# Business Analysis Skill
|
||
|
||
Comprehensive guide for business analysis practices, requirements gathering, process modeling, and analysis techniques.
|
||
|
||
**Version**: 1.0.0
|
||
**Last Updated**: 2025-10-30
|
||
**Target Audience**: Business Analysts, Requirements Engineers, Process Analysts
|
||
|
||
---
|
||
|
||
## Table of Contents
|
||
|
||
1. [Requirements Gathering](#1-requirements-gathering)
|
||
2. [Process Modeling](#2-process-modeling)
|
||
3. [Requirements Documentation](#3-requirements-documentation)
|
||
4. [Analysis Techniques](#4-analysis-techniques)
|
||
5. [Tools & Deliverables](#5-tools--deliverables)
|
||
|
||
---
|
||
|
||
## 1. Requirements Gathering
|
||
|
||
Requirements gathering is the foundation of successful business analysis. This section covers techniques for eliciting, discovering, and understanding stakeholder needs.
|
||
|
||
### 1.1 Stakeholder Identification and Analysis
|
||
|
||
#### Identifying Stakeholders
|
||
|
||
**Definition**: Stakeholders are individuals or groups who can affect or be affected by the project.
|
||
|
||
**Stakeholder Categories**:
|
||
|
||
1. **Primary Stakeholders** (directly affected):
|
||
- End users
|
||
- Customers
|
||
- Project sponsors
|
||
- Product owners
|
||
|
||
2. **Secondary Stakeholders** (indirectly affected):
|
||
- Support teams
|
||
- Training staff
|
||
- Compliance officers
|
||
- Vendors/suppliers
|
||
|
||
3. **Key Influencers**:
|
||
- Executive leadership
|
||
- Department heads
|
||
- Subject matter experts (SMEs)
|
||
- Change agents
|
||
|
||
**Stakeholder Identification Techniques**:
|
||
|
||
```markdown
|
||
## Brainstorming Session
|
||
- Gather project team
|
||
- List all potential stakeholders
|
||
- Group by category and influence level
|
||
- Validate with project sponsor
|
||
|
||
## Organizational Chart Analysis
|
||
- Review org structure
|
||
- Identify impacted departments
|
||
- Map reporting relationships
|
||
- Identify decision makers
|
||
|
||
## Previous Project Analysis
|
||
- Review similar past projects
|
||
- Identify who was involved
|
||
- Learn from previous stakeholder engagement
|
||
```
|
||
|
||
#### Stakeholder Analysis Matrix
|
||
|
||
Create a Power/Interest Grid to prioritize stakeholder engagement:
|
||
|
||
```markdown
|
||
| Stakeholder | Power | Interest | Strategy |
|
||
|-------------|-------|----------|----------|
|
||
| CEO | High | Low | Keep Satisfied |
|
||
| End Users | Low | High | Keep Informed |
|
||
| Project Sponsor | High | High | Manage Closely |
|
||
| IT Support | Medium | Medium | Keep Informed |
|
||
```
|
||
|
||
**Power/Interest Grid Quadrants**:
|
||
|
||
1. **High Power, High Interest** (Manage Closely):
|
||
- Key players, engage frequently
|
||
- Involve in decision-making
|
||
- Regular status updates
|
||
- Address concerns promptly
|
||
|
||
2. **High Power, Low Interest** (Keep Satisfied):
|
||
- Keep informed at high level
|
||
- Don't overwhelm with details
|
||
- Seek approval at key milestones
|
||
- Monitor for changing interest
|
||
|
||
3. **Low Power, High Interest** (Keep Informed):
|
||
- Regular communication
|
||
- Gather detailed feedback
|
||
- Champions for change
|
||
- Can provide valuable insights
|
||
|
||
4. **Low Power, Low Interest** (Monitor):
|
||
- Minimal effort
|
||
- General updates sufficient
|
||
- Monitor for changes
|
||
- May become more engaged later
|
||
|
||
#### Stakeholder Analysis Template
|
||
|
||
```markdown
|
||
## Stakeholder Profile: [Name/Group]
|
||
|
||
**Role**: [Job title or group description]
|
||
**Department**: [Organizational unit]
|
||
**Level**: [Executive/Management/Staff]
|
||
|
||
**Power/Influence**: [High/Medium/Low]
|
||
**Interest Level**: [High/Medium/Low]
|
||
**Engagement Strategy**: [Manage Closely/Keep Satisfied/Keep Informed/Monitor]
|
||
|
||
**Needs and Expectations**:
|
||
- [What they need from the project]
|
||
- [What they expect as outcomes]
|
||
- [Success criteria from their perspective]
|
||
|
||
**Potential Concerns**:
|
||
- [What might worry them]
|
||
- [Resistance points]
|
||
- [Risk areas]
|
||
|
||
**Communication Preferences**:
|
||
- **Frequency**: [Daily/Weekly/Monthly]
|
||
- **Method**: [Email/Meetings/Reports/Dashboard]
|
||
- **Detail Level**: [High-level summary/Detailed analysis]
|
||
|
||
**Key Questions for This Stakeholder**:
|
||
1. [Question about their needs]
|
||
2. [Question about their constraints]
|
||
3. [Question about success criteria]
|
||
```
|
||
|
||
### 1.2 Interview Techniques and Questions
|
||
|
||
#### Interview Preparation
|
||
|
||
**Before the Interview**:
|
||
|
||
1. **Research the stakeholder**:
|
||
- Review their role and responsibilities
|
||
- Understand their department's goals
|
||
- Identify previous interactions with similar projects
|
||
|
||
2. **Prepare questions**:
|
||
- Create structured interview guide
|
||
- Mix open and closed questions
|
||
- Prepare follow-up probes
|
||
|
||
3. **Set expectations**:
|
||
- Send agenda in advance
|
||
- Clarify purpose and duration
|
||
- Request any pre-reading materials
|
||
|
||
4. **Logistics**:
|
||
- Book appropriate time (usually 60-90 minutes)
|
||
- Choose comfortable, private location
|
||
- Test recording equipment (with permission)
|
||
- Prepare note-taking tools
|
||
|
||
#### Interview Question Framework
|
||
|
||
**Opening Questions** (Build rapport):
|
||
- "Can you describe your current role and key responsibilities?"
|
||
- "How long have you been with the organization?"
|
||
- "What does a typical day look like for you?"
|
||
|
||
**Current State Questions**:
|
||
- "Can you walk me through your current process for [activity]?"
|
||
- "What tools or systems do you currently use?"
|
||
- "How do you measure success in your current workflow?"
|
||
- "What works well in the current process?"
|
||
|
||
**Pain Points and Challenges**:
|
||
- "What are the biggest challenges you face daily?"
|
||
- "What frustrates you most about the current system/process?"
|
||
- "Where do you spend the most time in your work?"
|
||
- "What causes delays or rework?"
|
||
- "If you could change one thing, what would it be?"
|
||
|
||
**Future State and Requirements**:
|
||
- "What would the ideal solution look like?"
|
||
- "How would success be measured in a new system?"
|
||
- "What capabilities are absolutely essential?"
|
||
- "What would make your job significantly easier?"
|
||
- "How do you envision using this new system/process?"
|
||
|
||
**Constraint Questions**:
|
||
- "Are there regulatory or compliance requirements we must meet?"
|
||
- "What is your timeline for needing this solution?"
|
||
- "Are there budget constraints we should be aware of?"
|
||
- "What technical limitations do we need to consider?"
|
||
|
||
**Priority Questions**:
|
||
- "If we can only deliver three features, which would you choose?"
|
||
- "What capabilities are must-haves vs. nice-to-haves?"
|
||
- "What would you be willing to trade off?"
|
||
|
||
**Closing Questions**:
|
||
- "Who else should I speak with about this?"
|
||
- "Is there anything important I haven't asked about?"
|
||
- "May I follow up if I have additional questions?"
|
||
|
||
#### Interview Techniques
|
||
|
||
**Active Listening**:
|
||
```markdown
|
||
DO:
|
||
- Maintain eye contact
|
||
- Nod and show engagement
|
||
- Take notes but don't let it distract
|
||
- Paraphrase to confirm understanding
|
||
- Ask clarifying questions
|
||
|
||
DON'T:
|
||
- Interrupt or finish sentences
|
||
- Jump to solutions
|
||
- Make assumptions
|
||
- Multi-task or check devices
|
||
- Show bias or judgment
|
||
```
|
||
|
||
**Probing Techniques**:
|
||
|
||
1. **The 5 Whys**:
|
||
```
|
||
"We need faster reporting."
|
||
Why? "Reports take too long to generate."
|
||
Why? "We have to pull data from multiple systems."
|
||
Why? "Systems aren't integrated."
|
||
Why? "We lack an enterprise data warehouse."
|
||
Why? "Previous integration project was never completed."
|
||
```
|
||
|
||
2. **Expanding Questions**:
|
||
- "Can you tell me more about that?"
|
||
- "What do you mean by [term]?"
|
||
- "Can you give me an example?"
|
||
- "What happens next in that scenario?"
|
||
|
||
3. **Clarifying Questions**:
|
||
- "When you say 'fast', what timeframe are you thinking?"
|
||
- "Who specifically is included in 'the team'?"
|
||
- "What would 'improved' look like in measurable terms?"
|
||
|
||
4. **Hypothetical Questions**:
|
||
- "If you had unlimited resources, what would you build?"
|
||
- "What if we could automate this entire process?"
|
||
- "Imagine it's a year from now and this is successful - what changed?"
|
||
|
||
#### Interview Documentation
|
||
|
||
**During Interview**:
|
||
- Note key quotes verbatim
|
||
- Mark action items with [ACTION]
|
||
- Flag inconsistencies with [?]
|
||
- Track follow-up questions with [FOLLOW-UP]
|
||
|
||
**Post-Interview**:
|
||
```markdown
|
||
## Interview Summary: [Stakeholder Name]
|
||
**Date**: [Date]
|
||
**Duration**: [Time]
|
||
**Location**: [Location/Remote]
|
||
**Attendees**: [Names and roles]
|
||
|
||
### Key Takeaways
|
||
- [Main point 1]
|
||
- [Main point 2]
|
||
- [Main point 3]
|
||
|
||
### Current State Observations
|
||
[Summary of how things work now]
|
||
|
||
### Pain Points Identified
|
||
1. [Pain point 1 - with specific examples]
|
||
2. [Pain point 2 - with specific examples]
|
||
3. [Pain point 3 - with specific examples]
|
||
|
||
### Requirements Identified
|
||
| Requirement | Priority | Type |
|
||
|-------------|----------|------|
|
||
| [Requirement description] | Must-Have | Functional |
|
||
| [Requirement description] | Should-Have | Non-Functional |
|
||
|
||
### Action Items
|
||
- [ ] [Follow-up action 1]
|
||
- [ ] [Follow-up action 2]
|
||
|
||
### Follow-up Questions
|
||
- [Question that emerged during interview]
|
||
- [Clarification needed]
|
||
|
||
### Additional Stakeholders to Contact
|
||
- [Name] - [Reason to contact]
|
||
|
||
### Quotes
|
||
> "[Significant quote that captures key insight]"
|
||
> - [Stakeholder name]
|
||
```
|
||
|
||
### 1.3 Workshop Facilitation
|
||
|
||
Workshops bring multiple stakeholders together for collaborative requirements elicitation.
|
||
|
||
#### Workshop Types
|
||
|
||
**1. Requirements Workshop**:
|
||
- **Purpose**: Gather and validate requirements
|
||
- **Duration**: 2-4 hours
|
||
- **Participants**: 6-12 key stakeholders
|
||
- **Outcome**: Prioritized requirements list
|
||
|
||
**2. Process Mapping Workshop**:
|
||
- **Purpose**: Document current or future processes
|
||
- **Duration**: 3-6 hours
|
||
- **Participants**: Process owners and participants
|
||
- **Outcome**: Visual process maps
|
||
|
||
**3. Design Thinking Workshop**:
|
||
- **Purpose**: Ideate solutions collaboratively
|
||
- **Duration**: 1-2 days
|
||
- **Participants**: Cross-functional team
|
||
- **Outcome**: Prototype concepts
|
||
|
||
**4. Prioritization Workshop**:
|
||
- **Purpose**: Rank requirements or features
|
||
- **Duration**: 2-3 hours
|
||
- **Participants**: Decision makers and SMEs
|
||
- **Outcome**: Ranked backlog
|
||
|
||
#### Workshop Planning Checklist
|
||
|
||
**4-6 Weeks Before**:
|
||
- [ ] Define workshop objectives and scope
|
||
- [ ] Identify and invite participants
|
||
- [ ] Book facility and arrange logistics
|
||
- [ ] Identify co-facilitator if needed
|
||
|
||
**2-4 Weeks Before**:
|
||
- [ ] Develop detailed agenda
|
||
- [ ] Prepare workshop materials
|
||
- [ ] Send pre-work to participants
|
||
- [ ] Confirm attendance
|
||
|
||
**1 Week Before**:
|
||
- [ ] Send reminder with logistics
|
||
- [ ] Finalize materials and print
|
||
- [ ] Test technology (projector, video conferencing)
|
||
- [ ] Arrange catering if applicable
|
||
|
||
**Day Before**:
|
||
- [ ] Review agenda and materials
|
||
- [ ] Prepare room setup diagram
|
||
- [ ] Charge devices
|
||
- [ ] Print name tents
|
||
|
||
**Day Of**:
|
||
- [ ] Arrive early to set up room
|
||
- [ ] Test all equipment
|
||
- [ ] Arrange materials
|
||
- [ ] Welcome participants
|
||
|
||
#### Workshop Agenda Template
|
||
|
||
```markdown
|
||
## Requirements Gathering Workshop
|
||
|
||
**Date**: [Date]
|
||
**Time**: [Start] - [End]
|
||
**Location**: [Location]
|
||
**Facilitator**: [Name]
|
||
|
||
### Pre-Work
|
||
Please review the following before the workshop:
|
||
- [Document 1]
|
||
- [Document 2]
|
||
|
||
### Agenda
|
||
|
||
**9:00 - 9:15 | Welcome and Introductions (15 min)**
|
||
- Introductions and icebreaker
|
||
- Workshop objectives
|
||
- Ground rules
|
||
- Agenda overview
|
||
|
||
**9:15 - 9:45 | Context Setting (30 min)**
|
||
- Project overview and goals
|
||
- Current state summary
|
||
- Success criteria
|
||
- Scope boundaries
|
||
|
||
**9:45 - 10:30 | Requirements Brainstorming (45 min)**
|
||
Activity: Silent brainstorming followed by group sharing
|
||
- Functional requirements
|
||
- Non-functional requirements
|
||
- Constraints
|
||
|
||
**10:30 - 10:45 | Break (15 min)**
|
||
|
||
**10:45 - 11:30 | Requirements Refinement (45 min)**
|
||
Activity: Group discussion and clustering
|
||
- Consolidate similar items
|
||
- Clarify ambiguous requirements
|
||
- Add missing details
|
||
|
||
**11:30 - 12:15 | Prioritization (45 min)**
|
||
Activity: MoSCoW prioritization
|
||
- Must Have
|
||
- Should Have
|
||
- Could Have
|
||
- Won't Have (this time)
|
||
|
||
**12:15 - 12:30 | Wrap-up and Next Steps (15 min)**
|
||
- Summary of outcomes
|
||
- Action items
|
||
- Next steps
|
||
- Feedback
|
||
|
||
### Ground Rules
|
||
- One conversation at a time
|
||
- All ideas are valid
|
||
- Stay focused on objectives
|
||
- Be present (minimize devices)
|
||
- Respect time boundaries
|
||
- Challenge ideas, not people
|
||
```
|
||
|
||
#### Facilitation Techniques
|
||
|
||
**Brainstorming Rules**:
|
||
```markdown
|
||
1. Quantity over quality initially
|
||
2. No criticism or evaluation during generation
|
||
3. Wild ideas encouraged
|
||
4. Build on others' ideas
|
||
5. Stay focused on topic
|
||
6. One conversation at a time
|
||
```
|
||
|
||
**Dot Voting for Prioritization**:
|
||
```markdown
|
||
1. List all items on wall/board
|
||
2. Give each participant 5-7 dot stickers
|
||
3. Participants place dots on top priorities
|
||
4. Can use multiple dots on one item (if allowed)
|
||
5. Count dots to see top priorities
|
||
6. Discuss results and make final decisions
|
||
```
|
||
|
||
**MoSCoW Prioritization**:
|
||
```markdown
|
||
**Must Have**: Critical for go-live, project fails without
|
||
**Should Have**: Important but not critical, can be deferred
|
||
**Could Have**: Nice to have, include if time/budget allows
|
||
**Won't Have**: Out of scope for this release
|
||
```
|
||
|
||
**Affinity Mapping**:
|
||
```markdown
|
||
1. Write each idea on separate sticky note
|
||
2. Post all notes on wall
|
||
3. Silently group similar items together
|
||
4. Discuss groupings as a team
|
||
5. Name each group
|
||
6. Identify themes and patterns
|
||
```
|
||
|
||
#### Managing Difficult Situations
|
||
|
||
**Dominant Participant**:
|
||
- "Thank you [Name], let's hear from others"
|
||
- Use round-robin approach
|
||
- Direct questions to quieter participants
|
||
- Use silent brainstorming techniques
|
||
|
||
**Off-Topic Discussion**:
|
||
- "That's important, let's capture it in the parking lot"
|
||
- "How does this relate to our objective?"
