Deliberation, Debate & Red Teaming Template
Workflow
Copy this checklist and track your progress:
Red Teaming Progress:
- [ ] Step 1: Proposal definition and context
- [ ] Step 2: Adversarial role assignment
- [ ] Step 3: Critique generation
- [ ] Step 4: Risk assessment and prioritization
- [ ] Step 5: Mitigation recommendations
Step 1: Proposal definition - Define what we're evaluating, stakes, constraints. See Proposal Definition.
Step 2: Adversarial role assignment - Choose 3-5 critical perspectives. See Role Assignment.
Step 3: Critique generation - For each role, generate specific challenges. See Critique Generation.
Step 4: Risk assessment - Score risks by severity × likelihood. See Risk Assessment.
Step 5: Mitigation recommendations - Propose fixes for critical risks. See Mitigation Recommendations.
Proposal Definition
Input Template
## Proposal Under Review
**Title:** [Concise name of proposal]
**Description:** [1-3 sentences explaining what we're proposing to do]
**Goal:** [Why are we doing this? What problem does it solve?]
**Stakeholders:**
- **Proposer:** [Who is advocating for this]
- **Decision maker:** [Who has final authority]
- **Affected parties:** [Who will be impacted]
**Stakes:**
- **If successful:** [Upside, benefits]
- **If fails:** [Downside, worst case]
- **Reversibility:** [Can we undo this? At what cost?]
**Timeline:**
- **Decision deadline:** [When must we decide]
- **Implementation timeline:** [When would this happen]
- **Cost of delay:** [What do we lose by waiting]
**Current confidence:** [Team's current belief this is the right decision, 0-100%]
**Prior analysis:** [What vetting has been done already]
Role Assignment
Role Selection Guide
Choose 3-5 adversarial roles most likely to expose blind spots for this specific proposal.
For product/feature launches:
- Customer (user friction)
- Operations (reliability, maintenance)
- Competitor (market positioning)
- Legal/Privacy (compliance)
For technical/architecture decisions:
- Security (attack vectors)
- Operations (operability, debugging)
- Engineer (technical debt, complexity)
- Long-term Thinker (future costs)
For strategy/business decisions:
- Competitor (market response)
- Finance (hidden costs, ROI assumptions)
- Contrarian (challenge core assumptions)
- Long-term Thinker (second-order effects)
For policy/process changes:
- Affected User (workflow disruption)
- Operations (enforcement burden)
- Legal/Compliance (regulatory risk)
- Investigative Journalist (PR risk)
Role Assignment Template
## Adversarial Roles
**Role 1: [Role Name]** (e.g., Security / Malicious Actor)
- **Perspective:** [What are this role's incentives and concerns?]
- **Key question:** [What would this role be most worried about?]
**Role 2: [Role Name]** (e.g., Customer)
- **Perspective:** [What does this role care about?]
- **Key question:** [What friction or cost does this create for them?]
**Role 3: [Role Name]** (e.g., Operations)
- **Perspective:** [What operational burden does this create?]
- **Key question:** [What breaks at 2am?]
**Role 4: [Role Name]** (optional)
- **Perspective:**
- **Key question:**
**Role 5: [Role Name]** (optional)
- **Perspective:**
- **Key question:**
Critique Generation
Critique Framework
For each assigned role, answer these questions:
1. What could go wrong?
- Failure modes from this perspective
- Edge cases that break the proposal
- Unintended consequences
2. What assumptions are questionable?
- Optimistic estimates (timeline, cost, adoption)
- Unvalidated beliefs (market demand, technical feasibility)
- Hidden dependencies
3. What are we missing?
- Gaps in analysis
- Stakeholders not considered
- Alternative approaches not evaluated
4. What happens under stress?
- How does this fail under load, pressure, or adversarial conditions?
- What cascading failures could occur?
