"name": "Prioritization Effort-Impact Evaluator",
|
||||
"description": "Evaluates prioritization artifacts (effort-impact matrices, roadmaps) for quality of scoring, stakeholder alignment, and decision clarity",
|
||||
"criteria": [
|
||||
{
|
||||
"name": "Scoring Quality & Differentiation",
|
||||
"weight": 1.4,
|
||||
"scale": {
|
||||
"1": "All items scored similarly (e.g., all 3s) with no differentiation, or scores appear random/unsupported",
|
||||
"2": "Some differentiation but clustering around middle (2.5-3.5 range), limited use of full scale, weak rationale",
|
||||
"3": "Moderate differentiation with scores using 1-5 range, basic rationale provided for most items, some bias evident",
|
||||
"4": "Strong differentiation across full 1-5 scale, clear rationale for scores, stakeholder input documented, few items cluster at boundaries",
|
||||
"5": "Exemplary differentiation with calibrated scoring (reference examples documented), transparent rationale for all items, bias mitigation techniques used (silent voting, forced ranking), no suspicious clustering"
|
||||
},
|
||||
"indicators": {
|
||||
"excellent": [
|
||||
"Scores use full 1-5 range with clear distribution (few 1s/5s, more 2s/4s)",
|
||||
"Reference items documented for calibration (e.g., 'Effort=2 example: CSV export, 2 days')",
|
||||
"Scoring rationale explicit for each item (why Effort=4, why Impact=3)",
|
||||
"Stakeholder perspectives documented (eng estimated effort, sales estimated impact)",
|
||||
"Bias mitigation used (silent voting, anonymous scoring before discussion)"
|
||||
],
|
||||
"poor": [
|
||||
"All scores 2.5-3.5 (no differentiation)",
|
||||
"No rationale for why scores assigned",
|
||||
"Single person scored everything alone",
|
||||
"Scores don't match descriptions (called 'critical' but scored Impact=2)",
|
||||
"Obvious optimism bias (everything is low effort, high impact)"
|
||||
]
|
||||
}
|
||||
},
|
||||
{
|
||||
"name": "Quadrant Classification Accuracy",
|
||||
"weight": 1.3,
|
||||
"scale": {
|
||||
"1": "Items misclassified (e.g., Effort=5 Impact=2 called 'Quick Win'), or no quadrants identified at all",
|
||||
"2": "Quadrants identified but boundaries unclear (what's 'high' vs 'low'?), some misclassifications",
|
||||
"3": "Quadrants correctly identified with reasonable boundaries (e.g., >3.5 = high), minor edge cases unclear",
|
||||
"4": "Clear quadrant boundaries documented, all items classified correctly, edge cases explicitly addressed",
|
||||
"5": "Exemplary classification with explicit boundary definitions, items near boundaries re-evaluated, typical quadrant distribution validated (10-20% Quick Wins, not 50%)"
|
||||
},
|
||||
"indicators": {
|
||||
"excellent": [
|
||||
"Quadrant boundaries explicit (e.g., 'High Impact = ≥4, Low Effort = ≤2')",
|
||||
"10-20% Quick Wins (realistic, not over-optimistic)",
|
||||
"20-30% Big Bets (sufficient strategic work)",
|
||||
"Time Sinks identified and explicitly cut/deferred",
|
||||
"Items near boundaries (e.g., Effort=3, Impact=3) re-evaluated or called out as edge cases"
|
||||
],
|
||||
"poor": [
|
||||
"50%+ Quick Wins (unrealistic, likely miscalibrated)",
|
||||
"0 Quick Wins (likely miscalibrated, overestimating effort)",
|
||||
"No Time Sinks identified (probably hiding low-value work)",
|
||||
"Boundaries undefined (unclear what 'high impact' means)",
|
||||
"Items clearly misclassified (Effort=5 Impact=1 in roadmap as priority)"
|
||||
]
|
||||
}
|
||||
},
|
||||
{
|
||||
"name": "Stakeholder Alignment & Input Quality",
|
||||
"weight": 1.2,
|
||||
"scale": {
|
||||
"1": "Single person created prioritization with no stakeholder input, or stakeholder disagreements unresolved",
|
||||
"2": "Minimal stakeholder input (1-2 people), no documentation of how disagreements resolved",
|
||||
"3": "Multiple stakeholders involved (eng, product, sales), basic consensus reached, some perspectives missing",
|
||||
"4": "Diverse stakeholders (eng, product, sales, CS, design) contributed appropriately (eng on effort, sales on value), disagreements discussed and resolved, participants documented",
|
||||
"5": "Exemplary stakeholder process with weighted input by expertise (eng estimates effort, sales estimates customer value), bias mitigation (silent voting, anonymous scoring), pre-mortem for controversial items, all participants and resolution process documented"
|
||||
},
|
||||
"indicators": {
|
||||
"excellent": [
|
||||
"Participants listed with roles (3 eng, 1 PM, 2 sales, 1 CS)",
|
||||
"Expertise-based weighting (eng scores effort 100%, sales contributes to impact)",
|
||||
"Bias mitigation documented (silent voting used, then discussion)",
|
||||
"Disagreements surfaced and resolved (eng said Effort=5, product said 3, converged at 4 because...)",
