# Jira Sprint Planning Command
|
||||
|
||||
Sprint planning, backlog grooming, and sprint execution workflows using jira-cli.
|
||||
|
||||
## Instructions
|
||||
|
||||
Guide users through complete agile sprint ceremonies and workflows using jira-cli.
|
||||
|
||||
## Sprint Lifecycle
|
||||
|
||||
```
|
||||
Backlog Grooming → Sprint Planning → Sprint Execution → Daily Standups → Sprint Review → Retrospective → Repeat
|
||||
```
|
||||
|
||||
## Phase 1: Backlog Grooming
|
||||
|
||||
Prepare the backlog before sprint planning.
|
||||
|
||||
### Review and Prioritize Backlog
|
||||
|
||||
**View all backlog items:**
|
||||
```bash
|
||||
jira issue list --status "To Do" --plain
|
||||
```
|
||||
|
||||
**View by priority:**
|
||||
```bash
|
||||
jira issue list --status "To Do" --priority High,Critical --plain
|
||||
```
|
||||
|
||||
**View unestimated stories:**
|
||||
```bash
|
||||
jira issue list --status "To Do" --jql "\"Story Points\" IS EMPTY" --plain
|
||||
```
|
||||
|
||||
### Grooming Checklist
|
||||
|
||||
For each backlog item, ensure:
|
||||
|
||||
1. **Clear description** - Well-written user story or bug report
|
||||
```bash
|
||||
jira issue view PROJ-123 --plain
|
||||
```
|
||||
|
||||
2. **Acceptance criteria defined** - What "done" looks like
|
||||
```bash
|
||||
jira issue edit PROJ-123 --body "
|
||||
## Acceptance Criteria
|
||||
- [ ] User can login with email
|
||||
- [ ] Password validation in place
|
||||
- [ ] Error messages displayed
|
||||
"
|
||||
```
|
||||
|
||||
3. **Properly sized** - Story points estimated
|
||||
```bash
|
||||
jira issue edit PROJ-123 --custom story_points=5
|
||||
```
|
||||
|
||||
4. **Dependencies identified** - Link blocking/blocked issues
|
||||
```bash
|
||||
jira issue link PROJ-123 PROJ-100 "is blocked by"
|
||||
```
|
||||
|
||||
5. **Questions answered** - No unknowns
|
||||
```bash
|
||||
jira issue comment PROJ-123 "Clarified with product: should support OAuth and email/password"
|
||||
```
|
||||
|
||||
### Grooming Activities
|
||||
|
||||
**Break down large stories:**
|
||||
```bash
|
||||
# Create subtasks for large story
|
||||
jira issue create --type Subtask --parent PROJ-123 --summary "Create database schema"
|
||||
jira issue create --type Subtask --parent PROJ-123 --summary "Implement API endpoints"
|
||||
jira issue create --type Subtask --parent PROJ-123 --summary "Add UI components"
|
||||
```
|
||||
|
||||
**Add labels for organization:**
|
||||
```bash
|
||||
jira issue edit PROJ-123 --label frontend,high-priority
|
||||
```
|
||||
|
||||
**Update priority based on business value:**
|
||||
```bash
|
||||
jira issue edit PROJ-123 --priority High
|
||||
```
|
||||
|
||||
## Phase 2: Sprint Planning
|
||||
|
||||
Plan the upcoming sprint iteration.
|
||||
|
||||
### Pre-Planning: Check Current Sprint
|
||||
|
||||
**View active sprint:**
|
||||
```bash
|
||||
jira sprint list --state active --plain
|
||||
```
|
||||
|
||||
**Check sprint progress:**
|
||||
```bash
|
||||
jira sprint view <SPRINT_ID> --plain
|
||||
```
|
||||
|
||||
**Identify incomplete items (to carry over):**
|
||||
```bash
|
||||
jira issue list --status "In Progress,To Do" --plain
|
||||
```
|
||||
|
||||
### Sprint Planning Meeting
|
||||
|
||||
#### Step 1: Set Sprint Goal
|
||||
|
||||
Define the sprint objective (document outside Jira or in sprint description):
|
||||
- What is the primary goal?