|
||
- Redirect to agenda
|
||
- Use parking lot board for tangents
|
||
|
||
**Disagreement or Conflict**:
|
||
- Acknowledge both perspectives
|
||
- Focus on interests, not positions
|
||
- Find common ground
|
||
- Table for offline discussion if needed
|
||
- Use voting to resolve deadlock
|
||
|
||
**Low Energy**:
|
||
- Take an unscheduled break
|
||
- Use energizer activity
|
||
- Change format (stand up, move around)
|
||
- Check if agenda is too ambitious
|
||
|
||
### 1.4 Observation and Job Shadowing
|
||
|
||
Observation provides firsthand insight into how work actually happens (vs. how stakeholders describe it).
|
||
|
||
#### When to Use Observation
|
||
|
||
**Ideal Scenarios**:
|
||
- Complex processes difficult to describe
|
||
- Significant muscle memory or tacit knowledge
|
||
- Suspected gaps between described and actual process
|
||
- Understanding context and environment
|
||
- Identifying workarounds and informal processes
|
||
|
||
**Not Appropriate When**:
|
||
- Highly sensitive or confidential work
|
||
- Process happens infrequently
|
||
- Work is dangerous or restricted
|
||
- Stakeholder is uncomfortable being observed
|
||
|
||
#### Planning an Observation Session
|
||
|
||
**Preparation**:
|
||
```markdown
|
||
1. **Get Permission**:
|
||
- Manager approval
|
||
- Individual consent
|
||
- Explain purpose and process
|
||
|
||
2. **Set Expectations**:
|
||
- Duration of observation
|
||
- Your role (observer, not evaluator)
|
||
- Confidentiality of findings
|
||
- Ability to ask questions
|
||
|
||
3. **Prepare Tools**:
|
||
- Observation checklist
|
||
- Note-taking materials
|
||
- Camera (if permitted)
|
||
- Process documentation template
|
||
|
||
4. **Choose Timing**:
|
||
- Typical workday (avoid unusual circumstances)
|
||
- Complete process cycle if possible
|
||
- Consider busy vs. slow periods
|
||
```
|
||
|
||
#### Observation Framework
|
||
|
||
**What to Observe**:
|
||
|
||
1. **Physical Environment**:
|
||
- Workspace layout
|
||
- Tools and equipment
|
||
- Materials and supplies
|
||
- Ergonomics and comfort
|
||
|
||
2. **Process Steps**:
|
||
- Sequence of activities
|
||
- Decision points
|
||
- Handoffs between people/systems
|
||
- Inputs and outputs
|
||
|
||
3. **Time and Effort**:
|
||
- Duration of each step
|
||
- Wait times and delays
|
||
- Multitasking
|
||
- Rush vs. thorough work
|
||
|
||
4. **Tools and Systems**:
|
||
- Software applications used
|
||
- Manual vs. automated steps
|
||
- System switching
|
||
- Workarounds and shortcuts
|
||
|
||
5. **Interactions**:
|
||
- Communication patterns
|
||
- Collaboration needs
|
||
- Questions asked
|
||
- Information sources
|
||
|
||
6. **Pain Points**:
|
||
- Frustrations expressed
|
||
- Errors or rework
|
||
- Confusion or uncertainty
|
||
- Inefficiencies
|
||
|
||
#### Observation Template
|
||
|
||
```markdown
|
||
## Job Shadowing Session: [Role/Process]
|
||
|
||
**Date**: [Date]
|
||
**Time**: [Start] - [End]
|
||
**Observer**: [Your name]
|
||
**Participant**: [Role or anonymous identifier]
|
||
**Process Observed**: [Process name]
|
||
|
||
### Environment Notes
|
||
[Physical workspace, tools available, noise level, etc.]
|
||
|
||
### Process Flow Observed
|
||
|
||
| Time | Step | Activity Description | Tools Used | Duration | Notes |
|
||
|------|------|---------------------|------------|----------|-------|
|
||
| 9:00 | 1 | Login to system | System X | 2 min | Had to reset password |
|
||
| 9:02 | 2 | Pull overnight orders | System X | 5 min | System slow to respond |
|
||
| 9:07 | 3 | Export to Excel | System X, Excel | 3 min | Manual export needed |
|
||
|
||
### Workarounds Identified
|
||
1. [Workaround description and why it exists]
|
||
2. [Workaround description and why it exists]
|
||
|
||
### Pain Points Observed
|
||
- **[Pain point]**: [Description and impact]
|
||
- **[Pain point]**: [Description and impact]
|
||
|
||
### Automation Opportunities
|
||
- [Step that could be automated]
|
||
- [Repetitive task that could be streamlined]
|
||
|
||
### Questions Raised
|
||
- [Question about why process is done this way]
|
||
- [Question about alternative approaches]
|
||
|
||
### Process Improvement Ideas
|
||
1. [Improvement idea based on observation]
|
||
2. [Improvement idea based on observation]
|
||
|
||
### Follow-up Actions
|
||
- [ ] Validate observations with participant
|
||
- [ ] Interview [Name] about related process
|
||
- [ ] Research system capability for [specific need]
|
||
```
|
||
|
||
#### Think-Aloud Protocol
|
||
|
||
Ask participant to verbalize their thinking:
|
||
|
||
```markdown
|
||
"As you work, please describe what you're thinking and doing:
|
||
- What you're looking at
|
||
- What you're deciding
|
||
- Why you're choosing one option over another
|
||
- What you're concerned about"
|
||
```
|
||
|
||
**Benefits**:
|
||
- Reveals decision-making process
|
||
- Uncovers tacit knowledge
|
||
- Identifies information needs
|
||
- Shows workarounds and informal rules
|
||
|
||
### 1.5 Document Analysis
|
||
|
||
Existing documentation provides valuable context and baseline information.
|
||
|
||
#### Types of Documents to Analyze
|
||
|
||
**Strategic Documents**:
|
||
- Business plans
|
||
- Strategic roadmaps
|
||
- Vision and mission statements
|
||
- Goals and objectives
|
||
|
||
**Operational Documents**:
|
||
- Standard operating procedures (SOPs)
|
||
- Work instructions
|
||
- Training materials
|
||
- Quality checklists
|
||
|
||
**System Documentation**:
|
||
- User manuals
|
||
- System specifications
|
||
- Database schemas
|
||
- Integration diagrams
|
||
|
||
**Historical Records**:
|
||
- Previous project documentation
|
||
- Lessons learned reports
|
||
- Meeting minutes
|
||
- Email threads
|
||
|
||
**Compliance Documents**:
|
||
- Regulatory requirements
|
||
- Audit reports
|
||
- Policy documents
|
||
- Contracts and SLAs
|
||
|
||
**Performance Data**:
|
||
- Reports and dashboards
|
||
- Metrics and KPIs
|
||
- Incident logs
|
||
- Customer feedback
|
||
|
||
#### Document Analysis Framework
|
||
|
||
```markdown
|
||
## Document Analysis: [Document Name]
|
||
|
||
**Document Type**: [Type]
|
||
**Date Created**: [Date]
|
||
**Author**: [Name/Department]
|
||
**Last Updated**: [Date]
|
||
**Purpose**: [Why document was created]
|
||
|
||
### Key Findings
|
||
|
||
**Relevant Requirements**:
|
||
- [Requirement extracted from document]
|
||
- [Requirement extracted from document]
|
||
|
||
**Business Rules Identified**:
|
||
- [Rule 1]
|
||
- [Rule 2]
|
||
|
||
**Processes Described**:
|
||
- [Process 1 - with reference to section]
|
||
- [Process 2 - with reference to section]
|
||
|
||
**Stakeholders Mentioned**:
|
||
- [Stakeholder role and their involvement]
|
||
|
||
**Constraints Identified**:
|
||
- [Constraint from document]
|
||
|
||
**Assumptions Noted**:
|
||
- [Assumption in document]
|
||
|
||
### Gaps and Inconsistencies
|
||
|
||
**Missing Information**:
|
||
- [What's not covered that should be]
|
||
|
||
**Inconsistencies with Other Documents**:
|
||
- [Conflict with Document X about Y]
|
||
|
||
**Outdated Information**:
|
||
- [What needs updating]
|
||
|
||
### Questions for Stakeholders
|
||
1. [Question about unclear point]
|
||
2. [Question about inconsistency]
|
||
3. [Question about gap]
|
||
|
||
### Action Items
|
||
- [ ] Verify [information] with [stakeholder]
|
||
- [ ] Request updated version of [document]
|
||
- [ ] Clarify [conflicting information]
|
||
```
|
||
|
||
#### Analysis Checklist
|
||
|
||
**Quality Assessment**:
|
||
- [ ] Is documentation current and up-to-date?
|
||
- [ ] Is it complete for our needs?
|
||
- [ ] Is it accurate (verified with stakeholders)?
|
||
- [ ] Is terminology consistent?
|
||
- [ ] Are there version control issues?
|
||
|
||
**Content Analysis**:
|
||
- [ ] What requirements are explicitly stated?
|
||
- [ ] What business rules are defined?
|
||
- [ ] What processes are documented?
|
||
- [ ] What constraints are mentioned?
|
||
- [ ] What assumptions are made?
|
||
|
||
**Gap Analysis**:
|
||
- [ ] What information is missing?
|
||
- [ ] What conflicts with other documents?
|
||
- [ ] What has changed since creation?
|
||
- [ ] What needs validation?
|
||
|
||
---
|
||
|
||
## 2. Process Modeling
|
||
|
||
Process modeling creates visual representations of business processes to analyze, communicate, and improve them.
|
||
|
||
### 2.1 BPMN Notation and Diagrams
|
||
|
||
BPMN (Business Process Model and Notation) is the standard for process modeling.
|
||
|
||
#### Core BPMN Elements
|
||
|
||
**1. Events** (things that happen):
|
||
|
||
```markdown
|
||
**Start Events** (where process begins):
|
||
○ - Start Event (generic)
|
||
⊙ - Timer Start Event (scheduled)
|
||
✉ - Message Start Event (triggered by message)
|
||
|
||
**Intermediate Events** (occur during process):
|
||
◎ - Generic Intermediate Event
|
||
⊕ - Timer Intermediate Event (wait for time)
|
||
⊞ - Message Intermediate Event (send/receive message)
|
||
|
||
**End Events** (where process ends):
|
||
⊗ - End Event (process completes)
|
||
⊗ - Terminate End Event (end all paths)
|
||
✉⊗ - Message End Event (send message and end)
|
||
```
|
||
|
||
**2. Activities** (work being done):
|
||
|
||
```markdown
|
||
[Activity Name] - Task (single unit of work)
|
||
[⊞ Activity Name] - Subprocess (collapsed process)
|
||
[⊕ Activity Name] - Loop Activity (repeats)
|
||
```
|
||
|
||
**3. Gateways** (control flow):
|
||
|
||
```markdown
|
||
◇ - Exclusive Gateway (XOR) - one path chosen
|
||
⬦ - Parallel Gateway (AND) - all paths taken
|
||
⬢ - Inclusive Gateway (OR) - one or more paths
|
||
○◇ - Event-Based Gateway - wait for event
|
||
```
|
||
|
||
**4. Connecting Objects**:
|
||
|
||
```markdown
|
||
→ - Sequence Flow (order of activities)
|
||
--- → - Message Flow (between pools)
|
||
.... - Association (link to artifacts)
|
||
```
|
||
|
||
**5. Swimlanes**:
|
||
|
||
```markdown
|
||
Pool: Represents an organization or major participant
|
||
Lane: Subdivides pool by role or department
|
||
```
|
||
|
||
#### BPMN Diagram Example
|
||
|
||
```mermaid
|
||
flowchart TB
|
||
Start([Start: Customer Order Received]) --> Validate{Validate Order}
|
||
Validate -->|Valid| CheckStock[Check Inventory]
|
||
Validate -->|Invalid| NotifyError[Notify Customer of Error]
|
||
NotifyError --> End1([End])
|
||
|
||
CheckStock --> StockDecision{In Stock?}
|
||
StockDecision -->|Yes| ProcessPayment[Process Payment]
|
||
StockDecision -->|No| Backorder{Backorder Available?}
|
||
|
||
Backorder -->|Yes| CreateBackorder[Create Backorder]
|
||
Backorder -->|No| NotifyOut[Notify Out of Stock]
|
||
CreateBackorder --> ProcessPayment
|
||
NotifyOut --> End2([End])
|
||
|
||
ProcessPayment --> PaymentOK{Payment Approved?}
|
||
PaymentOK -->|Yes| FulfillOrder[Fulfill Order]
|
||
PaymentOK -->|No| NotifyPaymentFail[Notify Payment Failed]
|
||
NotifyPaymentFail --> End3([End])
|
||
|
||
FulfillOrder --> ShipOrder[Ship Order]
|
||
ShipOrder --> NotifyShipped[Send Shipping Confirmation]
|
||
NotifyShipped --> End4([End: Order Complete])
|
||
```
|
||
|
||
#### BPMN Best Practices
|
||
|
||
**DO**:
|
||
- Start with high-level process, then detail
|
||
- Use consistent naming conventions (Verb + Noun)
|
||
- Keep diagrams readable (one page if possible)
|
||
- Show happy path clearly
|
||
- Document exceptions and error handling
|
||
- Use swimlanes to show responsibilities
|
||
- Include timing information when relevant
|
||
|
||
**DON'T**:
|
||
- Mix different levels of detail
|
||
- Create overly complex diagrams (max 20-30 elements)
|
||
- Use technical jargon for business processes
|
||
- Forget to show end states
|
||
- Ignore exception flows
|
||
- Create diagrams without validation from process owners
|
||
|
||
### 2.2 Swimlane Diagrams
|
||
|
||
Swimlanes show which role or department performs each activity.