|
||||
"Pre-mortem or red-teaming for controversial/uncertain items"
|
||||
],
|
||||
"poor": [
|
||||
"No participant list (unclear who contributed)",
|
||||
"PM scored everything alone",
|
||||
"HIPPO (highest paid person) scores overrode team input with no discussion",
|
||||
"Stakeholders disagree but no resolution documented",
|
||||
"One function (e.g., only eng) scored both effort and impact"
|
||||
]
|
||||
}
|
||||
},
|
||||
{
|
||||
"name": "Roadmap Sequencing & Realism",
|
||||
"weight": 1.3,
|
||||
"scale": {
|
||||
"1": "No roadmap created, or roadmap ignores quadrants (Time Sinks scheduled first), or plans 100%+ of capacity",
|
||||
"2": "Roadmap exists but doesn't follow quadrant logic (Big Bets before Quick Wins), capacity planning missing or unrealistic",
|
||||
"3": "Roadmap sequences Quick Wins → Big Bets, basic timeline, capacity roughly considered but not calculated",
|
||||
"4": "Roadmap sequences correctly, timeline realistic with capacity calculated (team size × time), dependencies mapped, buffer included (70-80% utilization)",
|
||||
"5": "Exemplary roadmap with Quick Wins first (momentum), Big Bets phased for incremental value, Fill-Ins opportunistic, Time Sinks explicitly cut with rationale, dependencies mapped with critical path identified, capacity buffer (20-30%), velocity-based forecasting"
|
||||
},
|
||||
"indicators": {
|
||||
"excellent": [
|
||||
"Phase 1: Quick Wins (Weeks 1-4) to build momentum",
|
||||
"Phase 2: Big Bets (phased for incremental value, not monolithic)",
|
||||
"Fill-Ins not scheduled explicitly (opportunistic during downtime)",
|
||||
"Time Sinks explicitly rejected with rationale communicated",
|
||||
"Dependencies mapped (item X depends on Y completing first)",
|
||||
"Capacity buffer (planned 70-80% of capacity, not 100%)",
|
||||
"Timeline realistic (effort scores × team size = weeks)"
|
||||
],
|
||||
"poor": [
|
||||
"No sequencing (items listed randomly)",
|
||||
"Big Bets scheduled before Quick Wins (no momentum)",
|
||||
"Time Sinks included in roadmap (low ROI items)",
|
||||
"Planned at 100%+ capacity (no buffer for unknowns)",
|
||||
"No timeline or unrealistic timeline (20 effort points in 1 week)",
|
||||
"Dependencies ignored (dependent items scheduled in parallel)"
|
||||
]
|
||||
}
|
||||
},
|
||||
{
|
||||
"name": "Effort Scoring Rigor",
|
||||
"weight": 1.1,
|
||||
"scale": {
|
||||
"1": "Effort scored on single dimension (time only) with no consideration of complexity, risk, dependencies, or scores are guesses with no rationale",
|
||||
"2": "Effort considers time but inconsistently accounts for complexity/risk/dependencies, weak rationale",
|
||||
"3": "Effort considers multiple dimensions (time, complexity, risk) with reasonable rationale, some dimensions missing (e.g., dependencies)",
|
||||
"4": "Effort considers time, complexity, risk, dependencies with clear rationale, minor gaps (e.g., didn't account for QA/deployment)",
|
||||
"5": "Effort comprehensively considers time, complexity, risk, dependencies, unknowns, cross-team coordination, QA, deployment, with transparent rationale and historical calibration (past estimates vs actuals reviewed)"
|
||||
},
|
||||
"indicators": {
|
||||
"excellent": [
|
||||
"Effort dimensions documented (time=3, complexity=4, risk=2, dependencies=3 → avg=3)",
|
||||
"Rationale explains all factors (Effort=4 because: 6 weeks, requires 3 teams, new tech stack, integration with 2 external systems)",
|
||||
"Historical calibration referenced (similar item took 8 weeks last time)",
|
||||
"Accounts for full lifecycle (dev + design + QA + deployment + docs)",
|
||||
"Risk/unknowns factored in (confidence intervals or buffers)"
|
||||
],
|
||||
"poor": [
|
||||
"Effort = engineering time only (ignores design, QA, deployment)",
|
||||
"No rationale (just 'Effort=3' with no explanation)",
|
||||
"Optimism bias evident (everything is 1-2 effort)",
|
||||
"Dependencies ignored (item requires prerequisite but scored standalone)",
|
||||
"Doesn't match description (called 'major migration' but Effort=2)"
|
||||
]
|
||||
}
|
||||
},
|
||||
{
|
||||
"name": "Impact Scoring Rigor",
|
||||
"weight": 1.2,
|
||||
"scale": {
|
||||
"1": "Impact scored on single dimension (revenue only, or gut feel) with no consideration of users, strategy, pain, or scores appear arbitrary",
|
||||
"2": "Impact considers one dimension (e.g., users) but ignores business value, strategic alignment, or pain severity, weak rationale",
|
||||
"3": "Impact considers multiple dimensions (users, value, strategy) with reasonable rationale, some dimensions missing or speculative",
|
||||