|
||||
- What value will we deliver?
|
||||
- What will we demo?
|
||||
|
||||
#### Step 2: Review Team Capacity
|
||||
|
||||
Calculate available capacity:
|
||||
- Number of team members
|
||||
- Days in sprint
|
||||
- Planned time off
|
||||
- Other commitments
|
||||
|
||||
Example: 5 developers × 10 days × 6 hours = 300 story points capacity
|
||||
|
||||
#### Step 3: Select Sprint Backlog
|
||||
|
||||
**List candidate stories (prioritized backlog):**
|
||||
```bash
|
||||
jira issue list --status "To Do" --priority High,Medium --plain
|
||||
```
|
||||
|
||||
**View details for consideration:**
|
||||
```bash
|
||||
jira issue view PROJ-123 --plain
|
||||
```
|
||||
|
||||
**Add items to sprint:**
|
||||
```bash
|
||||
jira sprint add <SPRINT_ID> PROJ-123 PROJ-124 PROJ-125
|
||||
```
|
||||
|
||||
**Continue until capacity reached.**
|
||||
|
||||
#### Step 4: Assign Initial Ownership
|
||||
|
||||
**View sprint issues:**
|
||||
```bash
|
||||
jira sprint view <SPRINT_ID> --plain
|
||||
```
|
||||
|
||||
**Assign to team members:**
|
||||
```bash
|
||||
jira issue assign PROJ-123 developer1@example.com
|
||||
jira issue assign PROJ-124 developer2@example.com
|
||||
jira issue assign PROJ-125 @me
|
||||
```
|
||||
|
||||
#### Step 5: Verify Sprint Commitment
|
||||
|
||||
**Calculate total story points:**
|
||||
```bash
|
||||
# List all sprint issues with story points
|
||||
jira issue list --jql "sprint = <SPRINT_ID>" --raw
|
||||
```
|
||||
|
||||
Parse and sum story points to verify it matches capacity.
|
||||
|
||||
**Check for blockers:**
|
||||
```bash
|
||||
jira issue list --status Blocked --plain
|
||||
```
|
||||
|
||||
Resolve blockers before sprint starts.
|
||||
|
||||
### Sprint Planning Checklist
|
||||
|
||||
- [ ] Sprint goal defined and communicated
|
||||
- [ ] Team capacity calculated
|
||||
- [ ] Backlog items selected and added to sprint
|
||||
- [ ] Total story points ≤ team capacity
|
||||
- [ ] All items meet Definition of Ready
|
||||
- [ ] Initial assignments made
|
||||
- [ ] Dependencies identified and managed
|
||||
- [ ] No critical blockers
|
||||
- [ ] Team agrees on commitment
|
||||
|
||||
### Definition of Ready
|
||||
|
||||
Before adding to sprint, ensure:
|
||||
- [ ] User story clearly written
|
||||
- [ ] Acceptance criteria defined
|
||||
- [ ] Story pointed/estimated
|
||||
- [ ] Dependencies identified
|
||||
- [ ] Technical approach discussed
|
||||
- [ ] No major unknowns
|
||||
|
||||
## Phase 3: Sprint Execution
|
||||
|
||||
Day-to-day sprint activities.