|
||
|
||
#### Swimlane Structure
|
||
|
||
```markdown
|
||
## Order Processing (Swimlane View)
|
||
|
||
┌─────────────────────────────────────────────────────────────┐
|
||
│ CUSTOMER │
|
||
├─────────────────────────────────────────────────────────────┤
|
||
│ ○ Place Order → [Fill Order Form] → Submit → │
|
||
│ ↓ │
|
||
│ ← [Review Confirmation] │
|
||
└─────────────────────────────────────────────────────────────┘
|
||
|
||
┌─────────────────────────────────────────────────────────────┐
|
||
│ SALES │
|
||
├─────────────────────────────────────────────────────────────┤
|
||
│ ↑ │
|
||
│ [Receive Order] → {Valid?} ─No→ [Reject] │
|
||
│ │ │
|
||
│ Yes │
|
||
│ ↓ │
|
||
│ [Check Credit] → {OK?} │
|
||
│ │ │
|
||
│ Yes │
|
||
│ ↓ │
|
||
└─────────────────────────────────────────────────────────────┘
|
||
|
||
┌─────────────────────────────────────────────────────────────┐
|
||
│ WAREHOUSE │
|
||
├─────────────────────────────────────────────────────────────┤
|
||
│ ↑ │
|
||
│ [Pick Items] → [Pack Order] │
|
||
│ ↓ │
|
||
└─────────────────────────────────────────────────────────────┘
|
||
|
||
┌─────────────────────────────────────────────────────────────┐
|
||
│ SHIPPING │
|
||
├─────────────────────────────────────────────────────────────┤
|
||
│ ↑ │
|
||
│ [Create Label] → [Ship] → ⊗ │
|
||
└─────────────────────────────────────────────────────────────┘
|
||
```
|
||
|
||
#### Swimlane Template
|
||
|
||
```markdown
|
||
## Process: [Process Name]
|
||
|
||
**Purpose**: [What this process accomplishes]
|
||
**Trigger**: [What starts this process]
|
||
**Outcome**: [What is produced]
|
||
|
||
### Swimlanes (Roles/Departments)
|
||
|
||
**Lane 1: [Role Name]**
|
||
- Step 1.1: [Activity]
|
||
- Step 1.2: [Activity]
|
||
- Decision 1.3: [Gateway]
|
||
|
||
**Lane 2: [Role Name]**
|
||
- Step 2.1: [Activity]
|
||
- Step 2.2: [Activity]
|
||
|
||
**Lane 3: [Role Name]**
|
||
- Step 3.1: [Activity]
|
||
- Step 3.2: [Activity]
|
||
|
||
### Handoffs
|
||
|
||
| From | To | What is Transferred | Method | Time |
|
||
|------|-----|---------------------|--------|------|
|
||
| Sales | Warehouse | Order details | System X | Real-time |
|
||
| Warehouse | Shipping | Packed order | Physical handoff | 15 min |
|
||
|
||
### Notes
|
||
- [Important information about process]
|
||
- [Exceptions or special cases]
|
||
```
|
||
|
||
### 2.3 Process Analysis (As-Is vs To-Be)
|
||
|
||
#### As-Is Process Analysis
|
||
|
||
**Purpose**: Document current state to identify improvement opportunities.
|
||
|
||
**As-Is Analysis Template**:
|
||
|
||
```markdown
|
||
## As-Is Process: [Process Name]
|
||
|
||
**Last Updated**: [Date]
|
||
**Process Owner**: [Name]
|
||
**Frequency**: [How often process runs]
|
||
**Average Duration**: [Time to complete]
|
||
|
||
### Process Overview
|
||
[Brief description of what process does today]
|
||
|
||
### Process Steps
|
||
|
||
| Step | Activity | Role | System | Duration | Issues |
|
||
|------|----------|------|--------|----------|--------|
|
||
| 1 | Receive request | Admin | Email | 5 min | Manual entry required |
|
||
| 2 | Validate data | Analyst | Excel | 30 min | No validation rules |
|
||
| 3 | Approve request | Manager | Paper form | 2 days | Manager often unavailable |
|
||
|
||
### Process Metrics
|
||
|
||
**Efficiency Metrics**:
|
||
- Total cycle time: 3-5 days
|
||
- Active work time: 2 hours
|
||
- Wait time: 90% of cycle time
|
||
- Rework rate: 20%
|
||
- Error rate: 15%
|
||
|
||
**Volume Metrics**:
|
||
- Requests per month: 200
|
||
- Peak volume: 350 (month-end)
|
||
- Staff required: 3 FTEs
|
||
|
||
**Cost Metrics**:
|
||
- Labor cost per transaction: $45
|
||
- System costs: $500/month
|
||
- Error correction cost: $2,000/month
|
||
|
||
### Pain Points Identified
|
||
|
||
**1. Manual Data Entry**
|
||
- **Issue**: Request form must be re-typed into system
|
||
- **Impact**: Time consuming, error-prone
|
||
- **Frequency**: Every request
|
||
- **Impact Score**: High
|
||
|
||
**2. Approval Delays**
|
||
- **Issue**: Manager approval requires physical signature
|
||
- **Impact**: 2-3 day delays common, longer if manager traveling
|
||
- **Frequency**: Every request
|
||
- **Impact Score**: High
|
||
|
||
**3. No Validation**
|
||
- **Issue**: Data errors discovered late in process
|
||
- **Impact**: Rework and delays
|
||
- **Frequency**: 20% of requests
|
||
- **Impact Score**: Medium
|
||
|
||
### Bottlenecks
|
||
1. Manager approval (48-72 hour delay)
|
||
2. Data validation (30 minutes of manual checking)
|
||
3. Month-end volume spike (causes 5-day backlog)
|
||
|
||
### Workarounds
|
||
- Analysts email manager for urgent approvals
|
||
- Pre-validation by submitter (informal)
|
||
- Overtime during month-end
|
||
|
||
### Root Causes
|
||
- Legacy systems not integrated
|
||
- Manual approval policy never updated
|
||
- No investment in automation tools
|
||
```
|
||
|
||
#### To-Be Process Design
|
||
|
||
**Purpose**: Define future state that addresses pain points.
|
||
|
||
**To-Be Design Template**:
|
||
|
||
```markdown
|
||
## To-Be Process: [Process Name]
|
||
|
||
**Target Implementation**: [Date]
|
||
**Process Owner**: [Name]
|
||
**Expected Frequency**: [How often]
|
||
**Target Duration**: [Time to complete]
|
||
|
||
### Process Overview
|
||
[Description of improved process]
|
||
|
||
### Improvements Over As-Is
|
||
|
||
| Current State | Future State | Improvement |
|
||
|---------------|--------------|-------------|
|
||
| Manual data entry | Web form with integration | 80% time reduction |
|
||
| Physical signature | Electronic approval | 90% faster approval |
|
||
| Manual validation | Automated rules | 100% error detection |
|
||
|
||
### Process Steps (To-Be)
|
||
|
||
| Step | Activity | Role | System | Duration | Changes from As-Is |
|
||
|------|----------|------|--------|----------|-------------------|
|
||
| 1 | Submit request | Requester | Web portal | 2 min | Self-service, validation |
|
||
| 2 | Auto-validate | System | Portal | 30 sec | Automated |
|
||
| 3 | Approve request | Manager | Portal (mobile) | 1 hour | Electronic, notifications |
|
||
|
||
### Expected Metrics
|
||
|
||
**Efficiency Improvements**:
|
||
- Total cycle time: 4 hours (was 3-5 days)
|
||
- Active work time: 30 minutes (was 2 hours)
|
||
- Wait time: 10% (was 90%)
|
||
- Rework rate: 2% (was 20%)
|
||
- Error rate: 1% (was 15%)
|
||
|
||
**Capacity Improvements**:
|
||
- Staff required: 1 FTE (was 3)
|
||
- Peak handling: 500/month (was 350)
|
||
- No overtime needed
|
||
|
||
**Cost Savings**:
|
||
- Labor cost per transaction: $8 (was $45)
|
||
- Annual labor savings: $88,800
|
||
- Error correction savings: $21,600/year
|
||
- ROI: 18 months
|
||
|
||
### Changes Required
|
||
|
||
**Technology**:
|
||
- [ ] Implement web portal
|
||
- [ ] Integrate with core system
|
||
- [ ] Build validation rules
|
||
- [ ] Enable electronic signatures
|
||
- [ ] Mobile app for managers
|
||
|
||
**Process**:
|
||
- [ ] Update approval policy
|
||
- [ ] Create self-service help
|
||
- [ ] Define SLAs
|
||
- [ ] Update training materials
|
||
|
||
**People**:
|
||
- [ ] Train requesters on portal
|
||
- [ ] Train managers on mobile approval
|
||
- [ ] Redeploy 2 FTEs to other work
|
||
|
||
**Governance**:
|
||
- [ ] Update policy documents
|
||
- [ ] Get executive approval
|
||
- [ ] Communicate changes
|
||
- [ ] Establish metrics dashboard
|
||
|
||
### Implementation Plan
|
||
|
||
**Phase 1: Foundation (Month 1-2)**
|
||
- Build web portal
|
||
- Integrate systems
|
||
- Pilot with small group
|
||
|
||
**Phase 2: Rollout (Month 3)**
|
||
- Train all users
|
||
- Full launch
|
||
- Monitor closely
|
||
|
||
**Phase 3: Optimize (Month 4-6)**
|
||
- Gather feedback
|
||
- Fine-tune process
|
||
- Measure benefits
|
||
|
||
### Risk Mitigation
|
||
|
||
| Risk | Probability | Impact | Mitigation |
|
||
|------|-------------|--------|------------|
|
||
| User adoption | Medium | High | Extensive training, champions |
|
||
| System integration | Low | High | Prototype early, fallback plan |
|
||
| Process not followed | Medium | Medium | Clear communication, monitoring |
|
||
```
|
||
|
||
### 2.4 Process Improvement Identification
|
||
|
||
#### Process Improvement Framework
|
||
|
||
**DMAIC Methodology** (Six Sigma approach):
|
||
|
||
```markdown
|
||
**Define**: What process needs improvement?
|
||
- Identify process scope
|
||
- Define problem statement
|
||
- Establish goals and metrics
|
||
|
||
**Measure**: How is the process performing?
|
||
- Map current process
|
||
- Collect baseline data
|
||
- Identify pain points
|
||
|
||
**Analyze**: Why are problems occurring?
|
||
- Root cause analysis
|
||
- Identify waste and inefficiency
|
||
- Determine improvement opportunities
|
||
|
||
**Improve**: What changes will help?
|
||
- Design future state
|
||
- Pilot improvements
|
||
- Validate benefits
|
||
|
||
**Control**: How do we sustain improvements?
|
||
- Implement monitoring
|
||
- Train staff
|
||
- Document new process
|
||
```
|
||
|
||
#### Seven Wastes (LEAN)
|
||
|
||
Identify and eliminate waste in processes:
|
||
|
||
```markdown
|
||
1. **Transportation**: Unnecessary movement of materials/information
|
||
Example: Printing document just to scan it elsewhere
|
||
|
||
2. **Inventory**: Excess information or materials waiting
|
||
Example: Queue of 100 unprocessed requests
|
||
|
||
3. **Motion**: Unnecessary movement of people
|
||
Example: Walking to another building for signatures
|
||
|
||
4. **Waiting**: Idle time between activities
|
||
Example: Waiting 2 days for approval
|
||
|
||
5. **Overproduction**: Creating more than immediately needed
|
||
Example: Generating unused reports "just in case"
|
||
|
||
6. **Overprocessing**: More work than required
|
||
Example: Multiple people reviewing same document
|
||
|
||
7. **Defects**: Errors requiring rework
|
||
Example: Incorrect data entry requiring correction
|
||
```
|
||
|
||
#### Improvement Identification Template
|
||
|
||
```markdown
|
||
## Process Improvement Opportunities: [Process]
|
||
|
||
### Quick Wins (High Impact, Low Effort)
|
||
|
||
**1. [Improvement Name]**
|
||
- **Current Issue**: [What's wrong]
|
||
- **Proposed Solution**: [How to fix]
|
||
- **Expected Benefit**: [What improves]
|
||
- **Effort**: [Hours/days to implement]
|
||
- **Cost**: [Estimated cost]
|
||
- **Dependencies**: [What's needed]
|
||
|
||
**2. [Improvement Name]**
|
||
[Same structure]
|
||
|
||
### Strategic Improvements (High Impact, High Effort)
|
||
|
||
**1. [Improvement Name]**
|
||
- **Current Issue**: [What's wrong]
|
||
- **Proposed Solution**: [How to fix]
|
||
- **Expected Benefit**: [What improves]
|
||
- **Effort**: [Weeks/months to implement]
|
||
- **Cost**: [Estimated cost]
|
||
- **Dependencies**: [What's needed]
|
||
|
||
### Small Enhancements (Low Impact, Low Effort)
|
||
|
||
**1. [Improvement Name]**
|
||
[Same structure]
|
||
|
||
### Not Recommended (Low Impact, High Effort)
|
||
- [Improvement that isn't worth it]
|
||
|
||
### Prioritization Matrix
|
||
|
||
```
|
||
High Impact │ 3. Strategic │ 1. Quick Win
|
||
│ │
|
||
├────────────────┼───────────────
|
||
│ │
|
||
Low Impact │ 4. Not Worth │ 2. Enhancement
|
||
│ │
|
||
└────────────────┴───────────────
|
||
High Effort Low Effort
|
||
```
|
||
|
||
### Implementation Roadmap
|
||
|
||
**Q1**: Quick Wins 1, 2, 3
|
||
**Q2**: Strategic Improvement 1 (Phase 1)
|
||
**Q3**: Strategic Improvement 1 (Phase 2), Enhancement 1
|
||
**Q4**: Strategic Improvement 2
|
||
```
|
||
|
||
---
|
||
|
||
## 3. Requirements Documentation
|
||
|
||
Clear, testable requirements are the foundation of successful projects.
|
||
|
||
### 3.1 User Stories (As a, I want, So that)
|
||
|
||
User stories describe functionality from user perspective.
