description: Deploy network configuration end-to-end
|
|
argument-hint: Optional deployment requirements
|
|
---
|
|
|
|
You are orchestrating a comprehensive network deployment workflow using a structured multi-phase approach to ensure safe, validated, and reversible network changes.
|
|
|
|
## Workflow Steps
|
|
|
|
### 1. Gather Deployment Requirements
|
|
|
|
If the user provides deployment details, use those directly. Otherwise, ask the user for:
|
|
|
|
**Target Environment:**
|
|
- Deployment environment (production, staging, development, lab)
|
|
- Target systems and platforms (FRR, SONiC, Debian/Ubuntu, etc.)
|
|
- Number of devices affected
|
|
- Network criticality level (mission-critical, business-critical, standard)
|
|
|
|
**Configuration Requirements:**
|
|
- What configurations to deploy (interfaces, routing, VLANs, etc.)
|
|
- Configuration files or requirements (if not already generated)
|
|
- Dependencies between configurations
|
|
- Order of operations
|
|
|
|
**Change Window:**
|
|
- Scheduled maintenance window (date, time, duration)
|
|
- Maximum acceptable downtime
|
|
- Business impact of downtime
|
|
- Peak vs off-peak considerations
|
|
|
|
**Rollback Requirements:**
|
|
- Rollback criteria (what conditions trigger rollback)
|
|
- Maximum time before rollback decision
|
|
- Rollback testing requirements
|
|
- Configuration backup retention
|
|
|
|
**Testing and Validation:**
|
|
- Pre-deployment tests
|
|
- Post-deployment validation criteria
|
|
- Automated vs manual testing
|
|
- Acceptance criteria
|
|
|
|
**Communication and Coordination:**
|
|
- Stakeholders to notify
|
|
- Change control approval
|
|
- Team coordination needs
|
|
- Communication channels (Slack, email, phone)
|
|
|
|
### 2. Launch network-orchestrator for Deployment Planning
|
|
|
|
Use the Task tool to launch the network-orchestrator agent with comprehensive deployment requirements:
|
|
|
|
```
|
|
Orchestrate a network deployment with the following requirements:
|
|
|
|
Environment: [production/staging/lab]
|
|
Criticality: [mission-critical/business-critical/standard]
|
|
Target Systems: [list of devices/platforms]
|
|
|
|
Deployment Requirements:
|
|
[Detailed configuration requirements or existing config files]
|
|
|
|
Change Window:
|
|
- Start: [date/time]
|
|
- Duration: [hours]
|
|
- Max Downtime: [minutes]
|
|
|
|
Please coordinate a complete deployment workflow including:
|
|
|
|
1. Pre-Deployment Phase
|
|
- Configuration generation (if needed)
|
|
- Configuration review (architecture)
|
|
- Security review (for production)
|
|
- Change approval process
|
|
- Team preparation and briefing
|
|
|
|
2. Deployment Preparation
|
|
- Backup current configurations
|
|
- Prepare rollback procedures
|
|
- Stage configuration files
|
|
- Verify access to all devices
|
|
- Test connectivity to management interfaces
|
|
|
|
3. Deployment Execution
|
|
- Pre-deployment validation
|
|
- Phased deployment procedure
|
|
- Step-by-step deployment commands
|
|
- Checkpoints between phases
|
|
- Progress monitoring
|
|
|
|
4. Post-Deployment Validation
|
|
- Connectivity tests
|
|
- Routing validation
|
|
- Service validation
|
|
- Performance verification
|
|
- Comprehensive validation commands
|
|
|
|
5. Rollback Procedures
|
|
- Rollback triggers
|
|
- Rollback execution steps
|
|
- Rollback validation
|
|
- Emergency procedures
|
|
|
|
6. Documentation
|
|
- Deployment checklist
|
|
- As-built documentation
|
|
- Lessons learned
|
|
- Change log update
|
|
```
|
|
|
|
### 3. Execute Pre-Deployment Phase
|
|
|
|
Work through pre-deployment requirements:
|
|
|
|
**Configuration Generation (if needed):**
|
|
- Use appropriate specialist agents (frr-config-generator, netplan-config-generator, etc.)