|
||||
|
||||
### Daily Workflow
|
||||
|
||||
**Morning: Check your work:**
|
||||
```bash
|
||||
jira issue list --assignee @me --status "In Progress,To Do" --plain
|
||||
```
|
||||
|
||||
**Start working on item:**
|
||||
```bash
|
||||
jira issue move PROJ-123 "In Progress" --comment "Starting work on authentication"
|
||||
```
|
||||
|
||||
**Throughout day: Update progress:**
|
||||
```bash
|
||||
jira issue comment PROJ-123 "Implemented login form, working on validation"
|
||||
```
|
||||
|
||||
**End of day: Update status:**
|
||||
```bash
|
||||
jira issue comment PROJ-123 "Completed form validation, ready for API integration tomorrow"
|
||||
```
|
||||
|
||||
**When blocked:**
|
||||
```bash
|
||||
jira issue move PROJ-123 "Blocked" --comment "Waiting for API specification from backend team"
|
||||
jira issue link PROJ-123 PROJ-100 "is blocked by"
|
||||
```
|
||||
|
||||
### Sprint Monitoring
|
||||
|
||||
**Check sprint progress:**
|
||||
```bash
|
||||
jira sprint view <SPRINT_ID> --plain
|
||||
```
|
||||
|
||||
**Identify at-risk items:**
|
||||
```bash
|
||||
jira issue list --status "To Do" --priority High --plain
|
||||
```
|
||||
|
||||
**Find blocked issues:**
|
||||
```bash
|
||||
jira issue list --status Blocked --plain
|
||||
```
|
||||
|
||||
**Check unassigned work:**
|
||||
```bash
|
||||
jira issue list --assignee EMPTY --status "To Do" --plain
|
||||
```
|
||||
|
||||
### Mid-Sprint Adjustments
|
||||
|
||||
**Add urgent issues (if capacity allows):**
|
||||
```bash
|
||||
jira sprint add <SPRINT_ID> PROJ-130
|
||||
jira issue assign PROJ-130 @me
|
||||
jira issue move PROJ-130 "In Progress"
|
||||
```
|
||||
|
||||
**Remove items if overcommitted:**
|
||||
```bash
|
||||
# Remove from sprint (moves back to backlog)
|
||||
jira sprint remove <SPRINT_ID> PROJ-125
|
||||
```
|
||||
|
||||
## Phase 4: Daily Standup
|
||||
|
||||
Quick daily synchronization.
|
||||
|
||||
### Standup Report Generation
|
||||
|
||||
**My yesterday/today/blockers:**
|
||||
```bash
|
||||
# What I completed yesterday
|
||||
jira issue list --assignee @me --status Done --jql "updated >= -1d" --plain
|
||||
|
||||
# What I'm working on today
|
||||
jira issue list --assignee @me --status "In Progress" --plain
|
||||
|
||||
# My blockers
|
||||
jira issue list --assignee @me --status Blocked --plain
|
||||
```
|
||||
|
||||
### Team Status
|
||||
|
||||
**Overall sprint progress:**
|
||||
```bash
|
||||
jira sprint view <SPRINT_ID> --plain
|
||||
```
|
||||
|
||||
**Team workload:**
|
||||
```bash
|
||||
jira issue list --status "In Progress" --plain
|
||||
```
|
||||
|
||||
**Blockers across team:**
|
||||
```bash
|
||||
jira issue list --status Blocked --plain
|
||||
```
|
||||
|
||||
### Standup Best Practices
|
||||
|
||||
1. **Keep it brief** - 15 minutes max
|
||||
2. **Focus on progress** - What's done, what's next
|
||||
3. **Identify blockers** - Not problem-solving session
|
||||
4. **Update Jira before standup** - Issues reflect current state
|
||||
5. **Follow up separately** - Deep discussions after standup
|
||||
|
||||
## Phase 5: Sprint Review
|
||||
|
||||
Demonstrate completed work.