|
||
|
||
#### User Story Structure
|
||
|
||
```markdown
|
||
As a [type of user]
|
||
I want [goal/desire]
|
||
So that [benefit/value]
|
||
```
|
||
|
||
**Example**:
|
||
```markdown
|
||
As a customer
|
||
I want to track my order status online
|
||
So that I know when to expect delivery without calling support
|
||
```
|
||
|
||
#### Writing Good User Stories
|
||
|
||
**INVEST Criteria**:
|
||
|
||
```markdown
|
||
**I - Independent**: Story can be developed standalone
|
||
**N - Negotiable**: Details can be discussed
|
||
**V - Valuable**: Delivers value to user/business
|
||
**E - Estimable**: Team can size the effort
|
||
**S - Small**: Can be completed in one iteration
|
||
**T - Testable**: Clear acceptance criteria
|
||
```
|
||
|
||
**Examples of Good vs. Bad User Stories**:
|
||
|
||
**Bad** (Too technical):
|
||
```markdown
|
||
As a developer
|
||
I want to implement REST API endpoints
|
||
So that data can be accessed
|
||
```
|
||
|
||
**Good** (User-focused):
|
||
```markdown
|
||
As a mobile app user
|
||
I want to sync my data across devices
|
||
So that I can access my information anywhere
|
||
```
|
||
|
||
**Bad** (Too vague):
|
||
```markdown
|
||
As a user
|
||
I want better reporting
|
||
So that I can do my job
|
||
```
|
||
|
||
**Good** (Specific):
|
||
```markdown
|
||
As a sales manager
|
||
I want to see daily sales by region in a dashboard
|
||
So that I can quickly identify underperforming territories
|
||
```
|
||
|
||
#### User Story Template
|
||
|
||
```markdown
|
||
## User Story: [Short Title]
|
||
|
||
**ID**: US-###
|
||
**Epic**: [Parent epic]
|
||
**Priority**: [Must/Should/Could Have]
|
||
**Story Points**: [Estimate]
|
||
|
||
### Story
|
||
|
||
As a [role]
|
||
I want [feature]
|
||
So that [benefit]
|
||
|
||
### Acceptance Criteria
|
||
|
||
1. Given [context]
|
||
When [action]
|
||
Then [outcome]
|
||
|
||
2. Given [context]
|
||
When [action]
|
||
Then [outcome]
|
||
|
||
3. Given [context]
|
||
When [action]
|
||
Then [outcome]
|
||
|
||
### Additional Details
|
||
|
||
**User Persona**: [Which persona this serves]
|
||
**Business Value**: [Why this matters]
|
||
**Dependencies**: [Other stories or systems needed]
|
||
**Assumptions**: [What we're assuming]
|
||
|
||
### Technical Notes
|
||
- [Technical consideration 1]
|
||
- [Technical consideration 2]
|
||
|
||
### Questions
|
||
- [ ] [Open question to resolve]
|
||
|
||
### Definition of Done
|
||
- [ ] Code complete and reviewed
|
||
- [ ] Unit tests written and passing
|
||
- [ ] Acceptance criteria verified
|
||
- [ ] Documentation updated
|
||
- [ ] Deployed to staging
|
||
```
|
||
|
||
#### User Story Examples by Type
|
||
|
||
**Feature Story**:
|
||
```markdown
|
||
As a customer
|
||
I want to filter products by price range
|
||
So that I can find items within my budget
|
||
|
||
**Acceptance Criteria**:
|
||
1. Given I'm on the product listing page
|
||
When I set a minimum and maximum price
|
||
Then only products in that range are displayed
|
||
|
||
2. Given I've applied a price filter
|
||
When no products match the range
|
||
Then I see "No products found" message
|
||
|
||
3. Given I've applied a price filter
|
||
When I click "Clear Filters"
|
||
Then all products are displayed again
|
||
```
|
||
|
||
**Bug Fix Story**:
|
||
```markdown
|
||
As a user
|
||
I want the shopping cart to persist my items
|
||
So that I don't lose my selections when I close the browser
|
||
|
||
**Acceptance Criteria**:
|
||
1. Given I've added items to my cart
|
||
When I close the browser
|
||
Then my items are still in cart when I return
|
||
|
||
2. Given I've added items on desktop
|
||
When I login on mobile
|
||
Then I see the same cart items
|
||
```
|
||
|
||
**Technical Story** (when absolutely necessary):
|
||
```markdown
|
||
As a development team
|
||
We want to upgrade the database to version 12
|
||
So that we can use improved performance features
|
||
|
||
**Acceptance Criteria**:
|
||
1. Database upgraded with zero data loss
|
||
2. All existing queries still function
|
||
3. Rollback plan tested and documented
|
||
```
|
||
|
||
### 3.2 Use Cases Structure
|
||
|
||
Use cases describe interactions between actors and system to achieve a goal.
|
||
|
||
#### Use Case Template
|
||
|
||
```markdown
|
||
## Use Case: [Name]
|
||
|
||
**ID**: UC-###
|
||
**Priority**: [High/Medium/Low]
|
||
**Status**: [Draft/Reviewed/Approved]
|
||
|
||
### Brief Description
|
||
[One paragraph overview of what this use case accomplishes]
|
||
|
||
### Actors
|
||
- **Primary Actor**: [Who initiates this use case]
|
||
- **Secondary Actors**: [Other participants]
|
||
- **Systems**: [External systems involved]
|
||
|
||
### Preconditions
|
||
- [Condition that must be true before use case starts]
|
||
- [Another precondition]
|
||
|
||
### Postconditions
|
||
**Success**:
|
||
- [What's true after successful completion]
|
||
- [Another postcondition]
|
||
|
||
**Failure**:
|
||
- [What's true if use case fails]
|
||
|
||
### Main Success Scenario
|
||
1. [Actor] [action]
|
||
2. System [response]
|
||
3. [Actor] [action]
|
||
4. System [response]
|
||
5. Use case ends successfully
|
||
|
||
### Extensions (Alternate Flows)
|
||
|
||
**3a. Invalid Data Entered**
|
||
3a1. System displays validation error
|
||
3a2. System highlights problematic fields
|
||
3a3. Use case continues at step 3
|
||
|
||
**4a. System Timeout**
|
||
4a1. System displays timeout message
|
||
4a2. System saves partial progress
|
||
4a3. Use case ends in failure
|
||
|
||
**\*a. Actor Cancels**
|
||
\*a1. System prompts to confirm cancellation
|
||
\*a2. System discards changes
|
||
\*a3. Use case ends
|
||
|
||
### Special Requirements
|
||
- [Non-functional requirement relevant to this use case]
|
||
- [Another special requirement]
|
||
|
||
### Frequency of Use
|
||
[How often: Continuous / Daily / Weekly / Monthly / Rare]
|
||
|
||
### Business Rules
|
||
- BR-1: [Business rule that applies]
|
||
- BR-2: [Another business rule]
|
||
|
||
### User Interface Mockup
|
||
[Reference to mockup or wireframe if available]
|
||
|
||
### Open Issues
|
||
- [Question or issue to resolve]
|
||
```
|
||
|
||
#### Detailed Use Case Example
|
||
|
||
```markdown
|
||
## Use Case: Process Refund Request
|
||
|
||
**ID**: UC-012
|
||
**Priority**: High
|
||
**Status**: Approved
|
||
|
||
### Brief Description
|
||
Customer service representative processes a customer's refund request for a returned item, validating eligibility and issuing refund through the appropriate payment method.
|
||
|
||
### Actors
|
||
- **Primary Actor**: Customer Service Representative
|
||
- **Secondary Actors**: Customer, Accounting System
|
||
- **Systems**: Order Management System, Payment Gateway
|
||
|
||
### Preconditions
|
||
- Representative is logged into Order Management System
|
||
- Customer has provided order number
|
||
- Order exists in system
|
||
- Product has been returned and received in warehouse
|
||
|
||
### Postconditions
|
||
**Success**:
|
||
- Refund is approved and processed
|
||
- Customer receives email confirmation
|
||
- Accounting records are updated
|
||
- Order status updated to "Refunded"
|
||
|
||
**Failure**:
|
||
- Refund is denied
|
||
- Customer is notified of denial reason
|
||
- Order status remains unchanged
|
||
|
||
### Main Success Scenario
|
||
1. Representative enters order number
|
||
2. System displays order details and refund eligibility
|
||
3. Representative verifies return reason with customer
|
||
4. Representative selects items for refund
|
||
5. System calculates refund amount based on return policy
|
||
6. System displays refund amount and payment method
|
||
7. Representative confirms refund processing
|
||
8. System processes refund through payment gateway
|
||
9. System updates order status to "Refunded"
|
||
10. System sends confirmation email to customer
|
||
11. Use case ends successfully
|
||
|
||
### Extensions (Alternate Flows)
|
||
|
||
**2a. Order Not Found**
|
||
2a1. System displays "Order not found" error
|
||
2a2. System prompts to re-enter order number
|
||
2a3. Use case continues at step 1
|
||
|
||
**2b. Order Not Eligible for Refund**
|
||
2b1. System displays reason for ineligibility
|
||
2b2. Representative explains policy to customer
|
||
2b3. Use case ends in failure
|
||
|
||
**5a. Partial Refund Required**
|
||
5a1. Representative adjusts refund amount
|
||
5a2. Representative enters justification note
|
||
5a3. System requires manager approval
|
||
5a4. Manager reviews and approves/denies
|
||
5a5. Use case continues at step 6 (if approved)
|
||
|
||
**8a. Payment Gateway Error**
|
||
8a1. System displays error message
|
||
8a2. System logs error for technical team
|
||
8a3. Representative notes issue in customer record
|
||
8a4. Use case continues at step 8 (retry)
|
||
8a5. If retry fails, representative escalates to supervisor
|
||
|
||
**8b. Original Payment Method Invalid**
|
||
8b1. System alerts representative
|
||
8b2. Representative requests alternate refund method
|
||
8b3. Customer provides alternative (check, store credit)
|
||
8b4. Use case continues at step 8 with new method
|
||
|
||
### Special Requirements
|
||
- Refund must process within 5 business days
|
||
- All refunds over $500 require manager approval
|
||
- System must maintain audit trail of all actions
|
||
- Compliance with PCI DSS for payment data
|
||
|
||
### Frequency of Use
|
||
Approximately 50-100 times per day across all representatives
|
||
|
||
### Business Rules
|
||
- BR-012: Products must be returned within 30 days of purchase
|
||
- BR-013: Refund amount is purchase price minus shipping unless item defective
|
||
- BR-014: Store credit option provides 10% bonus value
|
||
- BR-015: Final sale items are not refundable
|
||
|
||
### User Interface Mockup
|
||
See wireframe: Refund-Processing-Screen-v2.png
|
||
|
||
### Open Issues
|
||
- Waiting for confirmation on international refund processing time
|
||
- Need to clarify partial return shipping fee policy
|
||
```
|
||
|
||
### 3.3 Functional vs Non-Functional Requirements
|
||
|
||
#### Functional Requirements
|
||
|
||
**Definition**: What the system must do - specific behaviors and functions.
|
||
|
||
**Categories**:
|
||
```markdown
|
||
1. **Business Logic**: Calculations, validations, business rules
|
||
2. **Data Management**: CRUD operations, data manipulation
|
||
3. **User Interaction**: Interface behaviors, workflows
|
||
4. **Integration**: Interactions with other systems
|
||
5. **Reporting**: Information presentation and export
|
||
```
|
||
|
||
**Functional Requirement Template**:
|
||
```markdown
|
||
**FR-###: [Requirement Title]**
|
||
|
||
**Description**: [Detailed description of what system must do]
|
||
|
||
**Priority**: [Must/Should/Could Have]
|
||
|
||
**Rationale**: [Why this requirement exists]
|
||
|
||
**Acceptance Criteria**:
|
||
1. [Testable criterion 1]
|
||
2. [Testable criterion 2]
|
||
3. [Testable criterion 3]
|
||
|
||
**Dependencies**: [Related requirements or systems]
|
||
|
||
**Business Rule Reference**: [Related business rules]
|
||
```
|
||
|
||
**Examples**:
|
||
|
||
```markdown
|
||
**FR-101: Password Reset**
|
||
The system shall allow users to reset their password via email verification.
|
||
|
||
**Acceptance Criteria**:
|
||
1. User can request password reset by entering email address
|
||
2. System sends reset link valid for 24 hours
|
||
3. User can set new password meeting complexity requirements
|
||
4. System invalidates old password upon successful reset
|
||
5. System sends confirmation email after reset
|
||
|
||
---
|
||
|
||
**FR-102: Invoice Calculation**
|
||
The system shall calculate invoice total as sum of line items plus applicable taxes minus discounts.
|
||
|
||
**Acceptance Criteria**:
|
||
1. Line item total = quantity × unit price
|
||
2. Subtotal = sum of all line items
|
||
3. Tax = subtotal × tax rate (based on ship-to location)
|
||
4. Discount = subtotal × discount percentage (if applicable)
|
||
5. Total = subtotal + tax - discount
|
||
6. All amounts rounded to 2 decimal places
|
||
|
||
---
|
||
|
||
**FR-103: Order Status Notification**
|
||
The system shall automatically send email notifications when order status changes.
|
||
|
||
**Acceptance Criteria**:
|
||
1. Email sent when order placed (confirmation)
|
||
2. Email sent when order shipped (with tracking number)
|
||
3. Email sent when order delivered
|
||
4. Email sent if order cancelled
|
||
5. User can opt-out of non-essential notifications
|
||
6. Email template uses branding guidelines
|
||
```
|
||
|
||
#### Non-Functional Requirements
|
||
|
||
**Definition**: How the system performs - quality attributes and constraints.
|
||
|
||
**Categories (FURPS+)**:
|
||
|
||
```markdown
|
||
**F - Functionality**: Already covered in functional requirements
|
||
|
||
**U - Usability**: User experience, accessibility
|
||
**R - Reliability**: Availability, fault tolerance
|
||
**P - Performance**: Speed, throughput, capacity
|
||
**S - Supportability**: Maintainability, testability
|
||
|
||
**+ Additional Categories**:
|
||
- Design constraints
|
||
- Implementation requirements
|
||
- Interface requirements
|
||
- Physical requirements
|
||
- Security requirements
|
||
- Compliance requirements
|
||
```
|
||
|
||
**Non-Functional Requirement Template**:
|
||
```markdown
|
||
**NFR-###: [Requirement Title]**
|
||
|
||
**Category**: [Usability/Performance/Security/etc.]
|
||
|
||
**Description**: [Detailed description]
|
||
|
||
**Priority**: [Must/Should/Could Have]
|
||
|
||
**Measurement**: [How to measure/verify]
|
||
|
||
**Acceptance Criteria**: [Testable criteria]
|
||
```
|
||
|
||
**Examples by Category**:
|
||
|
||
**Usability Requirements**:
|
||
```markdown
|
||
**NFR-201: Response Time Perception**
|
||
Category: Usability
|
||
The system shall provide feedback within 0.1 seconds for user actions.
|
||
|
||
**Measurement**: User testing and timing analysis
|
||
|
||
**Acceptance Criteria**:
|
||
1. Button clicks show visual response within 100ms
|
||
2. Loading indicators appear for operations over 1 second
|
||
3. Progress bars update for operations over 5 seconds
|
||
|
||
---
|
||
|
||
**NFR-202: Accessibility Compliance**
|
||
Category: Usability
|
||
The system shall comply with WCAG 2.1 Level AA standards.
|
||
|
||
**Acceptance Criteria**:
|
||
1. All images have descriptive alt text
|
||
2. Interface navigable via keyboard only
|
||
3. Minimum contrast ratio of 4.5:1 for text
|
||
4. Screen reader compatible
|
||
5. No time-based interactions under 5 seconds
|
||
```
|
||
|
||
**Performance Requirements**:
|
||
```markdown
|
||
**NFR-301: Page Load Time**
|
||
Category: Performance
|
||
Web pages shall load in under 2 seconds on standard broadband connection.