|
|
- Generate all required configuration files
|
|
- Validate syntax of all configurations
|
|
|
|
**Configuration Review:**
|
|
- Use network-architecture-reviewer agent for technical review
|
|
- Identify and fix any configuration errors
|
|
- Verify IP addressing, routing logic, redundancy
|
|
|
|
**Security Review (Production Only):**
|
|
- Use network-security-reviewer agent for NIST-based review
|
|
- Address critical and high security findings
|
|
- Document accepted risks
|
|
|
|
**Change Approval:**
|
|
- Submit change request to CAB (Change Advisory Board)
|
|
- Document change rationale and impact
|
|
- Obtain necessary approvals
|
|
- Communicate change window to stakeholders
|
|
|
|
### 4. Prepare Deployment Environment
|
|
|
|
Execute preparation steps:
|
|
|
|
**Backup Current State:**
|
|
```bash
|
|
# For each device, backup current configuration
|
|
sudo cp /etc/frr/frr.conf /etc/frr/frr.conf.backup.$(date +%Y%m%d_%H%M%S)
|
|
sudo cp /etc/network/interfaces /etc/network/interfaces.backup.$(date +%Y%m%d_%H%M%S)
|
|
sudo cp /etc/netplan/*.yaml /etc/netplan/backup/
|
|
sudo cp /etc/sonic/config_db.json /etc/sonic/config_db.json.backup.$(date +%Y%m%d_%H%M%S)
|
|
|
|
# Document current state
|
|
ip addr show > ~/pre-deploy-state-$(date +%Y%m%d_%H%M%S).txt
|
|
ip route show >> ~/pre-deploy-state-$(date +%Y%m%d_%H%M%S).txt
|
|
show running-config >> ~/pre-deploy-state-$(date +%Y%m%d_%H%M%S).txt
|
|
```
|
|
|
|
**Stage Configuration Files:**
|
|
```bash
|
|
# Copy configs to staging directory
|
|
sudo mkdir -p /opt/network-configs/deploy-$(date +%Y%m%d)
|
|
sudo cp new-configs/* /opt/network-configs/deploy-$(date +%Y%m%d)/
|
|
|
|
# Verify file integrity
|
|
md5sum /opt/network-configs/deploy-$(date +%Y%m%d)/* > checksums.txt
|
|
```
|
|
|
|
**Verify Management Access:**
|
|
```bash
|
|
# Test SSH access to all devices
|
|
for device in device1 device2 device3; do
|
|
echo "Testing $device..."
|
|
ssh -o ConnectTimeout=5 admin@$device "hostname"
|
|
done
|
|
|
|
# Verify console access availability
|
|
# Ensure KVM/IPMI/console server access working
|
|
```
|
|
|
|
**Team Coordination:**
|
|
- Assemble deployment team
|
|
- Brief on deployment plan
|
|
- Assign roles (deployment lead, validator, rollback coordinator)
|
|
- Test communication channels
|
|
- Establish escalation procedures
|
|
|
|
### 5. Execute Pre-Deployment Validation
|
|
|
|
Run pre-deployment checks:
|
|
|
|
**Network Health Check:**
|
|
```bash
|
|
# Check current connectivity
|
|
ping -c 4 <critical-destinations>
|
|
|
|
# Verify routing
|
|
show ip route | include "0.0.0.0/0"
|
|
show ip bgp summary
|
|
show ip ospf neighbor
|
|
|
|
# Check interface status
|
|
show interfaces status
|
|
ip addr show
|
|
|
|
# Verify no existing issues
|
|
show logging | tail -100
|
|
```
|
|
|
|
**Dependency Verification:**
|
|
```bash
|
|
# Check required packages installed
|
|
dpkg -l | grep -E "frr|netplan|vlan|bridge-utils"
|
|
|
|
# Verify kernel modules loaded
|
|
lsmod | grep -E "8021q|bonding"
|
|
|
|
# Check disk space
|
|
df -h /etc
|
|
|
|
# Verify NTP synchronized
|
|
timedatectl status
|
|
```
|
|
|
|
**Go/No-Go Decision:**
|
|
- Review all pre-deployment checks
|
|
- Confirm team readiness
|
|
- Verify change window
|
|
- Get final approval to proceed
|
|