|
||||
|
||||
### Pre-Review Preparation
|
||||
|
||||
**Completed items for demo:**
|
||||
```bash
|
||||
jira issue list --status Done --jql "sprint = <SPRINT_ID>" --plain
|
||||
```
|
||||
|
||||
**Verify all done items meet Definition of Done:**
|
||||
```bash
|
||||
jira issue view PROJ-123 --plain
|
||||
```
|
||||
|
||||
Check:
|
||||
- Acceptance criteria met
|
||||
- Tested and working
|
||||
- Deployed (if applicable)
|
||||
- Documented
|
||||
|
||||
### Review Metrics
|
||||
|
||||
**Sprint completion rate:**
|
||||
```bash
|
||||
# Total issues in sprint
|
||||
jira issue list --jql "sprint = <SPRINT_ID>" --raw
|
||||
|
||||
# Completed issues
|
||||
jira issue list --jql "sprint = <SPRINT_ID> AND status = Done" --raw
|
||||
|
||||
# Calculate percentage
|
||||
```
|
||||
|
||||
**Story points completed:**
|
||||
```bash
|
||||
# Sum story points of completed issues
|
||||
jira issue list --jql "sprint = <SPRINT_ID> AND status = Done" --raw | grep storyPoints
|
||||
```
|
||||
|
||||
**Issue breakdown:**
|
||||
```bash
|
||||
# By type
|
||||
jira issue list --jql "sprint = <SPRINT_ID>" --plain | grep -c Story
|
||||
jira issue list --jql "sprint = <SPRINT_ID>" --plain | grep -c Bug
|
||||
jira issue list --jql "sprint = <SPRINT_ID>" --plain | grep -c Task
|
||||
```
|
||||
|
||||
### Incomplete Work
|
||||
|
||||
**Items not finished:**
|
||||
```bash
|
||||
jira issue list --jql "sprint = <SPRINT_ID> AND status != Done" --plain
|
||||
```
|
||||
|
||||
**Move to next sprint or backlog:**
|
||||
```bash
|
||||
# Move to next sprint
|
||||
jira sprint add <NEXT_SPRINT_ID> PROJ-125 PROJ-126
|
||||
|
||||
# Or move back to backlog
|
||||
jira issue edit PROJ-127 --status "To Do"
|
||||
```
|
||||
|
||||
### Review Artifacts
|
||||
|
||||
Document:
|
||||
- Sprint goal achievement (met/not met)
|
||||
- Velocity (story points completed)
|
||||
- Completed items
|
||||
- Demo feedback
|
||||
- Incomplete items and reasons
|
||||
|
||||
## Phase 6: Sprint Retrospective
|
||||
|
||||
Reflect and improve.
|
||||
|
||||
### Retrospective Data Gathering
|
||||
|
||||
**Sprint metrics:**
|
||||
```bash
|
||||
# All sprint issues
|
||||
jira issue list --jql "sprint = <SPRINT_ID>" --plain
|
||||
|
||||
# Completed work
|
||||
jira issue list --jql "sprint = <SPRINT_ID> AND status = Done" --plain
|
||||
|
||||
# Issues that were blocked
|
||||
jira issue list --jql "sprint = <SPRINT_ID> AND status was Blocked" --plain
|
||||
```
|
||||
|
||||
### Retrospective Topics
|
||||
|
||||
1. **What went well?**
|
||||
- High velocity
|
||||
- Good collaboration
|
||||
- Smooth deployments
|
||||
|
||||
2. **What could be improved?**
|
||||
- Too many blockers
|
||||
- Underestimated complexity
|
||||
- Scope creep
|
||||
|
||||
3. **Action items**
|
||||
- Create issues for improvements
|
||||
```bash
|
||||
jira issue create --type Task --summary "Improve estimation process" --label retrospective-action
|
||||
```
|
||||
|
||||
### Track Retrospective Actions
|
||||
|
||||
**Create improvement tasks:**
|
||||
```bash
|
||||
jira issue create \
|
||||
--type Task \
|
||||
--summary "Set up automated testing pipeline" \
|
||||
--label retrospective-action,process-improvement \
|
||||
--assignee teamlead@example.com
|
||||
```
|
||||
|
||||
**Review previous retrospective actions:**
|
||||
```bash
|
||||
jira issue list --label retrospective-action --status "To Do,In Progress" --plain
|
||||
```
|
||||
|
||||
## Sprint Metrics and Reporting
|
||||
|
||||
### Velocity Tracking
|
||||
|
||||
**Last 3 sprints velocity:**
|
||||
```bash
|
||||
# Sprint 1
|
||||
jira issue list --jql "sprint = <SPRINT_1> AND status = Done" --raw | grep storyPoints
|
||||
|
||||
# Sprint 2
|
||||
jira issue list --jql "sprint = <SPRINT_2> AND status = Done" --raw | grep storyPoints
|
||||
|
||||
# Sprint 3 (current)
|
||||
jira issue list --jql "sprint = <SPRINT_3> AND status = Done" --raw | grep storyPoints
|
||||
```
|
||||
|
||||
Calculate average for future planning.