|
||
|
||
**Measurement**: Load testing with typical data volumes
|
||
|
||
**Acceptance Criteria**:
|
||
1. 95% of page loads under 2 seconds
|
||
2. 99% of page loads under 3 seconds
|
||
3. Measured with 50ms latency, 5Mbps bandwidth
|
||
|
||
---
|
||
|
||
**NFR-302: Concurrent Users**
|
||
Category: Performance
|
||
System shall support 1,000 concurrent users without degradation.
|
||
|
||
**Measurement**: Load testing
|
||
|
||
**Acceptance Criteria**:
|
||
1. Response time remains under 2 seconds at 1,000 users
|
||
2. No errors or timeouts at maximum load
|
||
3. Resource utilization under 80% at peak
|
||
```
|
||
|
||
**Reliability Requirements**:
|
||
```markdown
|
||
**NFR-401: System Availability**
|
||
Category: Reliability
|
||
System shall be available 99.9% of time during business hours (8am-8pm ET).
|
||
|
||
**Measurement**: Uptime monitoring
|
||
|
||
**Acceptance Criteria**:
|
||
1. Maximum 43 minutes downtime per month
|
||
2. Planned maintenance outside business hours
|
||
3. Disaster recovery in under 4 hours
|
||
|
||
---
|
||
|
||
**NFR-402: Data Backup**
|
||
Category: Reliability
|
||
System shall backup all data daily with 30-day retention.
|
||
|
||
**Acceptance Criteria**:
|
||
1. Automated backup runs daily at 2am
|
||
2. Backup completion verified within 1 hour
|
||
3. Monthly restore test conducted
|
||
4. Off-site backup copy maintained
|
||
```
|
||
|
||
**Security Requirements**:
|
||
```markdown
|
||
**NFR-501: Authentication**
|
||
Category: Security
|
||
System shall require multi-factor authentication for all users.
|
||
|
||
**Acceptance Criteria**:
|
||
1. Username/password as first factor
|
||
2. SMS, authenticator app, or hardware token as second factor
|
||
3. Session timeout after 30 minutes inactivity
|
||
4. Account lockout after 5 failed attempts
|
||
|
||
---
|
||
|
||
**NFR-502: Data Encryption**
|
||
Category: Security
|
||
System shall encrypt all sensitive data at rest and in transit.
|
||
|
||
**Acceptance Criteria**:
|
||
1. AES-256 encryption for data at rest
|
||
2. TLS 1.3 for data in transit
|
||
3. Encryption keys rotated quarterly
|
||
4. PII data encrypted in database
|
||
```
|
||
|
||
### 3.4 Acceptance Criteria
|
||
|
||
Acceptance criteria define when a requirement is "done."
|
||
|
||
#### Given-When-Then Format
|
||
|
||
```markdown
|
||
**Given** [initial context/precondition]
|
||
**When** [action/event occurs]
|
||
**Then** [expected outcome]
|
||
```
|
||
|
||
**Examples**:
|
||
|
||
```markdown
|
||
## User Story: Shopping Cart Quantity Update
|
||
|
||
**Acceptance Criteria**:
|
||
|
||
**AC1: Increase Quantity**
|
||
Given I have an item with quantity 1 in my cart
|
||
When I click the increase quantity button
|
||
Then the quantity updates to 2
|
||
And the item subtotal reflects new quantity
|
||
And the cart total updates accordingly
|
||
|
||
**AC2: Decrease Quantity**
|
||
Given I have an item with quantity 2 in my cart
|
||
When I click the decrease quantity button
|
||
Then the quantity updates to 1
|
||
And the item subtotal reflects new quantity
|
||
|
||
**AC3: Remove Item**
|
||
Given I have an item with quantity 1 in my cart
|
||
When I click the decrease quantity button
|
||
Then the item is removed from cart
|
||
And I see "Item removed" confirmation message
|
||
|
||
**AC4: Maximum Quantity**
|
||
Given I have an item with quantity 10 in my cart
|
||
When I try to increase quantity
|
||
Then I see "Maximum quantity reached" error
|
||
And quantity remains at 10
|
||
|
||
**AC5: Direct Entry**
|
||
Given I'm viewing my cart
|
||
When I type "5" in the quantity field and press Enter
|
||
Then the quantity updates to 5
|
||
And validations run (positive integer, in stock)
|
||
```
|
||
|
||
#### Checklist Format
|
||
|
||
For simpler requirements, use checklist:
|
||
|
||
```markdown
|
||
## Feature: User Profile Settings
|
||
|
||
**Acceptance Criteria**:
|
||
- [ ] User can update first and last name
|
||
- [ ] User can update email address (with verification)
|
||
- [ ] User can upload profile photo (max 5MB, JPG/PNG only)
|
||
- [ ] User can change password (requires current password)
|
||
- [ ] User can enable/disable email notifications
|
||
- [ ] User can set timezone preference
|
||
- [ ] User can delete account (with confirmation)
|
||
- [ ] All changes are saved with "Settings updated" message
|
||
- [ ] Validation errors display clearly
|
||
- [ ] Form is mobile-responsive
|
||
```
|
||
|
||
#### Edge Cases in Acceptance Criteria
|
||
|
||
Always consider edge cases:
|
||
|
||
```markdown
|
||
## Feature: Search Functionality
|
||
|
||
**Acceptance Criteria**:
|
||
|
||
**Happy Path**:
|
||
Given I enter "laptop" in search
|
||
When I click Search
|
||
Then I see relevant results ranked by relevance
|
||
And I see result count
|
||
And I can sort and filter results
|
||
|
||
**Edge Cases**:
|
||
|
||
**Empty Search**:
|
||
Given the search box is empty
|
||
When I click Search
|
||
Then I see "Please enter a search term" message
|
||
And no results are shown
|
||
|
||
**No Results**:
|
||
Given I enter "xyzabc123" in search
|
||
When I click Search
|
||
Then I see "No results found" message
|
||
And I see suggestions for similar terms
|
||
|
||
**Special Characters**:
|
||
Given I enter search with special characters (*, &, <, >)
|
||
When I click Search
|
||
Then special characters are properly escaped
|
||
And search executes without error
|
||
|
||
**Very Long Search**:
|
||
Given I enter 500 character search string
|
||
When I click Search
|
||
Then I see "Search term too long" error
|
||
And maximum length is indicated
|
||
|
||
**SQL Injection Attempt**:
|
||
Given I enter "'; DROP TABLE users;--"
|
||
When I click Search
|
||
Then input is properly sanitized
|
||
And no SQL is executed
|
||
And search treats it as literal string
|
||
```
|
||
|
||
### 3.5 Traceability Matrix
|
||
|
||
Traceability links requirements to their sources and implementations.
|
||
|
||
#### Requirements Traceability Matrix (RTM)
|
||
|
||
```markdown
|
||
## Requirements Traceability Matrix
|
||
|
||
**Project**: [Project Name]
|
||
**Date**: [Date]
|
||
**Version**: [Version]
|
||
|
||
| Req ID | Requirement | Source | Priority | Design Doc | Test Case | Status |
|
||
|--------|-------------|--------|----------|------------|-----------|--------|
|
||
| BR-001 | Business Rule 1 | Stakeholder Interview 1 | Must | DD-01 | TC-001, TC-002 | Complete |
|
||
| FR-101 | Login functionality | BR-001 | Must | DD-02 | TC-010-015 | In Progress |
|
||
| FR-102 | Password reset | BR-001 | Should | DD-02 | TC-020-022 | Not Started |
|
||
| NFR-201 | Page load < 2s | Performance SLA | Must | DD-05 | TC-100 | Complete |
|
||
| US-050 | User dashboard | Workshop 3 | Must | DD-03 | TC-030-035 | Testing |
|
||
```
|
||
|
||
**Column Definitions**:
|
||
- **Req ID**: Unique identifier
|
||
- **Requirement**: Brief description
|
||
- **Source**: Where requirement originated
|
||
- **Priority**: Must/Should/Could/Won't Have
|
||
- **Design Doc**: Design documentation reference
|
||
- **Test Case**: Test cases that verify requirement
|
||
- **Status**: Current implementation status
|
||
|
||
#### Forward and Backward Traceability
|
||
|
||
**Forward Traceability** (Requirement → Deliverables):
|
||
```markdown
|
||
Business Need → Business Requirement → Functional Requirement → Design → Code → Test
|
||
```
|
||
|
||
**Backward Traceability** (Deliverables → Requirement):
|
||
```markdown
|
||
Test ← Code ← Design ← Functional Requirement ← Business Requirement ← Business Need
|
||
```
|
||
|
||
**Example**:
|
||
|
||
```markdown
|
||
## Traceability Chain: Fast Checkout
|
||
|
||
**Business Need**: BN-10
|
||
"Reduce cart abandonment rate by simplifying checkout"
|
||
|
||
**Business Requirement**: BR-45
|
||
"Checkout process must require no more than 3 steps"
|
||
|
||
**Functional Requirements**:
|
||
- FR-220: Single page checkout design
|
||
- FR-221: Guest checkout option
|
||
- FR-222: Saved payment methods for registered users
|
||
- FR-223: Address auto-complete
|
||
|
||
**Design Documents**:
|
||
- DD-15: Checkout Flow Design
|
||
- DD-16: Payment Integration Design
|
||
|
||
**Implementation**:
|
||
- Code Module: checkout_module.py
|
||
- Database: checkout_schema.sql
|
||
- API: /api/checkout endpoint
|
||
|
||
**Test Cases**:
|
||
- TC-500: Guest checkout flow
|
||
- TC-501: Registered user checkout
|
||
- TC-502: Checkout performance
|
||
- TC-503: Checkout validation
|
||
|
||
**Validation**:
|
||
- Cart abandonment reduced from 68% to 45%
|
||
- Average checkout time reduced from 4:30 to 2:15
|
||
- Customer satisfaction score increased 15%
|
||
```
|
||
|
||
---
|
||
|
||
## 4. Analysis Techniques
|
||
|
||
### 4.1 Gap Analysis
|
||
|
||
Gap analysis identifies differences between current and desired states.
|
||
|
||
#### Gap Analysis Framework
|
||
|
||
```markdown
|
||
## Gap Analysis: [Process/System Name]
|
||
|
||
**Date**: [Date]
|
||
**Analyst**: [Name]
|
||
**Stakeholders**: [Names]
|
||
|
||
### Current State (As-Is)
|
||
|
||
**Capabilities**:
|
||
- [What we can do today]
|
||
- [Current feature/process]
|
||
- [Existing functionality]
|
||
|
||
**Performance**:
|
||
- [Current metrics]
|
||
- [Performance levels]
|
||
|
||
**Limitations**:
|
||
- [What we cannot do]
|
||
- [Constraints]
|
||
- [Bottlenecks]
|
||
|
||
### Desired State (To-Be)
|
||
|
||
**Required Capabilities**:
|
||
- [What we need to do]
|
||
- [Required features]
|
||
- [Target functionality]
|
||
|
||
**Performance Targets**:
|
||
- [Target metrics]
|
||
- [Desired performance levels]
|
||
|
||
**Success Criteria**:
|
||
- [What success looks like]
|
||
- [Measurable outcomes]
|
||
|
||
### Gap Identification
|
||
|
||
| Area | Current State | Desired State | Gap | Impact |
|
||
|------|---------------|---------------|-----|--------|
|
||
| Functionality | Manual data entry | Automated import | No import capability | High - 3hrs/day wasted |
|
||
| Performance | 5 min response | 30 sec response | 4.5 min improvement needed | Medium - user frustration |
|
||
| Capacity | 100 users | 500 users | 400 additional users | High - business growth limited |
|
||
| Integration | Manual transfer | Real-time sync | No integration | High - errors and delays |
|
||
|
||
### Root Cause Analysis
|
||
|
||
**Gap 1: No Import Capability**
|
||
- **Why?**: Legacy system built before APIs existed
|
||
- **Why?**: No budget for modernization
|
||
- **Why?**: Priority given to other projects
|
||
- **Root Cause**: Lack of business case for ROI
|
||
|
||
### Impact Assessment
|
||
|
||
**Business Impact**:
|
||
- Lost productivity: 750 hours/year
|
||
- Cost: $30,000/year in labor
|
||
- Opportunity cost: Cannot serve enterprise clients
|
||
|
||
**Technical Impact**:
|
||
- Technical debt increasing
|
||
- System maintenance burden
|
||
- Risk of system failure
|
||
|
||
**User Impact**:
|
||
- Frustration and workarounds
|
||
- Training burden for new staff
|
||
- Errors due to manual entry
|
||
|
||
### Recommendations
|
||
|
||
**Priority 1: Quick Wins** (0-3 months)
|
||
1. **Bulk Import via CSV**
|
||
- Effort: 2 weeks development
|
||
- Cost: $8,000
|
||
- Benefit: 50% time savings
|
||
- ROI: 3 months
|
||
|
||
**Priority 2: Strategic** (3-12 months)
|
||
2. **API Integration**
|
||
- Effort: 3 months
|
||
- Cost: $75,000
|
||
- Benefit: 90% time savings, real-time data
|
||
- ROI: 12 months
|
||
|
||
**Priority 3: Future**:
|
||
3. **System Replacement**
|
||
- Effort: 12 months
|
||
- Cost: $500,000
|
||
- Benefit: All gaps closed
|
||
- ROI: 24 months
|
||
|
||
### Implementation Roadmap
|
||
|
||
**Phase 1** (Q1): Bulk CSV import
|
||
**Phase 2** (Q2-Q3): API integration
|
||
**Phase 3** (Q4): Performance optimization
|
||
**Phase 4** (Year 2): Evaluate system replacement
|
||
|
||
### Success Metrics
|
||
|
||
**How we'll measure closure of gaps**:
|
||
- Import time reduced by 80%
|
||
- Data error rate below 1%
|
||
- User satisfaction score > 8/10
|
||
- System handles 500 concurrent users
|
||
```
|
||
|
||
### 4.2 Root Cause Analysis
|
||
|
||
#### 5 Whys Technique
|
||
|
||
Ask "Why?" five times to drill down to root cause.
|
||
|
||
**Example**:
|
||
|
||
```markdown
|
||
## 5 Whys: Customer Orders Delayed
|
||
|
||
**Problem**: Customer orders are consistently delayed by 2-3 days
|
||
|
||
**Why #1**: Why are orders delayed?
|
||
Answer: Orders sit in queue waiting for processing
|
||
|
||
**Why #2**: Why do orders sit in queue?
|
||
Answer: Processing team is backlogged
|
||
|
||
**Why #3**: Why is the team backlogged?
|
||
Answer: Manual validation of each order takes 30 minutes
|
||
|
||
**Why #4**: Why does validation take so long?
|
||
Answer: Must check 5 different systems for data
|
||
|
||
**Why #5**: Why must they check 5 different systems?
|
||
Answer: Systems are not integrated; no single source of truth
|
||
|
||
**Root Cause**: Lack of system integration creates manual, time-consuming validation process
|
||
|
||
**Solution**: Integrate systems to enable automated validation
|
||
```
|
||
|
||
#### Fishbone (Ishikawa) Diagram
|
||
|
||
Organize potential causes into categories.