- Document decision
|
|
|
|
### 6. Execute Phased Deployment
|
|
|
|
Deploy configurations in phases with validation between each phase:
|
|
|
|
**Phase 1: Non-Disruptive Changes**
|
|
```bash
|
|
# Deploy configurations that won't cause outages
|
|
# Examples: interface descriptions, logging, monitoring
|
|
|
|
# Apply changes
|
|
# Validate changes
|
|
# Checkpoint - if issues, rollback this phase
|
|
```
|
|
|
|
**Phase 2: Core Infrastructure**
|
|
```bash
|
|
# Deploy core routing changes
|
|
# Configure BGP/OSPF/IS-IS
|
|
# Update route policies
|
|
|
|
# Apply changes in controlled sequence
|
|
# Validate routing convergence
|
|
# Monitor for issues
|
|
# Checkpoint - continue or rollback
|
|
```
|
|
|
|
**Phase 3: Access Layer**
|
|
```bash
|
|
# Deploy access layer changes
|
|
# Configure VLANs, interfaces, ACLs
|
|
|
|
# Apply changes
|
|
# Validate connectivity
|
|
# Test user/server access
|
|
# Checkpoint - continue or rollback
|
|
```
|
|
|
|
**Phase 4: Final Services**
|
|
```bash
|
|
# Deploy remaining services
|
|
# QoS, monitoring, final optimizations
|
|
|
|
# Apply changes
|
|
# Full validation
|
|
# Final checkpoint
|
|
```
|
|
|
|
### 7. Execute Post-Deployment Validation
|
|
|
|
Comprehensive validation after deployment:
|
|
|
|
**Connectivity Validation:**
|
|
```bash
|
|
# Test basic connectivity
|
|
ping -c 10 <gateway>
|
|
ping -c 10 <critical-server>
|
|
ping -c 10 8.8.8.8
|
|
|
|
# Test from multiple sources
|
|
# Verify bidirectional connectivity
|
|
```
|
|
|
|
**Routing Validation:**
|
|
```bash
|
|
# Verify routing protocols
|
|
show ip bgp summary
|
|
show ip bgp neighbors
|
|
show ip ospf neighbor
|
|
show isis neighbor
|
|
|
|
# Check routing tables
|
|
show ip route
|
|
show ip route bgp
|
|
show ip route ospf
|
|
|
|
# Verify route advertisement/receipt
|
|
show ip bgp neighbors <peer> advertised-routes
|
|
show ip bgp neighbors <peer> routes
|
|
```
|
|
|
|
**Interface Validation:**
|
|
```bash
|
|
# Check all interfaces up
|
|
show interfaces status
|
|
ip link show | grep "state UP"
|
|
|
|
# Verify no errors
|
|
show interfaces counters errors
|
|
ip -s link show
|
|
|
|
# Check port channels/bonds
|
|
show interfaces portchannel
|
|
cat /proc/net/bonding/bond0
|
|
```
|
|
|
|
**Service Validation:**
|
|
```bash
|
|
# Test critical services
|
|
curl -I http://<web-service>
|
|
nc -zv <database-server> 5432
|
|
ssh <jump-host> "uptime"
|
|
|
|
# Verify DNS
|
|
nslookup <critical-hostname>
|
|
|
|
# Check monitoring
|
|
# Verify metrics collection
|
|
# Confirm alerts functioning
|
|
```
|
|
|
|
**Performance Validation:**
|
|
```bash
|
|
# Check latency
|
|
ping -c 100 <destination> | tail -1
|
|
|
|
# Measure throughput (if applicable)
|
|
iperf3 -c <test-server>
|
|
|
|
# Verify no packet loss
|
|
ping -c 1000 <destination> | grep "packet loss"
|
|
```
|
|
|
|
**Application Testing:**
|
|
- Test critical business applications
|
|
- Verify user access
|
|
- Check server connectivity
|
|
- Validate service dependencies
|
|
|
|
### 8. Complete Deployment or Execute Rollback
|
|
|
|
Based on validation results:
|
|
|
|
**If Successful:**
|
|
```bash
|
|
# Document successful deployment
|
|
# Update as-built documentation
|
|
# Update network diagrams
|
|
# Update IPAM/inventory
|
|
# Notify stakeholders of completion
|
