Files
gh-xloxn69-agileflow/skills/deployment-guide-generator/SKILL.md
2025-11-30 09:07:10 +08:00

1.9 KiB

deployment-guide-generator

Generate deployment guides with rollback procedures.

Activation Keywords

  • "deployment", "release guide", "deploy steps", "deployment procedure"

When to Use

  • Preparing to deploy a feature
  • Creating release runbook
  • Documenting deployment steps

What This Does

Generates deployment guide including:

  • Pre-deployment checklist (tests passing, staging verified)
  • Deployment steps (database migrations, code deployment)
  • Verification steps (health checks, smoke tests)
  • Rollback procedure (how to revert if issues)
  • Post-deployment monitoring (watch metrics/logs)
  • Communication plan (who to notify)
  • Estimated timeline

References agileflow-monitoring for setup and rollback procedures.

Output

Ready-to-follow deployment guide

Example Activation

User: "Create deployment guide for user login feature" Skill: Generates:

## Deployment Guide: User Login Feature (v2.18.0)

### Pre-Deployment Checklist
- [ ] All tests passing (npm test)
- [ ] Staging environment verified
- [ ] Database backup taken
- [ ] Monitoring alerts configured
- [ ] Team notified

### Deployment Steps
1. Run database migrations
   \`\`\`bash
   npm run migrate:up
   \`\`\`

2. Deploy new code
   \`\`\`bash
   git push production main
   \`\`\`

3. Verify deployment
   - Check /health endpoint returns 200
   - Verify JWT tokens working
   - Check rate limiting active

### Monitoring (Watch these metrics)
- Login success rate (target: >95%)
- Login latency (target: <200ms p95)
- Error rate (alert if >1%)
- Rate limiting hits (expected: <5%)

### Rollback Procedure (if issues)
1. Revert database migrations:
   \`\`\`bash
   npm run migrate:down
   \`\`\`

2. Revert code:
   \`\`\`bash
   git revert <commit-hash>
   git push production main
   \`\`\`

3. Verify rollback successful

**Estimated Timeline**: 15 minutes (10 min deploy + 5 min verify)
**Rollback Time**: 10 minutes