|
||
|
||
```markdown
|
||
## Fishbone Diagram: High Customer Complaint Rate
|
||
|
||
People Process
|
||
/ /
|
||
Insufficient training No quality checks
|
||
/ /
|
||
High turnover Unclear procedures
|
||
/ /
|
||
/ /
|
||
/ /
|
||
/____________________/
|
||
/ \
|
||
/ \
|
||
/ \
|
||
Poor communication Outdated system
|
||
/ \
|
||
No escalation path Slow response
|
||
/ \
|
||
Methods Technology
|
||
|
||
|
||
**Root Causes Identified**:
|
||
|
||
**People**:
|
||
- High turnover rate (50% annually)
|
||
- Insufficient training (1 day only)
|
||
- Poor communication between shifts
|
||
|
||
**Process**:
|
||
- No quality control checkpoints
|
||
- Unclear escalation procedures
|
||
- No standard complaint resolution process
|
||
|
||
**Technology**:
|
||
- CRM system outdated (8 years old)
|
||
- System response time slow (5+ seconds)
|
||
- No mobile access for field staff
|
||
|
||
**Methods**:
|
||
- No structured approach to complaint handling
|
||
- Inconsistent documentation
|
||
- Lack of follow-up process
|
||
|
||
**Action Plan**:
|
||
Priority 1: Implement quality checkpoints (Process)
|
||
Priority 2: Upgrade CRM system (Technology)
|
||
Priority 3: Develop comprehensive training (People)
|
||
```
|
||
|
||
### 4.3 Impact Analysis
|
||
|
||
Impact analysis evaluates consequences of changes.
|
||
|
||
#### Impact Analysis Template
|
||
|
||
```markdown
|
||
## Impact Analysis: [Change Description]
|
||
|
||
**Change ID**: CHG-###
|
||
**Date**: [Date]
|
||
**Analyst**: [Name]
|
||
**Requested By**: [Stakeholder]
|
||
|
||
### Change Summary
|
||
[Brief description of proposed change]
|
||
|
||
### Scope of Impact
|
||
|
||
**Systems Affected**:
|
||
- [System 1] - [High/Medium/Low impact]
|
||
- [System 2] - [High/Medium/Low impact]
|
||
|
||
**Business Processes Affected**:
|
||
- [Process 1] - [Description of impact]
|
||
- [Process 2] - [Description of impact]
|
||
|
||
**Stakeholder Groups Affected**:
|
||
| Group | Impact Level | Nature of Impact | Mitigation |
|
||
|-------|--------------|------------------|------------|
|
||
| End Users | High | Must learn new interface | Training program |
|
||
| IT Operations | Medium | New monitoring requirements | Documentation |
|
||
| Customers | Low | Minimal UI changes | Communication |
|
||
|
||
### Detailed Impact Analysis
|
||
|
||
**Functional Impact**:
|
||
- **Positive**:
|
||
- [Capability added or improved]
|
||
- [Problem solved]
|
||
|
||
- **Negative**:
|
||
- [Capability removed or changed]
|
||
- [New limitations]
|
||
|
||
**Technical Impact**:
|
||
- Database schema changes required
|
||
- API contracts modified
|
||
- Infrastructure scaling needed
|
||
- Integration points affected: [List]
|
||
|
||
**Data Impact**:
|
||
- Data migration required: [Yes/No]
|
||
- Data volume affected: [Amount]
|
||
- Data quality risks: [Description]
|
||
- Archive/backup needs: [Requirements]
|
||
|
||
**Performance Impact**:
|
||
- Expected performance change: [Better/Worse/Same]
|
||
- Load increase: [Percentage]
|
||
- Resource requirements: [CPU/Memory/Storage]
|
||
|
||
**Security Impact**:
|
||
- Security model changes: [Yes/No]
|
||
- New vulnerabilities: [Description]
|
||
- Compliance implications: [Requirements]
|
||
|
||
**User Experience Impact**:
|
||
- Learning curve: [High/Medium/Low]
|
||
- Workflow changes: [Description]
|
||
- Training required: [Hours/Days]
|
||
|
||
### Risk Assessment
|
||
|
||
| Risk | Probability | Impact | Mitigation |
|
||
|------|-------------|--------|------------|
|
||
| Data loss during migration | Low | High | Full backup, pilot test |
|
||
| User resistance to change | High | Medium | Change management plan |
|
||
| Integration failures | Medium | High | Extensive testing, rollback plan |
|
||
| Performance degradation | Low | Medium | Load testing, monitoring |
|
||
|
||
### Dependencies
|
||
|
||
**Prerequisites**:
|
||
- [What must be complete before this change]
|
||
- [Required approvals]
|
||
|
||
**Blocked By**:
|
||
- [What would prevent this change]
|
||
|
||
**Blocks**:
|
||
- [What depends on this change]
|
||
|
||
### Cost-Benefit Analysis
|
||
|
||
**Costs**:
|
||
- Development: $[Amount]
|
||
- Testing: $[Amount]
|
||
- Training: $[Amount]
|
||
- Infrastructure: $[Amount]
|
||
- **Total**: $[Amount]
|
||
|
||
**Benefits**:
|
||
- Efficiency gain: [Quantified]
|
||
- Cost savings: $[Amount/year]
|
||
- Revenue increase: $[Amount/year]
|
||
- Risk reduction: [Description]
|
||
- **Annual Benefit**: $[Amount]
|
||
|
||
**ROI**: [Percentage] | **Payback Period**: [Months]
|
||
|
||
### Implementation Considerations
|
||
|
||
**Effort Estimate**: [Hours/Days/Weeks]
|
||
|
||
**Timeline**:
|
||
- Analysis: [Timeframe]
|
||
- Development: [Timeframe]
|
||
- Testing: [Timeframe]
|
||
- Training: [Timeframe]
|
||
- Deployment: [Timeframe]
|
||
- **Total**: [Timeframe]
|
||
|
||
**Resource Requirements**:
|
||
- Developers: [Number] for [Duration]
|
||
- Testers: [Number] for [Duration]
|
||
- Business Analysts: [Number] for [Duration]
|
||
|
||
### Recommendations
|
||
|
||
**Recommendation**: [Approve/Defer/Reject]
|
||
|
||
**Justification**:
|
||
[Reasoning for recommendation based on analysis]
|
||
|
||
**Conditions** (if approved):
|
||
- [Condition 1]
|
||
- [Condition 2]
|
||
|
||
**Alternatives Considered**:
|
||
1. [Alternative approach 1] - [Why not chosen]
|
||
2. [Alternative approach 2] - [Why not chosen]
|
||
```
|
||
|
||
### 4.4 Cost-Benefit Analysis
|
||
|
||
#### Cost-Benefit Analysis Template
|
||
|
||
```markdown
|
||
## Cost-Benefit Analysis: [Initiative Name]
|
||
|
||
**Date**: [Date]
|
||
**Analysis Period**: [Number] years
|
||
**Analyst**: [Name]
|
||
|
||
### Executive Summary
|
||
[2-3 sentences: What is being analyzed and recommendation]
|
||
|
||
### Costs (One-Time)
|
||
|
||
**Development Costs**:
|
||
- Requirements & Design: $[Amount]
|
||
- Development: $[Amount]
|
||
- Testing: $[Amount]
|
||
- Project Management: $[Amount]
|
||
- **Subtotal**: $[Amount]
|
||
|
||
**Infrastructure Costs**:
|
||
- Hardware: $[Amount]
|
||
- Software Licenses: $[Amount]
|
||
- Cloud Setup: $[Amount]
|
||
- **Subtotal**: $[Amount]
|
||
|
||
**Change Management Costs**:
|
||
- Training Development: $[Amount]
|
||
- User Training: $[Amount]
|
||
- Communication: $[Amount]
|
||
- **Subtotal**: $[Amount]
|
||
|
||
**Other One-Time Costs**:
|
||
- Data Migration: $[Amount]
|
||
- Consulting: $[Amount]
|
||
- **Subtotal**: $[Amount]
|
||
|
||
**Total One-Time Costs**: $[Amount]
|
||
|
||
### Costs (Recurring/Annual)
|
||
|
||
**Operational Costs**:
|
||
- Software Licenses: $[Amount/year]
|
||
- Infrastructure: $[Amount/year]
|
||
- Support & Maintenance: $[Amount/year]
|
||
- **Subtotal**: $[Amount/year]
|
||
|
||
**Personnel Costs**:
|
||
- Additional Staff: $[Amount/year]
|
||
- Training (ongoing): $[Amount/year]
|
||
- **Subtotal**: $[Amount/year]
|
||
|
||
**Total Annual Costs**: $[Amount/year]
|
||
|
||
### Benefits (One-Time)
|
||
|
||
**Process Improvement**:
|
||
- Reduction in backlog: $[Amount]
|
||
- Avoided penalties: $[Amount]
|
||
- **Subtotal**: $[Amount]
|
||
|
||
**Total One-Time Benefits**: $[Amount]
|
||
|
||
### Benefits (Recurring/Annual)
|
||
|
||
**Efficiency Gains**:
|
||
- Time savings: [Hours/week] × [Rate] = $[Amount/year]
|
||
- Reduced errors: $[Amount/year]
|
||
- Faster processing: $[Amount/year]
|
||
- **Subtotal**: $[Amount/year]
|
||
|
||
**Cost Avoidance**:
|
||
- Reduced manual labor: $[Amount/year]
|
||
- Lower error correction costs: $[Amount/year]
|
||
- Reduced system maintenance: $[Amount/year]
|
||
- **Subtotal**: $[Amount/year]
|
||
|
||
**Revenue Impact**:
|
||
- Increased capacity: $[Amount/year]
|
||
- New capabilities: $[Amount/year]
|
||
- Customer retention: $[Amount/year]
|
||
- **Subtotal**: $[Amount/year]
|
||
|
||
**Risk Reduction**:
|
||
- Avoided compliance penalties: $[Amount/year]
|
||
- Reduced system downtime: $[Amount/year]
|
||
- **Subtotal**: $[Amount/year]
|
||
|
||
**Total Annual Benefits**: $[Amount/year]
|
||
|
||
### Financial Analysis
|
||
|
||
**3-Year Projection**:
|
||
|
||
| Year | Costs | Benefits | Net Benefit | Cumulative |
|
||
|------|-------|----------|-------------|------------|
|
||
| 0 | $[Initial] | $0 | $([Initial]) | $([Initial]) |
|
||
| 1 | $[Annual] | $[Annual] | $[Net] | $[Cumulative] |
|
||
| 2 | $[Annual] | $[Annual] | $[Net] | $[Cumulative] |
|
||
| 3 | $[Annual] | $[Annual] | $[Net] | $[Cumulative] |
|
||
| **Total** | **$[Total]** | **$[Total]** | **$[Total]** | - |
|
||
|
||
**Key Metrics**:
|
||
- **Net Present Value (NPV)**: $[Amount]
|
||
- **Return on Investment (ROI)**: [Percentage]%
|
||
- **Payback Period**: [Months]
|
||
- **Benefit-Cost Ratio**: [Ratio]:1
|
||
|
||
**NPV Calculation** (at [X]% discount rate):
|
||
```
|
||
Year 0: $([Initial cost])
|
||
Year 1: $[Net benefit] / 1.10 = $[PV]
|
||
Year 2: $[Net benefit] / 1.21 = $[PV]
|
||
Year 3: $[Net benefit] / 1.33 = $[PV]
|
||
NPV = Sum of above = $[Total NPV]
|
||
```
|
||
|
||
### Qualitative Benefits
|
||
|
||
**Intangible Benefits** (not quantified above):
|
||
- Improved employee morale
|
||
- Enhanced customer satisfaction
|
||
- Competitive advantage
|
||
- Improved decision-making capability
|
||
- Future scalability
|
||
- Risk mitigation
|
||
|
||
### Sensitivity Analysis
|
||
|
||
**Optimistic Scenario** (benefits 20% higher):
|
||
- ROI: [Percentage]%
|
||
- Payback: [Months]
|
||
|
||
**Most Likely Scenario** (base case above):
|
||
- ROI: [Percentage]%
|
||
- Payback: [Months]
|
||
|
||
**Pessimistic Scenario** (benefits 20% lower):
|
||
- ROI: [Percentage]%
|
||
- Payback: [Months]
|
||
|
||
### Risks and Assumptions
|
||
|
||
**Key Assumptions**:
|
||
- [Assumption 1 that impacts calculation]
|
||
- [Assumption 2 that impacts calculation]
|
||
|
||
**Risks to Benefits**:
|
||
- [Risk that could reduce benefits]
|
||
- [Another risk]
|
||
|
||
**Mitigation Strategies**:
|
||
- [How to address risks]
|
||
|
||
### Recommendation
|
||
|
||
**Recommendation**: [Proceed/Don't Proceed/Further Analysis]
|
||
|
||
**Rationale**:
|
||
[Explanation based on financial analysis and qualitative factors]
|
||
|
||
**Conditions for Approval**:
|
||
- [Condition 1]
|
||
- [Condition 2]
|
||
|
||
**Next Steps**:
|
||
1. [Step 1]
|
||
2. [Step 2]
|
||
```
|
||
|
||
### 4.5 Risk Analysis
|
||
|
||
#### Risk Analysis Template
|
||
|
||
```markdown
|
||
## Risk Analysis: [Project/Initiative Name]
|
||
|
||
**Date**: [Date]
|
||
**Analyst**: [Name]
|
||
**Review Date**: [When to review again]
|
||
|
||
### Risk Identification
|
||
|
||
| Risk ID | Category | Description | Source |
|
||
|---------|----------|-------------|--------|
|
||
| R-001 | Technical | System integration failure | Technical assessment |
|
||
| R-002 | Resource | Key developer unavailable | Resource plan |
|
||
| R-003 | Business | Requirements change mid-project | Stakeholder interviews |
|
||
|
||
### Risk Assessment Matrix
|
||
|
||
**Probability Scale**:
|
||
- **High (H)**: >50% chance
|
||
- **Medium (M)**: 20-50% chance
|
||
- **Low (L)**: <20% chance
|
||
|
||
**Impact Scale**:
|
||
- **High (H)**: >$50K impact or project failure
|
||
- **Medium (M)**: $10K-$50K impact or major delay
|
||
- **Low (L)**: <$10K impact or minor delay
|
||
|
||
**Risk Matrix**:
|
||
```
|
||
│ Low Impact │ Med Impact │ High Impact
|
||
──────────┼────────────┼────────────┼─────────────
|
||
High Prob │ Medium │ High │ High
|
||
├────────────┼────────────┼─────────────
|
||
Med Prob │ Low │ Medium │ High
|
||
├────────────┼────────────┼─────────────
|
||
Low Prob │ Low │ Low │ Medium
|
||
```
|
||
|
||
### Detailed Risk Register
|
||
|
||
**Risk R-001: System Integration Failure**
|
||
|
||
**Category**: Technical
|
||
**Probability**: Medium (30%)
|
||
**Impact**: High (Could delay launch by 3 months, $150K impact)
|
||
**Risk Score**: High
|
||
**Owner**: Technical Lead
|
||
|
||
**Description**:
|
||
Third-party system API may not support required functionality or may have performance issues.