|
||||
|
||||
### Burndown Tracking
|
||||
|
||||
**Remaining work over time:**
|
||||
```bash
|
||||
# At sprint start: Total story points
|
||||
# Daily: Remaining story points
|
||||
jira issue list --jql "sprint = <SPRINT_ID> AND status != Done" --raw | grep storyPoints
|
||||
```
|
||||
|
||||
Track daily to create burndown chart externally.
|
||||
|
||||
### Quality Metrics
|
||||
|
||||
**Bug rate:**
|
||||
```bash
|
||||
# Bugs in sprint
|
||||
jira issue list --jql "sprint = <SPRINT_ID> AND type = Bug" --raw
|
||||
|
||||
# Bugs found post-deployment
|
||||
jira issue list --jql "type = Bug AND created >= -14d AND labels = production" --raw
|
||||
```
|
||||
|
||||
**Rework rate:**
|
||||
```bash
|
||||
# Issues returned from review
|
||||
jira issue list --jql "status was 'In Review' AND status = 'In Progress'" --raw
|
||||
```
|
||||
|
||||
## Epic Management
|
||||
|
||||
Epics span multiple sprints.
|
||||
|
||||
### Creating Epic
|
||||
|
||||
```bash
|
||||
jira epic create --name "User Authentication System" --summary "Implement complete auth system"
|
||||
```
|
||||
|
||||
### Planning Epic Across Sprints
|
||||
|
||||
**View epic details:**
|
||||
```bash
|
||||
jira epic view PROJ-100 --plain
|
||||
```
|
||||
|
||||
**List all epic stories:**
|
||||
```bash
|
||||
jira issue list --jql "\"Epic Link\" = PROJ-100" --plain
|
||||
```
|
||||
|
||||
**Distribute across sprints:**
|
||||
```bash
|
||||
# Sprint 1: Foundation
|
||||
jira sprint add <SPRINT_1> PROJ-101 PROJ-102
|
||||
|
||||
# Sprint 2: Core features
|
||||
jira sprint add <SPRINT_2> PROJ-103 PROJ-104
|
||||
|
||||
# Sprint 3: Polish
|
||||
jira sprint add <SPRINT_3> PROJ-105 PROJ-106
|
||||
```
|
||||
|
||||
### Epic Progress Tracking
|
||||
|
||||
**Completion status:**
|
||||
```bash
|
||||
# Total issues in epic
|
||||
jira issue list --jql "\"Epic Link\" = PROJ-100" --raw
|
||||
|
||||
# Completed issues
|
||||
jira issue list --jql "\"Epic Link\" = PROJ-100 AND status = Done" --raw
|
||||
```
|
||||
|
||||
## Common Sprint Patterns
|
||||
|
||||
### Pattern 1: Standard Two-Week Sprint
|
||||
|
||||
```bash
|
||||
# Week 1 Monday: Sprint Planning
|
||||
jira sprint list --state future --plain # Get next sprint ID
|
||||
jira issue list --status "To Do" --priority High --plain # Review backlog
|
||||
jira sprint add <SPRINT_ID> PROJ-123 PROJ-124 PROJ-125 # Add to sprint
|
||||
jira issue assign PROJ-123 @me # Assign work
|
||||
|
||||
# Daily: Standups and updates
|
||||
jira issue list --assignee @me --status "In Progress" --plain
|
||||
|
||||
# Week 2 Friday: Sprint Review & Retrospective
|
||||
jira sprint view <SPRINT_ID> --plain # Review progress
|
||||
jira issue list --jql "sprint = <SPRINT_ID> AND status != Done" --plain # Incomplete items