|
# Close change ticket
|
|
# Schedule post-implementation review
|
|
```
|
|
|
|
**If Rollback Needed:**
|
|
```bash
|
|
# Execute rollback procedures
|
|
sudo cp /etc/frr/frr.conf.backup.YYYYMMDD_HHMMSS /etc/frr/frr.conf
|
|
sudo systemctl restart frr
|
|
|
|
sudo cp /etc/network/interfaces.backup.YYYYMMDD_HHMMSS /etc/network/interfaces
|
|
sudo systemctl restart networking
|
|
|
|
sudo cp /etc/netplan/backup/*.yaml /etc/netplan/
|
|
sudo netplan apply
|
|
|
|
sudo cp /etc/sonic/config_db.json.backup.YYYYMMDD_HHMMSS /etc/sonic/config_db.json
|
|
config reload -y
|
|
|
|
# Validate rollback successful
|
|
# Same validation steps as post-deployment
|
|
|
|
# Document rollback reason
|
|
# Schedule root cause analysis
|
|
# Plan remediation
|
|
```
|
|
|
|
## Deployment Best Practices
|
|
|
|
### Change Management
|
|
|
|
1. **Follow Change Control Process**
|
|
- Submit RFC (Request for Change)
|
|
- Get CAB approval for production
|
|
- Communicate to stakeholders
|
|
- Document all changes
|
|
|
|
2. **Use Maintenance Windows**
|
|
- Schedule during low-traffic periods
|
|
- Allow sufficient time
|
|
- Have extended window for complex changes
|
|
- Plan for overrun scenarios
|
|
|
|
3. **Phased Deployment**
|
|
- Deploy in logical phases
|
|
- Validate between phases
|
|
- Checkpoints for go/no-go decisions
|
|
- Ability to rollback individual phases
|
|
|
|
4. **Test First**
|
|
- Test in lab environment
|
|
- Staging environment validation
|
|
- Pilot deployment (subset of devices)
|
|
- Then full production
|
|
|
|
### Risk Mitigation
|
|
|
|
1. **Have Backups**
|
|
- Configuration backups
|
|
- Full system backups where applicable
|
|
- Test restore procedures
|
|
- Off-site backup copies
|
|
|
|
2. **Rollback Plan**
|
|
- Documented rollback procedures
|
|
- Tested rollback process
|
|
- Clear rollback criteria
|
|
- Rollback time estimates
|
|
|
|
3. **Team Coordination**
|
|
- Dedicated deployment team
|
|
- Clear roles and responsibilities
|
|
- Communication plan
|
|
- Escalation procedures
|
|
|
|
4. **Monitoring**
|
|
- Enhanced monitoring during deployment
|
|
- Real-time alerting
|
|
- Performance baselines
|
|
- Anomaly detection
|
|
|
|
### Communication
|
|
|
|
1. **Pre-Deployment**
|
|
- Notify stakeholders of change window
|
|
- Communicate expected impact
|
|
- Provide contact information
|
|
- Set expectations
|
|
|
|
2. **During Deployment**
|
|
- Regular status updates
|
|
- Immediate notification of issues
|
|
- Progress against timeline
|
|
- Any deviations from plan
|
|
|
|
3. **Post-Deployment**
|
|
- Completion notification
|
|
- Summary of changes
|
|
- Any issues encountered
|
|
- Next steps if applicable
|
|
|
|
## Deployment Checklist
|
|
|
|
### Pre-Deployment
|
|
- [ ] Configuration files generated and reviewed
|
|
- [ ] Architecture review completed
|
|
- [ ] Security review completed (production)
|
|
- [ ] Change approval obtained
|
|
- [ ] Team briefed and assigned roles
|
|
- [ ] Backups completed and verified
|
|
- [ ] Rollback procedures documented
|
|
- [ ] Management access verified
|
|
- [ ] Staging environment tested
|
|
- [ ] Communication sent to stakeholders
|
|
|
|
### During Deployment
|
|
- [ ] Pre-deployment validation passed
|
|
- [ ] Phase 1 deployed and validated
|
|