|
||
|
||
**Triggers**:
|
||
- API documentation incomplete
|
||
- Performance testing reveals issues
|
||
- Authentication failures
|
||
|
||
**Impact Details**:
|
||
- 3-month delay to find alternative or build custom solution
|
||
- $150K additional development cost
|
||
- Potential loss of customer confidence
|
||
- May miss market window
|
||
|
||
**Mitigation Strategy** (Reduce probability/impact):
|
||
- Proof of concept with vendor's API (Week 1-2)
|
||
- Early performance testing (Week 3-4)
|
||
- Identify alternative vendors upfront
|
||
- Include fallback option in architecture
|
||
- Escalate to vendor technical team early
|
||
|
||
**Contingency Plan** (If risk occurs):
|
||
- Switch to alternative vendor (Vendor B)
|
||
- Build custom integration layer (3 weeks, $30K)
|
||
- Negotiate with vendor for technical support
|
||
|
||
**Current Status**: ⚠️ Monitoring (POC in progress)
|
||
|
||
---
|
||
|
||
**Risk R-002: Key Developer Unavailability**
|
||
|
||
**Category**: Resource
|
||
**Probability**: Low (15%)
|
||
**Impact**: Medium (2-week delay, $20K impact)
|
||
**Risk Score**: Low
|
||
**Owner**: Project Manager
|
||
|
||
**Description**:
|
||
Lead developer may leave during project or be unavailable due to illness/emergency.
|
||
|
||
**Mitigation Strategy**:
|
||
- Knowledge sharing sessions weekly
|
||
- Code reviews for knowledge transfer
|
||
- Document complex design decisions
|
||
- Cross-train secondary developer
|
||
- Maintain good morale and engagement
|
||
|
||
**Contingency Plan**:
|
||
- Promote secondary developer to lead
|
||
- Hire contractor with required skills
|
||
- Reduce scope to critical features only
|
||
|
||
**Current Status**: ✅ Under Control
|
||
|
||
---
|
||
|
||
**Risk R-003: Requirements Change Mid-Project**
|
||
|
||
**Category**: Business
|
||
**Probability**: High (60%)
|
||
**Impact**: Medium (Could add 4 weeks, $40K)
|
||
**Risk Score**: High
|
||
**Owner**: Business Analyst
|
||
|
||
**Description**:
|
||
Stakeholders may request significant changes after requirements are baselined.
|
||
|
||
**Mitigation Strategy**:
|
||
- Clear change control process
|
||
- Regular stakeholder demos (every 2 weeks)
|
||
- Sign-off on requirements document
|
||
- Prioritize features (MVP vs. nice-to-have)
|
||
- Frequent communication of impact of changes
|
||
|
||
**Contingency Plan**:
|
||
- Formal change request process
|
||
- Impact analysis required for all changes
|
||
- Defer non-critical changes to Phase 2
|
||
- Add time buffer to schedule (20%)
|
||
|
||
**Current Status**: 🔴 High Priority (Managing actively)
|
||
|
||
### Risk Summary Dashboard
|
||
|
||
**Risk Distribution**:
|
||
- High Priority: 2 risks
|
||
- Medium Priority: 3 risks
|
||
- Low Priority: 5 risks
|
||
- **Total**: 10 risks
|
||
|
||
**By Category**:
|
||
- Technical: 4 risks
|
||
- Resource: 2 risks
|
||
- Business: 3 risks
|
||
- External: 1 risk
|
||
|
||
**Top 3 Risks** (by risk score):
|
||
1. R-001: System Integration Failure
|
||
2. R-003: Requirements Change
|
||
3. R-005: Data Migration Issues
|
||
|
||
### Risk Response Budget
|
||
|
||
**Contingency Reserve**: $75,000
|
||
**Management Reserve**: $25,000
|
||
**Total Risk Budget**: $100,000
|
||
|
||
### Risk Monitoring Plan
|
||
|
||
**Review Frequency**: Bi-weekly at project status meeting
|
||
|
||
**Escalation Criteria**:
|
||
- New high-priority risk identified
|
||
- Existing risk probability/impact increases
|
||
- Risk occurs
|
||
|
||
**Reporting**:
|
||
- Risk register updated in project management tool
|
||
- Top 5 risks reported to steering committee monthly
|
||
- Risk trend analysis (improving/stable/worsening)
|
||
```
|
||
|
||
---
|
||
|
||
## 5. Tools & Deliverables
|
||
|
||
### 5.1 Business Requirements Document (BRD) Structure
|
||
|
||
#### BRD Template
|
||
|
||
```markdown
|
||
# Business Requirements Document
|
||
|
||
**Project Name**: [Project Name]
|
||
**Document Version**: [Version]
|
||
**Date**: [Date]
|
||
**Status**: [Draft/Review/Approved]
|
||
|
||
**Document Control**:
|
||
| Version | Date | Author | Changes |
|
||
|---------|------|--------|---------|
|
||
| 0.1 | [Date] | [Name] | Initial draft |
|
||
| 0.2 | [Date] | [Name] | Incorporated feedback |
|
||
| 1.0 | [Date] | [Name] | Approved version |
|
||
|
||
**Approvals**:
|
||
| Name | Role | Signature | Date |
|
||
|------|------|-----------|------|
|
||
| [Name] | Project Sponsor | | |
|
||
| [Name] | Business Owner | | |
|
||
| [Name] | IT Lead | | |
|
||
|
||
---
|
||
|
||
## 1. Executive Summary
|
||
|
||
### 1.1 Purpose
|
||
[1-2 paragraphs: Why this project exists, what problem it solves]
|
||
|
||
### 1.2 Scope
|
||
**In Scope**:
|
||
- [Major deliverable 1]
|
||
- [Major deliverable 2]
|
||
|
||
**Out of Scope**:
|
||
- [What is explicitly not included]
|
||
- [Future phase items]
|
||
|
||
### 1.3 Expected Benefits
|
||
- [Key benefit 1 with quantification]
|
||
- [Key benefit 2 with quantification]
|
||
- [Key benefit 3 with quantification]
|
||
|
||
### 1.4 Success Criteria
|
||
- [Measurable success criterion 1]
|
||
- [Measurable success criterion 2]
|
||
- [Measurable success criterion 3]
|
||
|
||
---
|
||
|
||
## 2. Business Context
|
||
|
||
### 2.1 Background
|
||
[Current situation, history, why change is needed now]
|
||
|
||
### 2.2 Business Objectives
|
||
| Objective | Measure | Target |
|
||
|-----------|---------|--------|
|
||
| Improve efficiency | Processing time | Reduce by 50% |
|
||
| Increase capacity | Transactions/day | Increase from 100 to 500 |
|
||
| Enhance quality | Error rate | Reduce to <1% |
|
||
|
||
### 2.3 Strategic Alignment
|
||
[How this project supports company strategy, goals, initiatives]
|
||
|
||
---
|
||
|
||
## 3. Stakeholders
|
||
|
||
### 3.1 Stakeholder Analysis
|
||
|
||
| Stakeholder | Role | Interest | Influence | Engagement Strategy |
|
||
|-------------|------|----------|-----------|-------------------|
|
||
| Jane Smith | Project Sponsor | High | High | Weekly updates, decision involvement |
|
||
| Sales Team | End Users | High | Medium | Demos, training, feedback sessions |
|
||
| IT Department | Implementers | Medium | High | Regular technical meetings |
|
||
|
||
### 3.2 Organizational Impact
|
||
[Which departments/teams are affected and how]
|
||
|
||
---
|
||
|
||
## 4. Current State Assessment
|
||
|
||
### 4.1 Current Process
|
||
[Description or diagram of how things work today]
|
||
|
||
### 4.2 Current System Capabilities
|
||
[What current systems/tools can and cannot do]
|
||
|
||
### 4.3 Pain Points and Limitations
|
||
|
||
**Pain Point 1: Manual Data Entry**
|
||
- **Description**: Users must re-key data from emails into system
|
||
- **Impact**: 2 hours per day per user, 15% error rate
|
||
- **Frequency**: Every transaction (200/day)
|
||
- **Cost**: $30,000/year in labor + error correction
|
||
|
||
**Pain Point 2**: [Similar structure]
|
||
|
||
### 4.4 Current State Metrics
|
||
- Average processing time: 45 minutes
|
||
- Error rate: 15%
|
||
- Customer satisfaction: 6.5/10
|
||
- System availability: 95%
|
||
|
||
---
|
||
|
||
## 5. Business Requirements
|
||
|
||
### 5.1 Business Capabilities Required
|
||
|
||
**BR-001: Automated Data Capture**
|
||
- **Description**: System must automatically capture data from email and other sources without manual re-entry
|
||
- **Business Value**: Eliminate 2 hours/day manual work per user
|
||
- **Priority**: Must Have
|
||
- **Success Metric**: 90% of data auto-captured
|
||
|
||
**BR-002**: [Similar structure for each requirement]
|
||
|
||
### 5.2 Business Rules
|
||
|
||
**Rule BR-001**: Orders over $10,000 require manager approval
|
||
**Rule BR-002**: Customer credit limit = 2x average monthly purchases (minimum $1,000)
|
||
**Rule BR-003**: Refunds must be processed within 5 business days
|
||
|
||
### 5.3 Business Process Requirements
|
||
|
||
[Process diagrams or descriptions of required business processes]
|
||
|
||
---
|
||
|
||
## 6. Functional Requirements
|
||
|
||
### 6.1 User Requirements
|
||
|
||
**As a** Sales Representative
|
||
**I need** to view customer order history
|
||
**So that** I can provide informed recommendations
|
||
|
||
**Acceptance Criteria**:
|
||
- View last 12 months of orders
|
||
- See order status and amount
|
||
- Access from mobile device
|
||
|
||
### 6.2 Functional Requirements Summary
|
||
|
||
| Req ID | Requirement | Priority | Complexity |
|
||
|--------|-------------|----------|------------|
|
||
| FR-001 | User login and authentication | Must Have | Medium |
|
||
| FR-002 | Dashboard with key metrics | Must Have | High |
|
||
| FR-003 | Order entry and validation | Must Have | High |
|
||
| FR-004 | Reporting and analytics | Should Have | Medium |
|
||
|
||
[Detailed FR specifications in separate FRD or appendix]
|
||
|
||
---
|
||
|
||
## 7. Non-Functional Requirements
|
||
|
||
### 7.1 Performance Requirements
|
||
- Page load time: < 2 seconds
|
||
- System response time: < 1 second
|
||
- Support 500 concurrent users
|
||
|
||
### 7.2 Availability Requirements
|
||
- 99.5% uptime during business hours (7am-7pm ET)
|
||
- Planned maintenance window: Sundays 1am-5am
|
||
|
||
### 7.3 Security Requirements
|
||
- Multi-factor authentication
|
||
- Role-based access control
|
||
- All data encrypted at rest and in transit
|
||
- Audit trail of all transactions
|
||
|
||
### 7.4 Compliance Requirements
|
||
- GDPR compliant for EU customer data
|
||
- SOC 2 Type II certified
|
||
- PCI DSS compliant for payment processing
|
||
|
||
### 7.5 Usability Requirements
|
||
- Mobile responsive design
|
||
- WCAG 2.1 Level AA accessible
|
||
- Support for Chrome, Firefox, Safari, Edge
|
||
- Maximum 2 hours training required for new users
|
||
|
||
---
|
||
|
||
## 8. Constraints and Assumptions
|
||
|
||
### 8.1 Constraints
|
||
- **Budget**: Maximum $500,000
|
||
- **Timeline**: Must launch by Q4 2025
|
||
- **Technology**: Must use existing cloud platform (AWS)
|
||
- **Compliance**: Must meet industry regulations
|
||
|
||
### 8.2 Assumptions
|
||
- Users have modern web browsers
|
||
- Stable internet connectivity available
|
||
- Existing systems will remain available
|
||
- Stakeholders available for requirements validation
|
||
|
||
---
|
||
|
||
## 9. Dependencies
|
||
|
||
### 9.1 Internal Dependencies
|
||
- Customer database migration project (must complete first)
|
||
- Network upgrade project (parallel)
|
||
|
||
### 9.2 External Dependencies
|
||
- Third-party payment gateway API
|
||
- Vendor software license approval
|
||
|
||
---
|
||
|
||
## 10. Risks
|
||
|
||
[High-level risks - detailed analysis in separate risk register]
|
||
|
||
| Risk | Impact | Probability | Mitigation |
|
||
|------|--------|-------------|------------|
|
||
| Integration failure | High | Medium | Early POC, backup vendor |
|
||
| User adoption | Medium | High | Change management, training |
|
||
|
||
---
|
||
|
||
## 11. Implementation Approach
|
||
|
||
### 11.1 Recommended Approach
|
||
[High-level: Agile/Waterfall/Hybrid, phased approach]
|
||
|
||
### 11.2 Project Phases
|
||
|
||
**Phase 1: Core Functionality** (Month 1-3)
|
||
- [Key deliverables]
|
||
|
||
**Phase 2: Advanced Features** (Month 4-5)
|
||
- [Key deliverables]
|
||
|
||
**Phase 3: Optimization** (Month 6)
|
||
- [Key deliverables]
|
||
|
||
---
|
||
|
||
## 12. Cost-Benefit Analysis
|
||
|
||
### 12.1 Estimated Costs
|
||
- Development: $300,000
|
||
- Infrastructure: $50,000
|
||
- Training: $25,000
|
||
- **Total**: $375,000
|
||
|
||
### 12.2 Expected Benefits
|
||
- Labor savings: $150,000/year
|
||
- Error reduction: $50,000/year
|
||
- Revenue increase: $100,000/year
|
||
- **Total Annual**: $300,000/year
|
||
|
||
### 12.3 ROI
|
||
- **Payback Period**: 15 months
|
||
- **3-Year NPV**: $525,000
|
||
- **ROI**: 140%
|
||
|
||
---
|
||
|
||
## 13. Success Metrics and KPIs
|
||
|
||
| Metric | Current | Target | Measurement Method |
|
||
|--------|---------|--------|-------------------|
|
||
| Processing time | 45 min | 15 min | System logs |
|
||
| Error rate | 15% | 2% | Quality reports |
|
||
| User satisfaction | 6.5/10 | 8.5/10 | Quarterly survey |
|
||
| System uptime | 95% | 99.5% | Monitoring tools |
|
||
|
||
---
|
||
|
||
## Appendices
|
||
|
||
### Appendix A: Glossary
|
||
[Define key terms and acronyms]
|
||
|
||
### Appendix B: References
|
||
[Related documents, standards, policies]
|
||
|
||
### Appendix C: Detailed Requirements
|
||
[Link to FRD, use cases, detailed specifications]
|
||
```
|
||
|
||
### 5.2 Functional Requirements Document (FRD)
|
||
|
||
#### FRD Template
|
||
|
||
```markdown
|
||
# Functional Requirements Document
|
||
|
||
**Project Name**: [Project Name]
|
||
**Related BRD**: [BRD version reference]
|
||
**Document Version**: [Version]
|
||
**Date**: [Date]
|
||
|
||
---
|
||
|
||
## 1. Introduction
|
||
|
||
### 1.1 Purpose
|
||
This document specifies the detailed functional requirements for [system name].
