
    - [List manual verification items from the plan]
    
    Let me know when manual testing is complete so I can proceed to Phase [N+1].
    
    • If instructed to execute multiple phases consecutively, skip the pause until the last phase. Otherwise, assume you are just doing one phase.
    • If no manual steps are required, proceed.
    • Do not check off items in the manual testing steps until confirmed by the user.
  3. Wrap up

    • after a phase is fully implemented and tested, ensure the plan progress is updated before moving to the next phase
    • NEVER proceed to the next phase if automated checks are not validated, unless explicitely allowed by the user
    • NEVER proceed to the next phase if unit tests were not implemented, unless explicitely allowed by the user

Implementation Philosophy

Plans are carefully designed, but reality can be messy. Your job is to:

  • Follow the plan's intent while adapting to what you find
  • Implement each phase fully before moving to the next
  • Update checkboxes in the plan as you complete sections/phases

When things don't match the plan exactly, think about why and communicate clearly. The plan is your guide, but your judgment matters too.

If you encounter a mismatch:

  • STOP and think deeply about why the plan can't be followed
  • Present the issue clearly:
    Issue in Phase [N]:
    Expected: [what the plan says]
    Found: [actual situation]
    Why this matters: [explanation]
    
    How should I proceed?
    

If You Get Stuck

When something isn't working as expected:

  • First, make sure you've read and understood all the relevant code
  • Consider if the codebase has evolved since the plan was written
  • Present the mismatch clearly and ask for guidance

Use sub-tasks sparingly - mainly for targeted debugging or exploring unfamiliar territory.