Critique Template (Per Role)
### Critique from [Role Name]
**What could go wrong:**
1. [Specific failure mode]
2. [Edge case that breaks this]
3. [Unintended consequence]
**Questionable assumptions:**
1. [Optimistic estimate: e.g., "assumes 80% adoption but no user testing"]
2. [Unvalidated belief: e.g., "assumes competitors won't respond"]
3. [Hidden dependency: e.g., "requires Team X to deliver by date Y"]
**What we're missing:**
1. [Gap in analysis: e.g., "no security review"]
2. [Unconsidered stakeholder: e.g., "impact on support team not assessed"]
3. [Alternative not evaluated: e.g., "could achieve same goal with lower-risk approach"]
**Stress test scenarios:**
1. [High load: e.g., "What if usage is 10x expected?"]
2. [Adversarial: e.g., "What if competitor launches similar feature first?"]
3. [Cascading failure: e.g., "What if dependency X goes down?"]
**Severity assessment:** [Critical / High / Medium / Low / Trivial]
**Likelihood assessment:** [Very Likely / Likely / Possible / Unlikely / Rare]
Multi-Role Synthesis Template
## Critique Summary (All Roles)
**Themes across roles:**
- **Security/Privacy:** [Cross-role security concerns]
- **Operations/Reliability:** [Operational risks raised by multiple roles]
- **Customer Impact:** [User friction points]
- **Financial:** [Cost or ROI concerns]
- **Legal/Compliance:** [Regulatory or liability issues]
- **Technical Feasibility:** [Implementation challenges]
**Showstopper risks** (mentioned by multiple roles or rated Critical):
1. [Risk that appeared in multiple critiques or scored ≥15]
2. [Another critical cross-cutting concern]
Risk Assessment
Risk Scoring Process
For each risk identified in critiques:
-
Assess Severity (1-5):
- 5 = Critical (catastrophic failure)
- 4 = High (major damage)
- 3 = Medium (moderate impact)
- 2 = Low (minor inconvenience)
- 1 = Trivial (negligible)
-
Assess Likelihood (1-5):
- 5 = Very Likely (>80%)
- 4 = Likely (50-80%)
- 3 = Possible (20-50%)
- 2 = Unlikely (5-20%)
- 1 = Rare (<5%)
-
Calculate Risk Score: Severity × Likelihood
-
Categorize:
- ≥15: Showstopper (must fix)
- 10-14: High Priority (should address)
- 5-9: Monitor (accept with contingency)
- <5: Accept (acknowledge)
Risk Assessment Template
## Risk Register
| # | Risk Description | Source Role | Severity | Likelihood | Score | Category | Priority |
|---|-----------------|-------------|----------|------------|-------|----------|----------|
| 1 | [Specific risk] | [Role] | [1-5] | [1-5] | [Score] | [Showstopper/High/Monitor/Accept] | [1/2/3] |
| 2 | [Specific risk] | [Role] | [1-5] | [1-5] | [Score] | [Category] | [Priority] |
| 3 | [Specific risk] | [Role] | [1-5] | [1-5] | [Score] | [Category] | [Priority] |
**Showstoppers (Score ≥ 15):**
- [List all must-fix risks]
**High Priority (Score 10-14):**
- [List should-address risks]
**Monitored (Score 5-9):**
- [List accept-with-contingency risks]
**Accepted (Score < 5):**
- [List acknowledged low-risk items]
Mitigation Recommendations
Mitigation Strategy Selection
For each risk, choose appropriate mitigation:
Showstoppers: Must be addressed before proceeding
- Revise: Change the proposal to eliminate risk
- Safeguard: Add controls to reduce likelihood
- Reduce scope: Limit blast radius (gradual rollout, pilot)
- Delay: Gather more data or wait for conditions to improve
High Priority: Should address or have strong plan
- Safeguard: Add monitoring, rollback capability
- Contingency: Have plan B ready
- Reduce scope: Phase implementation
- Monitor: Track closely with trigger for action
Monitor: Accept with contingency
- Monitor: Set up alerts/metrics
- Contingency: Have fix ready but don't implement preemptively
Accept: Acknowledge and move on
- Document: Note risk for awareness
- No action: Proceed as planned
Mitigation Template