|
||
|
||
### 1.2 Scope
|
||
[What functions/features are detailed in this document]
|
||
|
||
### 1.3 Audience
|
||
- Development team
|
||
- QA team
|
||
- Business stakeholders
|
||
|
||
---
|
||
|
||
## 2. System Overview
|
||
|
||
### 2.1 System Context
|
||
[How this system fits in larger ecosystem, context diagram]
|
||
|
||
### 2.2 User Roles
|
||
|
||
| Role | Description | Permissions |
|
||
|------|-------------|-------------|
|
||
| Administrator | System admin, full access | Create/Read/Update/Delete all |
|
||
| Manager | Approves requests, views reports | Read all, Approve, Generate reports |
|
||
| User | Daily operations | Create/Read own records, Submit requests |
|
||
| Guest | Limited read access | Read public information only |
|
||
|
||
---
|
||
|
||
## 3. Functional Requirements
|
||
|
||
### 3.1 Module: User Authentication
|
||
|
||
**FR-001: User Login**
|
||
|
||
**Description**: Users must authenticate before accessing the system.
|
||
|
||
**Priority**: Must Have
|
||
**Complexity**: Medium
|
||
**Estimated Effort**: 3 days
|
||
|
||
**Preconditions**:
|
||
- User has valid account
|
||
- System is accessible
|
||
|
||
**Inputs**:
|
||
- Username (email format, max 255 chars)
|
||
- Password (min 8 chars, max 128 chars)
|
||
|
||
**Process**:
|
||
1. User enters credentials
|
||
2. System validates format
|
||
3. System checks against user database
|
||
4. System verifies password hash
|
||
5. System creates session token
|
||
6. System redirects to dashboard
|
||
|
||
**Outputs**:
|
||
- Success: Session token, redirect to dashboard
|
||
- Failure: Error message, remain on login page
|
||
|
||
**Business Rules**:
|
||
- BR-001: Max 5 failed attempts, then 15-minute lockout
|
||
- BR-002: Session expires after 30 minutes of inactivity
|
||
- BR-003: Password must meet complexity requirements
|
||
|
||
**Error Handling**:
|
||
- Invalid email format: "Please enter a valid email address"
|
||
- Incorrect credentials: "Invalid username or password"
|
||
- Account locked: "Account locked due to failed attempts. Try again in X minutes"
|
||
- System error: "Unable to process login. Please try again"
|
||
|
||
**Acceptance Criteria**:
|
||
1. Given valid credentials
|
||
When user clicks Login
|
||
Then user is redirected to dashboard
|
||
And session is created
|
||
|
||
2. Given invalid credentials
|
||
When user clicks Login
|
||
Then error message is displayed
|
||
And user remains on login page
|
||
|
||
3. Given 5 failed login attempts
|
||
When user tries 6th attempt
|
||
Then account is locked for 15 minutes
|
||
And lockout message is displayed
|
||
|
||
**UI Mockup**: [Link to wireframe]
|
||
**Test Cases**: TC-001 through TC-008
|
||
|
||
---
|
||
|
||
**FR-002: Password Reset**
|
||
|
||
[Similar detailed structure for each functional requirement]
|
||
|
||
---
|
||
|
||
### 3.2 Module: Order Management
|
||
|
||
**FR-050: Create Order**
|
||
[Detailed specification]
|
||
|
||
**FR-051: Update Order**
|
||
[Detailed specification]
|
||
|
||
**FR-052: Cancel Order**
|
||
[Detailed specification]
|
||
|
||
---
|
||
|
||
## 4. Data Requirements
|
||
|
||
### 4.1 Data Entities
|
||
|
||
**Entity: User**
|
||
|
||
| Field | Type | Required | Validation | Description |
|
||
|-------|------|----------|------------|-------------|
|
||
| user_id | UUID | Yes | - | Unique identifier |
|
||
| email | String(255) | Yes | Valid email format | User's email |
|
||
| password_hash | String(255) | Yes | - | Hashed password |
|
||
| first_name | String(50) | Yes | Alpha only | User's first name |
|
||
| last_name | String(50) | Yes | Alpha only | User's last name |
|
||
| role | Enum | Yes | Valid role | User's role |
|
||
| created_date | DateTime | Yes | - | Account creation date |
|
||
| last_login | DateTime | No | - | Last successful login |
|
||
| is_active | Boolean | Yes | - | Account status |
|
||
|
||
**Entity: Order**
|
||
[Similar structure]
|
||
|
||
---
|
||
|
||
## 5. Integration Requirements
|
||
|
||
### 5.1 External Systems
|
||
|
||
**Integration: Payment Gateway**
|
||
|
||
**Description**: Process credit card payments through Stripe API
|
||
|
||
**Endpoint**: https://api.stripe.com/v1/charges
|
||
**Method**: POST
|
||
**Authentication**: API Key (Bearer token)
|
||
|
||
**Request**:
|
||
```json
|
||
{
|
||
"amount": 1000,
|
||
"currency": "usd",
|
||
"source": "tok_visa",
|
||
"description": "Order #12345"
|
||
}
|
||
```
|
||
|
||
**Response** (Success):
|
||
```json
|
||
{
|
||
"id": "ch_1234567",
|
||
"status": "succeeded",
|
||
"amount": 1000
|
||
}
|
||
```
|
||
|
||
**Error Handling**:
|
||
- Card declined: Notify user, keep order in pending status
|
||
- Network timeout: Retry 3 times with exponential backoff
|
||
- API error: Log error, notify admin, show user generic error
|
||
|
||
**SLA**: 95% availability, 2-second response time
|
||
|
||
---
|
||
|
||
## 6. Reporting Requirements
|
||
|
||
**Report: Daily Sales Summary**
|
||
|
||
**Description**: Shows sales by product category for selected date range
|
||
|
||
**Parameters**:
|
||
- Start Date (required)
|
||
- End Date (required)
|
||
- Category Filter (optional)
|
||
|
||
**Data Elements**:
|
||
- Date
|
||
- Category
|
||
- Number of Orders
|
||
- Total Sales Amount
|
||
- Average Order Value
|
||
|
||
**Format**: Excel export, PDF view
|
||
**Refresh**: Real-time
|
||
**Access**: Manager role and above
|
||
|
||
---
|
||
|
||
## 7. Validation Rules
|
||
|
||
| Rule ID | Field | Validation | Error Message |
|
||
|---------|-------|------------|---------------|
|
||
| VAL-001 | Email | Valid email format | "Please enter a valid email" |
|
||
| VAL-002 | Phone | 10 digits, US format | "Phone must be 10 digits" |
|
||
| VAL-003 | ZIP Code | 5 or 9 digits | "Invalid ZIP code" |
|
||
| VAL-004 | Order Total | Greater than $0 | "Order total must be greater than zero" |
|
||
|
||
---
|
||
|
||
## 8. Traceability Matrix
|
||
|
||
| FR ID | Business Req | Use Case | Design Doc | Test Cases |
|
||
|-------|--------------|----------|------------|------------|
|
||
| FR-001 | BR-001 | UC-001 | DD-Auth-001 | TC-001 to TC-008 |
|
||
| FR-002 | BR-001 | UC-002 | DD-Auth-002 | TC-009 to TC-012 |
|
||
|
||
---
|
||
|
||
## Appendices
|
||
|
||
### Appendix A: Wireframes
|
||
[UI mockups and wireframes]
|
||
|
||
### Appendix B: API Specifications
|
||
[Detailed API documentation]
|
||
|
||
### Appendix C: Database Schema
|
||
[Entity-relationship diagram]
|
||
```
|
||
|
||
### 5.3 Data Flow Diagrams
|
||
|
||
#### DFD Levels
|
||
|
||
**Level 0 (Context Diagram)**: Shows system as single process with external entities
|
||
|
||
```markdown
|
||
## Context Diagram: Order Management System
|
||
|
||
```
|
||
┌─────────────┐ ┌──────────────┐
|
||
│ Customer │──── Orders ──────> │ Payment │
|
||
│ │<─── Confirmation ─── │ Gateway │
|
||
└─────────────┘ └──────────────┘
|
||
│ │
|
||
↓ ↓
|
||
┌─────────────────────────────────┐
|
||
│ │
|
||
│ Order Management System │
|
||
│ │
|
||
└─────────────────────────────────┘
|
||
│ │
|
||
↓ ↓
|
||
┌─────────────┐ ┌──────────────┐
|
||
│ Warehouse │<─── Pick List ─── │ Inventory │
|
||
│ Staff │──── Shipment ──────> │ System │
|
||
└─────────────┘ └──────────────┘
|
||
```
|
||
```
|
||
|
||
**Level 1 (Overview)**: Shows major processes within system
|
||
|
||
```markdown
|
||
## Level 1 DFD: Order Management
|
||
|
||
```
|
||
Customer ──order──> [1.0 Validate Order] ──valid order──> [2.0 Check Inventory]
|
||
│ │
|
||
│ invalid │ available
|
||
↓ ↓
|
||
[Error Notification] [3.0 Process Payment]
|
||
│
|
||
│ approved
|
||
↓
|
||
[4.0 Fulfill Order]
|
||
│
|
||
↓
|
||
[5.0 Ship Order]
|
||
│
|
||
↓
|
||
Customer <──confirmation
|
||
```
|
||
```
|
||
|
||
**Level 2 (Detailed)**: Shows sub-processes
|
||
|
||
```markdown
|
||
## Level 2 DFD: Process 3.0 - Process Payment
|
||
|
||
```
|
||
Valid Order ──> [3.1 Calculate Total] ──amount──> [3.2 Apply Discounts]
|
||
│
|
||
↓
|
||
[3.3 Submit to Gateway]
|
||
│
|
||
┌──────────────────────┴────────────────────┐
|
||
│ │
|
||
approved declined
|
||
│ │
|
||
↓ ↓
|
||
[3.4 Record Payment] [3.5 Notify Customer]
|
||
│
|
||
↓
|
||
Order Database
|
||
```
|
||
```
|
||
|
||
#### DFD Notation
|
||
|
||
**Processes**: [Process ID.# Process Name]
|
||
- Rectangle with rounded corners
|
||
- Verb-noun naming
|
||
|
||
**Data Stores**: ||Store Name||
|
||
- Open rectangle
|
||
- Noun naming
|
||
|
||
**External Entities**: □ Entity Name
|
||
- Square
|
||
- Outside system boundary
|
||
|
||
**Data Flows**: ──data name──>
|
||
- Arrow showing direction
|
||
- Named with data being transferred
|
||
|
||
### 5.4 Entity Relationship Diagrams
|
||
|
||
#### ERD Example
|
||
|
||
```markdown
|
||
## Entity Relationship Diagram: E-commerce System
|
||
|
||
```
|
||
┌─────────────────┐
|
||
│ CUSTOMER │
|
||
├─────────────────┤
|
||
│ PK customer_id │
|
||
│ first_name │
|
||
│ last_name │
|
||
│ email │
|
||
│ phone │
|
||
└────────┬────────┘
|
||
│
|
||
│ places (1:M)
|
||
│
|
||
↓
|
||
┌─────────────────┐ ┌─────────────────┐
|
||
│ ORDER │ contains│ ORDER_LINE │
|
||
├─────────────────┤ (1:M) ├─────────────────┤
|
||
│ PK order_id │───────→ │ PK line_id │
|
||
│ FK customer_id │ │ FK order_id │
|
||
│ order_date │ │ FK product_id │
|
||
│ status │ │ quantity │
|
||
│ total │ │ unit_price │
|
||
└─────────────────┘ └────────┬────────┘
|
||
│
|
||
│ references (M:1)
|
||
│
|
||
↓
|
||
┌─────────────────┐
|
||
│ PRODUCT │
|
||
├─────────────────┤
|
||
│ PK product_id │
|
||
│ name │
|
||
│ description │
|
||
│ price │
|
||
│ stock_qty │
|
||
└─────────────────┘
|
||
```
|
||
|
||
**Relationship Types**:
|
||
- 1:1 (One-to-One)
|
||
- 1:M (One-to-Many)
|
||
- M:M (Many-to-Many) - requires junction table
|
||
|
||
**Cardinality Notation**:
|
||
- │ (one and only one)
|
||
- ○─ (zero or one)
|
||
- ├─ (one or many)
|
||
- ○< (zero or many)
|
||
```
|
||
|
||
#### ERD with Attributes
|
||
|
||
```markdown
|
||
## Detailed ERD
|
||
|
||
CUSTOMER ||──o{ ORDER : places
|
||
CUSTOMER {
|
||
uuid customer_id PK
|
||
string email UK "NOT NULL"
|
||
string password_hash "NOT NULL"
|
||
string first_name
|
||
string last_name
|
||
string phone
|
||
datetime created_at
|
||
boolean is_active "DEFAULT TRUE"
|
||
}
|
||
|
||
ORDER ||──o{ ORDER_LINE : contains
|
||
ORDER {
|
||
uuid order_id PK
|
||
uuid customer_id FK
|
||
datetime order_date "DEFAULT NOW()"
|
||
string status "DEFAULT 'pending'"
|
||
decimal total_amount
|
||
string shipping_address
|
||
string payment_method
|
||
}
|
||
|
||
ORDER_LINE }o──|| PRODUCT : references
|
||
ORDER_LINE {
|
||
uuid line_id PK
|
||
uuid order_id FK
|
||
uuid product_id FK
|
||
int quantity "CHECK > 0"
|
||
decimal unit_price
|
||
decimal subtotal
|
||
}
|
||
|
||
PRODUCT {
|
||
uuid product_id PK
|
||
string sku UK "NOT NULL"
|
||
string name "NOT NULL"
|
||
text description
|
||
decimal price "CHECK >= 0"
|
||
int stock_quantity "DEFAULT 0"
|
||
string category
|
||
boolean is_active "DEFAULT TRUE"
|
||
}
|
||
```
|
||
|
||
---
|
||
|
||
## Best Practices Summary
|
||
|
||
### Requirements Gathering
|
||
1. Engage stakeholders early and often
|
||
2. Use multiple elicitation techniques
|
||
3. Validate and verify requirements
|
||
4. Document assumptions explicitly
|
||
5. Prioritize ruthlessly
|
||
|
||
### Process Modeling
|
||
1. Start high-level, then detail
|
||
2. Use standard notation (BPMN)
|
||
3. Validate with process owners
|
||
4. Show both as-is and to-be
|
||
5. Identify metrics for improvement
|
||
|
||
### Requirements Documentation
|
||
1. Write clear, testable requirements
|
||
2. Use consistent templates
|
||
3. Maintain traceability
|
||
4. Version control all documents
|
||
5. Get formal approval
|
||
|
||
### Analysis
|
||
1. Data-driven decision making
|
||
2. Consider multiple perspectives
|
||
3. Quantify impacts where possible
|
||
4. Document assumptions and risks
|
||
5. Present recommendations clearly
|
||
|
||
### Deliverables
|
||
1. Tailor to audience
|
||
2. Use visuals effectively
|
||
3. Keep documents current
|
||
4. Link related artifacts
|
||
5. Follow organizational standards
|
||
|
||
---
|
||
|
||
**End of Business Analysis Skill**
|
||
|
||
This comprehensive skill covers all major aspects of business analysis from requirements gathering through deliverable creation. Use these patterns, templates, and techniques to deliver professional business analysis work.
|