Tasklist Document Specification

Specification for creating conformant tasklist documents in CWF.


What is a Tasklist Document?

Tasklist documents provide step-by-step execution guidance. They break features into phases and concrete, actionable tasks that implementers execute sequentially.

Plan = WHY/WHAT | Tasklist = WHEN/HOW


Conformance

The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT", "SHOULD", "SHOULD NOT", "RECOMMENDED", "MAY", and "OPTIONAL" in this document are to be interpreted as described in RFC 2119.

Note: See SKILL.md for conformance levels (1-3) tailoring documentation depth.


Task Syntax

Every task in the tasklist MUST follow this markdown format:

- [ ] [PX.Y] Task description with file/component specifics

Task ID Format: [PX.Y] where P = "Phase", X = phase number, Y = task number within phase

Requirements:

  • Tasks MUST use checkboxes: - [ ] for incomplete, - [x] for completed
  • Task numbering MUST start at 1 within each phase
  • Numbering MUST be sequential within phases (no gaps)
  • Task IDs MUST NOT be reused or skipped
  • Tasks MUST NOT use markdown headings (###)
  • Descriptions MUST specify the file or component being modified
  • Tasks MAY provide task-critical information in bulletpoints

Example (Informative):

- [x] [P1.1] Create query/ directory and __init__.py
- [x] [P1.2] Create QueryModel class with Pydantic in models.py
- [ ] [P1.3] Add validation to QueryModel (required fields, type checks)
- [ ] [P1.4] Write unit tests for QueryModel validation in test_models.py

Phase Structure

Every phase MUST follow this standard structure:

## Phase X: Descriptive Name

**Goal:** One-sentence description of what this phase accomplishes

**Deliverable:** Concrete outcome (e.g., "Working data models with validation passing tests")

**Tasks:**
- [ ] [PX.1] Specific atomic action - file/component detail
- [ ] [PX.2] Another specific action with clear scope
- [ ] [PX.3] Write tests for implemented functionality
- [ ] [PX.4] Run tests: pytest tests/module/

**Checkpoints:**
- [ ] Code quality: Run `ruff check src/`
- [ ] Code complexity: Run `ruff check src/ --select C901`
- [ ] Review: Self review implementation and verify phase deliverable achieved

**Phase X Complete:** Brief description of system state after phase completion

Checkpoint Requirements

Checkpoints are end-of-phase validation operations performed after all tasks in a phase are complete.

Requirements:

  • Checkpoints MUST use checkbox format: - [ ] Checkpoint description
  • Additional checkpoints SHOULD be project-specific validation or quality operations
  • Checkpoints MUST NOT duplicate functional test tasks (tests belong in Tasks section)
  • Checkpoint commands SHOULD be concrete and executable (e.g., ruff check src/)

Common Checkpoint Types:

  • Self-review: Agent reviews implementation against deliverable
  • Code quality: Linting, formatting, type checking (e.g., ruff, black, mypy)
  • Code complexity: Complexity analysis (e.g., radon cc)

Note (Informative): Use only tools your project already has. Checkpoints provide quality control for AI-driven development.


Task Granularity Guidelines

Tasks SHOULD meet these quality criteria:

  • Time: 5-20 minutes to complete
  • Atomic: Completable in one go without interruption (single logical change)
  • Testable: Clear done criteria (observable output or verifiable behavior)
  • File-specific: Reference concrete files or components

Example (Informative):

- [P1.1] Create query/ directory and __init__.py
- [P1.2] Create QueryModel class with Pydantic in models.py
- [P1.3] Add field validation to QueryModel (required fields, type checks)
- [P1.4] Write unit tests for QueryModel validation in test_models.py

Task Ordering Principles

Tasks that depend on others MUST be ordered after their dependencies.

Example (Informative):

- [ ] [P2.1] Create ranker.py with RankerClass stub
- [ ] [P2.2] Implement TF-IDF scoring in RankerClass.score()
- [ ] [P2.3] Add document ranking in RankerClass.rank()
- [ ] [P2.4] Write unit tests for TF-IDF scoring in test_ranker.py
- [ ] [P2.5] Write unit tests for document ranking in test_ranker.py
- [ ] [P2.6] Verify all tests pass: pytest tests/query/test_ranker.py

Phase Complete Statement

Every phase MUST end with a "Phase X Complete" statement describing system state after phase completion.

The statement SHOULD be 1-3 sentences describing what capabilities now exist, what's ready for the next phase, and what validation has been completed.

Example (Informative):

  • "Core data models validated, ready for parser implementation"
  • "Query parser complete with DSL support, validated against test cases"
  • "End-to-end query flow working with TF-IDF ranking, ready for optimization"

Validation

Tasklists are conformant when they:

  • Include required elements in every phase (Goal, Deliverable, Tasks, Checkpoints, Phase Complete)
  • Use correct task ID format [PX.Y] with checkboxes
  • Specify concrete files/components in task descriptions
  • Order tasks after their dependencies
  • Use checkpoints for quality/validation (not functional tests)
  • Contain no architectural rationale or design alternatives (belongs in plan)