# Orchestrator
|
|
|
|
Split complex tasks into sequential steps, where each step can contain multiple parallel subtasks.
|
|
|
|
## Process
|
|
|
|
1. **Initial Analysis**
|
|
|
|
- First, analyze the entire task to understand scope and requirements
|
|
- Identify dependencies and execution order
|
|
- Plan sequential steps based on dependencies
|
|
|
|
2. **Step Planning**
|
|
|
|
- Break down into 2-4 sequential steps
|
|
- Each step can contain multiple parallel subtasks
|
|
- Define what context from previous steps is needed
|
|
|
|
3. **Step-by-Step Execution**
|
|
|
|
- Execute all subtasks within a step in parallel
|
|
- Wait for all subtasks in current step to complete
|
|
- Pass relevant results to next step
|
|
- Request concise summaries (100-200 words) from each subtask
|
|
|
|
4. **Step Review and Adaptation**
|
|
|
|
- After each step completion, review results
|
|
- Validate if remaining steps are still appropriate
|
|
- Adjust next steps based on discoveries
|
|
- Add, remove, or modify subtasks as needed
|
|
|
|
5. **Progressive Aggregation**
|
|
- Synthesize results from completed step
|
|
- Use synthesized results as context for next step
|
|
- Build comprehensive understanding progressively
|
|
- Maintain flexibility to adapt plan
|
|
|
|
## Example Usage
|
|
|
|
When given "analyze test lint and commit":
|
|
|
|
**Step 1: Initial Analysis** (1 subtask)
|
|
|
|
- Analyze project structure to understand test/lint setup
|
|
|
|
**Step 2: Quality Checks** (parallel subtasks)
|
|
|
|
- Run tests and capture results
|
|
- Run linting and type checking
|
|
- Check git status and changes
|
|
|
|
**Step 3: Fix Issues** (parallel subtasks, using Step 2 results)
|
|
|
|
- Fix linting errors found in Step 2
|
|
- Fix type errors found in Step 2
|
|
- Prepare commit message based on changes
|
|
_Review: If no errors found in Step 2, skip fixes and proceed to commit_
|
|
|
|
**Step 4: Final Validation** (parallel subtasks)
|
|
|
|
- Re-run tests to ensure fixes work
|
|
- Re-run lint to verify all issues resolved
|
|
- Create commit with verified changes
|
|
_Review: If Step 3 had no fixes, simplify to just creating commit_
|
|
|
|
## Key Benefits
|
|
|
|
- **Sequential Logic**: Steps execute in order, allowing later steps to use earlier results
|
|
- **Parallel Efficiency**: Within each step, independent tasks run simultaneously
|
|
- **Memory Optimization**: Each subtask gets minimal context, preventing overflow
|
|
- **Progressive Understanding**: Build knowledge incrementally across steps
|
|
- **Clear Dependencies**: Explicit flow from analysis → execution → validation
|
|
|
|
## Implementation Notes
|
|
|
|
- Always start with a single analysis task to understand the full scope
|
|
- Group related parallel tasks within the same step
|
|
- Pass only essential findings between steps (summaries, not full output)
|
|
- Use TodoWrite to track both steps and subtasks for visibility
|
|
- After each step, explicitly reconsider the plan:
|
|
- Are the next steps still relevant?
|
|
- Did we discover something that requires new tasks?
|
|
- Can we skip or simplify upcoming steps?
|
|
- Should we add new validation steps?
|
|
|
|
## Adaptive Planning Example
|
|
|
|
```
|
|
Initial Plan: Step 1 → Step 2 → Step 3 → Step 4
|
|
|
|
After Step 2: "No errors found in tests or linting"
|
|
Adapted Plan: Step 1 → Step 2 → Skip Step 3 → Simplified Step 4 (just commit)
|
|
|
|
After Step 2: "Found critical architectural issue"
|
|
Adapted Plan: Step 1 → Step 2 → New Step 2.5 (analyze architecture) → Modified Step 3
|
|
```
|