Initial commit

This commit is contained in:
Zhongwei Li
2025-11-30 08:45:31 +08:00
commit ca9b85ccda
35 changed files with 10784 additions and 0 deletions

View File

@@ -0,0 +1,146 @@
# Flow Schematic: <!-- TODO: Feature Name -->
**Document ID:** `flow-[project]-[feature-id]-[description]`
**Status:** <!-- TODO: Draft | In Review | Approved -->
**Last Updated:** <!-- TODO: YYYY-MM-DD -->
**Owner:** <!-- TODO: Team/Individual -->
**Related Specs:** <!-- TODO: List related spec IDs -->
---
## Overview
<!-- TODO: Brief description of what this flow accomplishes and why it exists -->
**Purpose:** <!-- TODO: 1-2 sentences on the business/technical goal -->
**Trigger:** <!-- TODO: What initiates this flow - user action, system event, scheduled task, etc. -->
**Outcome:** <!-- TODO: Expected end state when flow completes successfully -->
---
## Scope & Context
### In Scope
<!-- TODO: List what's in scope:
- Primary flow path
- Key decision points
- Critical error handling
-->
### Out of Scope
<!-- TODO: List what's out of scope:
- Edge cases handled elsewhere
- Related but separate flows
-->
### Assumptions
<!-- TODO: List assumptions:
- Required preconditions
- System state assumptions
-->
---
## Flow Steps
<!-- TODO: Main flow sequence - focus on the happy path. Document in table format:
| Step | Actor | Action | Decision/Output |
|------|-------|--------|-----------------|
| 1 | [System/User/Service] | [Action description] | [Decision criteria or next step] |
| 2 | [System/User/Service] | [Action description] | [Decision criteria or next step] |
-->
---
## Decision Points
<!-- TODO: Key decisions that affect flow direction
### Decision 1: [Name]
**Condition:** [What triggers this decision]
**Options:**
- **Path A:** [Condition] → [Outcome]
- **Path B:** [Condition] → [Outcome]
-->
---
## Error Handling
<!-- TODO: Critical error scenarios and recovery strategies. Document in table format:
| Error Type | Detection | Recovery Action | Fallback |
|------------|-----------|-----------------|----------|
| [Error category] | [How identified] | [Primary recovery] | [If recovery fails] |
-->
**Rollback Strategy:** <!-- TODO: How to undo partial completion -->
---
## Dependencies
### System Dependencies
<!-- TODO: List required services, data sources, and infrastructure:
- **Services:** [Required services/APIs]
- **Data:** [Required data sources]
- **Infrastructure:** [Required infrastructure components]
-->
### External Dependencies
<!-- TODO: OPTIONAL - Remove if not applicable. List external services and user actions:
- **Third-party APIs:** [External services]
- **User Actions:** [Required user inputs]
-->
### Upstream Flows
<!-- TODO: OPTIONAL - Remove if not applicable. List flows that must complete before this one -->
### Downstream Flows
<!-- TODO: OPTIONAL - Remove if not applicable. List flows triggered by this one -->
---
## Success Criteria
<!-- TODO: How to verify the flow completed correctly -->
### Functional Success
<!-- TODO: List functional criteria:
- [ ] [Key outcome 1 achieved]
- [ ] [Key outcome 2 achieved]
- [ ] [Data consistency verified]
-->
### Technical Success
<!-- TODO: List technical criteria:
- [ ] [No errors logged]
- [ ] [State correctly updated]
- [ ] [Downstream systems notified]
-->
---
## Performance Targets
<!-- TODO: Document performance targets in table format:
| Metric | Target | Measurement Point |
|--------|--------|-------------------|
| End-to-end latency | [e.g., <500ms] | [Start to completion] |
| Individual step time | [e.g., <100ms] | [Critical step] |
| Throughput | [e.g., 1000 req/sec] | [Peak load scenario] |
| Error rate | [e.g., <0.1%] | [Per 1000 executions] |
-->
**Timeout:** <!-- TODO: Maximum flow duration before abort -->
---
## Notes
<!-- TODO: OPTIONAL - Remove if not applicable. Additional context, caveats, or future considerations:
- [Important consideration 1]
- [Important consideration 2]
- [Known limitation or future enhancement]
-->