|
||||
|
||||
# Move incomplete items
|
||||
jira sprint add <NEXT_SPRINT_ID> PROJ-126
|
||||
```
|
||||
|
||||
### Pattern 2: Continuous Flow (Kanban)
|
||||
|
||||
```bash
|
||||
# Regular backlog grooming
|
||||
jira issue list --status "To Do" --plain
|
||||
|
||||
# Pull work as capacity allows
|
||||
jira issue assign PROJ-123 @me
|
||||
jira issue move PROJ-123 "In Progress"
|
||||
|
||||
# Track WIP limits
|
||||
jira issue list --status "In Progress" --plain
|
||||
```
|
||||
|
||||
### Pattern 3: Rapid Iteration (One-Week Sprints)
|
||||
|
||||
```bash
|
||||
# Monday: Quick planning
|
||||
jira sprint add <SPRINT_ID> PROJ-123 PROJ-124 PROJ-125
|
||||
|
||||
# Tuesday-Thursday: Execute
|
||||
jira issue move PROJ-123 "In Progress"
|
||||
# ... work ...
|
||||
jira issue move PROJ-123 "Done"
|
||||
|
||||
# Friday: Review and retro (combined)
|
||||
jira sprint view <SPRINT_ID> --plain
|
||||
```
|
||||
|
||||
## Automation and Scripts
|
||||
|
||||
### Sprint Start Script
|
||||
|
||||
```bash
|
||||
#!/bin/bash
|
||||
# sprint-start.sh
|
||||
|
||||
SPRINT_ID=$1
|
||||
|
||||
echo "Starting Sprint $SPRINT_ID"
|
||||
|
||||
# List sprint contents
|
||||
echo "Sprint Backlog:"
|
||||
jira sprint view "$SPRINT_ID" --plain
|
||||
|
||||
# Check for blockers
|
||||
echo -e "\nChecking for blockers:"
|
||||
jira issue list --status Blocked --plain
|
||||
|
||||
# Team assignments
|
||||
echo -e "\nTeam Workload:"
|
||||
jira issue list --jql "sprint = $SPRINT_ID" --plain
|
||||
```
|
||||
|
||||
### Daily Status Script
|
||||
|
||||
```bash
|
||||
#!/bin/bash
|
||||
# daily-status.sh
|
||||
|
||||
echo "===== My Work ====="
|
||||
echo "In Progress:"
|
||||
jira issue list --assignee @me --status "In Progress" --plain
|
||||
|
||||
echo -e "\nTo Do:"
|
||||
jira issue list --assignee @me --status "To Do" --plain
|
||||
|
||||
echo -e "\nBlocked:"
|
||||
jira issue list --assignee @me --status Blocked --plain
|
||||
|
||||
echo -e "\n===== Sprint Progress ====="
|
||||
jira sprint view <SPRINT_ID> --plain
|
||||
```
|
||||
|
||||
### Sprint End Script
|
||||
|
||||
```bash
|
||||
#!/bin/bash
|
||||
# sprint-end.sh
|
||||
|
||||
SPRINT_ID=$1
|
||||
NEXT_SPRINT_ID=$2
|
||||
|
||||
echo "Completing Sprint $SPRINT_ID"
|
||||
|
||||
# Completed items
|
||||
echo "Completed Issues:"
|
||||
jira issue list --jql "sprint = $SPRINT_ID AND status = Done" --plain
|
||||
|
||||
# Incomplete items
|
||||
echo -e "\nIncomplete Issues:"
|
||||
INCOMPLETE=$(jira issue list --jql "sprint = $SPRINT_ID AND status != Done" --raw)
|
||||
echo "$INCOMPLETE"
|
||||
|
||||
# Move incomplete to next sprint
|
||||
echo -e "\nMoving incomplete items to Sprint $NEXT_SPRINT_ID"
|
||||
# Extract issue keys and move (requires jq)
|
||||