## Mitigation Plan
### Showstopper Risks (Must Address)
**Risk 1: [Description]** (Score: [XX], S: [X], L: [X])
- **Strategy:** [Revise / Safeguard / Reduce Scope / Delay]
- **Actions:** [1. Concrete action, 2. Another action, 3. Measurement]
- **Owner:** [Who] | **Deadline:** [When] | **Success:** [How we know it's mitigated]
**Risk 2: [Description]** (Score: [XX])
[Same structure]
### High Priority Risks (Should Address)
**Risk 3: [Description]** (Score: [XX])
- **Strategy:** [Safeguard / Contingency / Reduce Scope / Monitor]
- **Actions:** [1. Action, 2. Monitoring setup]
- **Owner:** [Who] | **Deadline:** [When]
### Monitored Risks
**Risk 4: [Description]** (Score: [XX])
- **Metrics:** [Track] | **Alert:** [Threshold] | **Contingency:** [Action if manifests]
### Accepted Risks
**Risk 5: [Description]** (Score: [XX]) - [Rationale for acceptance]
Revised Proposal Template
## Revised Proposal
**Original Proposal:**
[Brief summary of what was originally proposed]
**Key Changes Based on Red Team:**
1. [Change based on showstopper risk X]
2. [Safeguard added for high-priority risk Y]
3. [Scope reduction for risk Z]
**New Implementation Plan:**
- **Phase 1:** [Revised timeline, reduced scope, or pilot approach]
- **Phase 2:** [Gradual expansion if Phase 1 succeeds]
- **Rollback Plan:** [How we undo if something goes wrong]
**Updated Risk Profile:**
- **Showstoppers remaining:** [None / X issues pending resolution]
- **High-priority risks with mitigation:** [List with brief mitigation]
- **Monitoring plan:** [Key metrics and thresholds]
**Recommendation:**
- [ ] **Proceed** - All showstoppers addressed, high-priority risks mitigated
- [ ] **Proceed with caution** - Some high-priority risks remain, monitoring required
- [ ] **Delay** - Showstoppers unresolved, gather more data
- [ ] **Cancel** - Risks too high even with mitigations, pursue alternative
Quality Checklist
Before delivering red team analysis, verify:
Critique quality:
- Each role provides specific, realistic critiques (not strawman arguments)
- Critiques identify failure modes, questionable assumptions, gaps, and stress scenarios
- At least 3 roles provide independent perspectives
- Critiques are adversarial but constructive (steelman, not strawman)
Risk assessment:
- All identified risks have severity and likelihood ratings
- Risk scores calculated correctly (Severity × Likelihood)
- Showstoppers clearly flagged (score ≥ 15)
- Risk categories assigned (Showstopper/High/Monitor/Accept)
Mitigation quality:
- Every showstopper has specific mitigation plan
- High-priority risks either mitigated or explicitly accepted with rationale
- Mitigations are concrete (not vague like "be careful")
- Responsibility and deadlines assigned for showstopper mitigations
Revised proposal:
- Changes clearly linked to risks identified in red team
- Implementation plan updated (phasing, rollback, monitoring)
- Recommendation made (Proceed / Proceed with caution / Delay / Cancel)
- Rationale provided for recommendation
Common Pitfalls
| Pitfall | Fix |
|---|---|
| Strawman critiques (weak arguments) | Make critiques realistic. If real attacker wouldn't make this argument, don't use it. |
| Missing critical perspectives | Identify who has most to lose. Include those roles. |
| No prioritization (all risks equal) | Use severity × likelihood matrix. Not everything is showstopper. |
| Vague mitigations ("be careful") | Make concrete, measurable, with owners and deadlines. |
| Red team as rubber stamp | Genuinely seek to break proposal. If nothing found, critique wasn't adversarial enough. |
| Defensive response | Red team's job is to find problems. Fix or accept risk, don't dismiss. |
| Analysis paralysis | Time-box red team (1-2 sessions). Focus on showstoppers. |
| Ignoring culture | Calibrate tone. Some teams prefer "curious questions" over "aggressive challenges." |