description: Analyze project milestone health with actionable insights, target date assessment, risk analysis, and specific recommendations
|
|
category: pm
|
|
tools: Task, Read, Write, TodoWrite
|
|
model: inherit
|
|
version: 1.0.0
|
|
---
|
|
|
|
# Analyze Milestone Command
|
|
|
|
Generates a comprehensive **health report** for a project milestone.
|
|
|
|
**Reports Include**:
|
|
- 🟢🟡🔴 Health assessment with target date feasibility
|
|
- 📊 Progress metrics toward target date
|
|
- 🎯 Actionable takeaways (what needs attention NOW)
|
|
- ⚠️ Risk identification (behind schedule, blocked, at-risk)
|
|
- 💡 Specific recommendations (adjust timeline, reduce scope, etc.)
|
|
|
|
**Philosophy**: Provide insights and recommendations for milestone planning, not just data dumps.
|
|
|
|
## Prerequisites Check
|
|
|
|
```bash
|
|
# 1. Validate thoughts system (REQUIRED)
|
|
if [[ -f "scripts/validate-thoughts-setup.sh" ]]; then
|
|
./scripts/validate-thoughts-setup.sh || exit 1
|
|
else
|
|
# Inline validation if script not found
|
|
if [[ ! -d "thoughts/shared" ]]; then
|
|
echo "❌ ERROR: Thoughts system not configured"
|
|
echo "Run: ./scripts/humanlayer/init-project.sh . {project-name}"
|
|
exit 1
|
|
fi
|
|
fi
|
|
|
|
# 2. Determine script directory with fallback
|
|
if [[ -n "${CLAUDE_PLUGIN_ROOT}" ]]; then
|
|
SCRIPT_DIR="${CLAUDE_PLUGIN_ROOT}/scripts"
|
|
else
|
|
# Fallback: resolve relative to this command file
|
|
SCRIPT_DIR="$(cd "$(dirname "${BASH_SOURCE[0]}")/.." && pwd)/scripts"
|
|
fi
|
|
|
|
# 3. Check PM plugin prerequisites
|
|
if [[ -f "${SCRIPT_DIR}/check-prerequisites.sh" ]]; then
|
|
"${SCRIPT_DIR}/check-prerequisites.sh" || exit 1
|
|
else
|
|
echo "⚠️ Prerequisites check skipped (script not found at: ${SCRIPT_DIR})"
|
|
fi
|
|
```
|
|
|
|
## Process
|
|
|
|
### Step 1: Gather Configuration and Milestone Identifier
|
|
|
|
**Option A: User provides milestone name**
|
|
```bash
|
|
MILESTONE_NAME="Q1 Launch"
|
|
PROJECT_NAME="Mobile App"
|
|
```
|
|
|
|
**Option B: Interactive prompt**
|
|
```
|
|
Which milestone would you like to analyze?
|
|
- Milestone name: [user input]
|
|
- Project name (optional, helps scope lookup): [user input]
|
|
```
|
|
|
|
### Step 2: Spawn Research Agent
|
|
|
|
Use Task tool with `catalyst-dev:linear-research` agent:
|
|
|
|
```
|
|
Prompt: "Get milestone '${MILESTONE_NAME}' details for project '${PROJECT_NAME}' with all issues (limit 100)"
|
|
Model: haiku (fast data gathering)
|
|
```
|
|
|
|
If milestone not found or ambiguous, report error and ask user to clarify.
|
|
|
|
### Step 3: Spawn Analysis Agent
|
|
|
|
Use Task tool with `milestone-analyzer` agent:
|
|
|
|
**Input**:
|
|
- Milestone data JSON from research task
|
|
- Current date: $(date +%Y-%m-%d)
|
|
- Project configuration (if available)
|
|
|
|
**Agent returns**:
|
|
Structured markdown with:
|
|
- Health score and target date feasibility
|
|
- Progress tracking (actual vs expected)
|
|
- Risk factors (target date, blockers, at-risk)
|
|
- Issue distribution
|
|
- Specific recommendations
|
|
|
|
### Step 4: Format Report
|
|
|
|
Format the analyzer output into final report:
|
|
|
|
```markdown
|
|
# Milestone Health Report: [Milestone Name]
|
|
|
|
**Project**: [Project Name]
|
|
**Target Date**: [YYYY-MM-DD] ([X] days remaining)
|
|
**Generated**: [YYYY-MM-DD HH:MM]
|
|
|
|
---
|
|
|
|
## 🟢/🟡/🔴 Health Assessment
|
|
|
|
**Takeaway**: [One-sentence summary with target date assessment]
|
|
|
|
**Current State**:
|
|
- Progress: X% complete (Y/Z issues done)
|
|
- Target: [YYYY-MM-DD] ([N] days remaining)
|
|
- Projected completion: [YYYY-MM-DD] (based on current velocity)
|
|
- Risk level: [On track / Behind by N days / Critical]
|
|
|
|
---
|
|
|
|
## 📊 Progress Tracking
|
|
|
|
[Progress bars, velocity, time remaining]
|
|
|
|
---
|
|
|
|
## ⚠️ Risks & Blockers
|
|
|
|
[Target date risks, blockers, at-risk issues]
|
|
|
|
---
|
|
|
|
## 💡 Recommendations
|
|
|
|
[Priority-ordered actions]
|
|
|
|
---
|
|
|
|
**Next Review**: [Suggested date based on target date proximity]
|
|
```
|
|
|
|
### Step 5: Save Report
|
|
|
|
```bash
|
|
REPORT_DIR="thoughts/shared/reports/milestones"
|
|
mkdir -p "$REPORT_DIR"
|
|
|
|
# Sanitize milestone name for filename
|
|
MILESTONE_SLUG=$(echo "$MILESTONE_NAME" | tr '[:upper:]' '[:lower:]' | tr ' ' '-')
|
|
REPORT_FILE="$REPORT_DIR/$(date +%Y-%m-%d)-${MILESTONE_SLUG}.md"
|
|
|
|
# Write formatted report
|
|
# ...
|
|
|
|
echo "✅ Report saved: $REPORT_FILE"
|
|
|
|
# Update workflow context
|
|
if [[ -f "${SCRIPT_DIR}/workflow-context.sh" ]]; then
|
|
"${SCRIPT_DIR}/workflow-context.sh" add reports "$REPORT_FILE" "${TICKET_ID:-null}"
|
|
fi
|
|
```
|
|
|
|
### Step 6: Display Summary
|
|
|
|
```
|
|
🎯 Milestone Health: [Milestone Name] - [🟢/🟡/🔴]
|
|
|
|
Target Date: [YYYY-MM-DD] ([X] days remaining)
|
|
Progress: ████████░░ [X]% ([Y]/[Z] issues)
|
|
Status: [On track / Behind by N days]
|
|
|
|
Priority Actions:
|
|
1. [Action 1]
|
|
2. [Action 2]
|
|
3. [Action 3]
|
|
|
|
Full report: thoughts/shared/reports/milestones/YYYY-MM-DD-milestone.md
|
|
```
|
|
|
|
## Success Criteria
|
|
|
|
### Automated Verification:
|
|
- [ ] Research agent fetches milestone data successfully
|
|
- [ ] Analyzer agent produces structured output
|
|
- [ ] Report file created in expected location
|
|
- [ ] No errors when milestone exists
|
|
|
|
### Manual Verification:
|
|
- [ ] Health score accurately reflects milestone state
|
|
- [ ] Target date feasibility is realistic
|
|
- [ ] Recommendations are specific and actionable
|
|
- [ ] Report guides PM to adjust timeline or scope if needed
|
|
- [ ] Works with different projects and milestone names
|