- [ ] Phase 2 deployed and validated
|
|
- [ ] Phase 3 deployed and validated
|
|
- [ ] Final phase deployed and validated
|
|
- [ ] All checkpoints passed
|
|
- [ ] No unexpected issues
|
|
- [ ] Timeline on track
|
|
|
|
### Post-Deployment
|
|
- [ ] All connectivity tests passed
|
|
- [ ] Routing validated
|
|
- [ ] Services operational
|
|
- [ ] Performance acceptable
|
|
- [ ] No errors in logs
|
|
- [ ] Monitoring functioning
|
|
- [ ] Applications tested
|
|
- [ ] Stakeholders notified
|
|
- [ ] Documentation updated
|
|
- [ ] Change ticket closed
|
|
|
|
## Deployment Scenarios
|
|
|
|
### Low-Risk Deployment
|
|
- Lab or development environment
|
|
- Non-critical systems
|
|
- Well-tested configurations
|
|
- Easy rollback
|
|
|
|
**Simplified Process:**
|
|
1. Generate configurations
|
|
2. Quick review
|
|
3. Backup current state
|
|
4. Deploy
|
|
5. Validate
|
|
6. Done
|
|
|
|
### Medium-Risk Deployment
|
|
- Staging or pre-production
|
|
- Business-critical (not mission-critical)
|
|
- Tested configurations
|
|
- Documented rollback
|
|
|
|
**Standard Process:**
|
|
1. Generate and review configurations
|
|
2. Change approval (simplified)
|
|
3. Backup and prepare
|
|
4. Phased deployment with validation
|
|
5. Full validation
|
|
6. Document
|
|
|
|
### High-Risk Deployment
|
|
- Production environment
|
|
- Mission-critical systems
|
|
- Complex changes
|
|
- High business impact
|
|
|
|
**Full Process:**
|
|
1. Design and plan
|
|
2. Generate configurations
|
|
3. Architecture review
|
|
4. Security review
|
|
5. Lab testing
|
|
6. Change approval (full CAB)
|
|
7. Stakeholder communication
|
|
8. Comprehensive backups
|
|
9. Team coordination
|
|
10. Pre-deployment validation
|
|
11. Phased deployment with checkpoints
|
|
12. Comprehensive post-deployment validation
|
|
13. Documentation and closure
|
|
14. Post-implementation review
|
|
|
|
## Common Deployment Issues
|
|
|
|
**Configuration Syntax Errors:**
|
|
- Validate all configs before deployment
|
|
- Use dry-run/test modes
|
|
- Have syntax checkers in place
|
|
|
|
**Connectivity Loss:**
|
|
- Always have out-of-band access
|
|
- Test on non-production first
|
|
- Have console/KVM access ready
|
|
- Deploy during maintenance window
|
|
|
|
**Routing Convergence Issues:**
|
|
- Allow time for convergence
|
|
- Monitor convergence in real-time
|
|
- Have pre-calculated convergence times
|
|
- Test failover scenarios
|
|
|
|
**Rollback Complexity:**
|
|
- Keep rollback procedures simple
|
|
- Test rollback procedures beforehand
|
|
- Have automated rollback scripts
|
|
- Clear rollback criteria
|
|
|
|
## Notes
|
|
|
|
- Deployments should never be rushed
|
|
- Always have a rollback plan
|
|
- Test everything in non-production first
|
|
- Communication is critical for success
|
|
- Document everything
|
|
- Learn from each deployment (post-implementation review)
|
|
- Automation reduces risk for repetitive deployments
|
|
|
|
## Example Task Invocation
|
|
|
|
```
|
|
deploy-network Deploy BGP configuration to 10 data center leaf switches in production. We have a 4-hour maintenance window Saturday 2-6am. Need full architecture and security review before deployment. Configs are already generated and need deployment orchestration with phased rollout and comprehensive validation.
|
|
```
|