echo "$INCOMPLETE" | jq -r '.issues[].key' | while read issue; do
|
||||
jira sprint add "$NEXT_SPRINT_ID" "$issue"
|
||||
done
|
||||
```
|
||||
|
||||
## Best Practices
|
||||
|
||||
### Sprint Planning
|
||||
|
||||
1. **Don't overcommit** - Use 80% of capacity
|
||||
2. **Balance work types** - Mix of features, bugs, tech debt
|
||||
3. **Consider dependencies** - Don't block yourself
|
||||
4. **Include buffer** - Time for unexpected issues
|
||||
5. **Get team buy-in** - Everyone agrees on commitment
|
||||
|
||||
### Sprint Execution
|
||||
|
||||
1. **Update Jira daily** - Keep status current
|
||||
2. **Communicate blockers** - Immediately when stuck
|
||||
3. **Focus on sprint goal** - Avoid scope creep
|
||||
4. **Swarm on blockers** - Help unblock teammates
|
||||
5. **Demo early and often** - Get feedback during sprint
|
||||
|
||||
### Sprint Ceremonies
|
||||
|
||||
1. **Time-box meetings** - Respect team's time
|
||||
2. **Come prepared** - Review work before meetings
|
||||
3. **Stay focused** - Avoid rabbit holes
|
||||
4. **Document decisions** - Record in Jira or wiki
|
||||
5. **Action all items** - Every decision becomes a task
|
||||
|
||||
## Definition of Done
|
||||
|
||||
### Story Level
|
||||
|
||||
- [ ] Code complete and reviewed
|
||||
- [ ] Unit tests written and passing
|
||||
- [ ] Integration tests passing
|
||||
- [ ] Documentation updated
|
||||
- [ ] Deployed to staging
|
||||
- [ ] QA approved
|
||||
- [ ] Acceptance criteria met
|
||||
|
||||
### Sprint Level
|
||||
|
||||
- [ ] Sprint goal achieved
|
||||
- [ ] All committed stories done
|
||||
- [ ] Demo completed
|
||||
- [ ] Stakeholder feedback gathered
|
||||
- [ ] Retrospective conducted
|
||||
- [ ] Velocity recorded
|
||||
- [ ] Next sprint planned
|
||||
|
||||
## Troubleshooting
|
||||
|
||||
**Sprint not showing:**
|
||||
- Check board configuration
|
||||
- Verify sprint is created for correct board
|
||||
- Ensure you have permissions
|
||||
|
||||
**Can't add issues to sprint:**
|
||||
- Check if issue is in correct project
|
||||
- Verify issue isn't in another sprint
|
||||
- Ensure sprint isn't closed
|
||||
|
||||
**Sprint metrics incorrect:**
|
||||
- Verify story points field is configured
|
||||
- Check custom field names
|
||||
- May need admin to configure
|
||||
|
||||
**Team velocity varies wildly:**
|
||||
- Review estimation process
|
||||
- Check for consistent team composition
|
||||
- Consider external factors (holidays, etc.)
|
||||
|
||||
## Next Steps
|
||||
|
||||
- Use `jira-query-builder` agent for advanced sprint queries
|
||||
- Set up automation scripts for common tasks
|
||||
- Create dashboards for sprint metrics
|
||||
- Integrate with CI/CD for automated updates
|
||||
- Establish team norms and Definition of Done
|
||||