"4": "Impact considers users, business value, strategic alignment, user pain with clear rationale, minor gaps (e.g., no data validation)",
|
||||
"5": "Impact comprehensively considers users, business value, strategic alignment, user pain, competitive positioning, with transparent rationale and data validation (user research, usage analytics, revenue models, NPS/CSAT drivers)"
|
||||
},
|
||||
"indicators": {
|
||||
"excellent": [
|
||||
"Impact dimensions documented (users=5, value=$500K, strategy=4, pain=3 → avg=4.25)",
|
||||
"Rationale explains all factors (Impact=5 because: 90% users affected, $1M ARR at risk, critical to Q1 OKR, top NPS detractor)",
|
||||
"Data-driven validation (50 customer survey, 80% rated 'very important')",
|
||||
"Usage analytics support (10K support tickets, 500K page views/mo with 30% bounce)",
|
||||
"Strategic alignment explicit (ties to company OKR, competitive differentiation)",
|
||||
"User pain quantified (severity, frequency, workarounds)"
|
||||
],
|
||||
"poor": [
|
||||
"Impact = revenue only (ignores users, strategy, pain)",
|
||||
"No rationale (just 'Impact=4' with no explanation)",
|
||||
"Speculation without validation ('probably' high impact, 'might' drive revenue)",
|
||||
"Doesn't match description (called 'niche edge case' but Impact=5)",
|
||||
"Strategic override without justification ('CEO wants it' → Impact=5)",
|
||||
"Ignores user research (survey says low importance, scored high anyway)"
|
||||
]
|
||||
}
|
||||
},
|
||||
{
|
||||
"name": "Communication & Decision Transparency",
|
||||
"weight": 1.1,
|
||||
"scale": {
|
||||
"1": "No explanation of decisions, just list of prioritized items with no rationale, or decisions contradict scores without explanation",
|
||||
"2": "Minimal explanation (prioritized X, Y, Z) with no rationale for why or why not others, trade-offs unclear",
|
||||
"3": "Basic explanation of decisions (doing X because high impact, deferring Y because low impact), trade-offs mentioned but not detailed",
|
||||
"4": "Clear explanation of decisions with rationale tied to scores, trade-offs explicit (doing X means not doing Y), stakeholder concerns addressed",
|
||||
"5": "Exemplary transparency with full rationale for all decisions, trade-offs explicit and quantified, stakeholder concerns documented and addressed, communication plan for rejected items (what we're NOT doing and why), success metrics defined, review cadence set"
|
||||
},
|
||||
"indicators": {
|
||||
"excellent": [
|
||||
"Decision rationale clear (prioritized X because Impact=5 Effort=2, deferred Y because Impact=2 Effort=5)",
|
||||
"Trade-offs explicit (doing X means not doing Y this quarter)",
|
||||
"Stakeholder concerns addressed (Sales wanted Z but impact is low because only 2 customers requesting)",
|
||||
"Rejected items communicated (explicitly closing 15 Time Sinks to focus resources)",
|
||||
"Success metrics defined (how will we know this roadmap succeeded? Ship 3 Quick Wins by end of month, 50% user adoption of Big Bet)",
|
||||
"Review cadence set (re-score quarterly, adjust roadmap monthly)"
|
||||
],
|
||||
"poor": [
|
||||
"No rationale for decisions (just 'we're doing X, Y, Z')",
|
||||
"Trade-offs hidden (doesn't mention what's NOT being done)",
|
||||
"Stakeholder concerns ignored or dismissed without explanation",
|
||||
"No communication plan for rejected items",
|
||||
"No success metrics (unclear how to measure if prioritization worked)",
|
||||
"One-time prioritization (no plan to revisit/adjust)"
|
||||
]
|
||||
}
|
||||
},
|
||||
{
|
||||
"name": "Completeness & Structure",
|
||||
"weight": 1.0,
|
||||
"scale": {
|
||||
"1": "Missing critical components (no matrix, no roadmap, or just a list of items), or completely unstructured",
|
||||
"2": "Some components present (matrix OR roadmap) but incomplete, minimal structure",
|
||||
"3": "Most components present (scoring table, matrix, roadmap) with basic structure, some sections missing detail",
|
||||
"4": "All components present and well-structured (scoring table with rationale, matrix with quadrants, phased roadmap, capacity planning), minor gaps",
|
||||
"5": "Comprehensive artifact with all components (scoring table with multi-dimensional rationale, visual matrix, phased roadmap with dependencies, capacity planning with buffer, quality checklist completed, stakeholder sign-off documented)"
|
||||
},
|
||||
"indicators": {
|
||||
"excellent": [
|
||||
"Scoring table with all items, effort/impact scores, quadrant classification, rationale",
|
||||
"Visual matrix plotted (2x2 grid with items positioned)",
|
||||
"Quadrant summary (lists Quick Wins, Big Bets, Fill-Ins, Time Sinks with counts)",
|
||||
"Phased roadmap (Phase 1: Quick Wins weeks 1-4, Phase 2: Big Bets weeks 5-16, etc.)",
|
||||
"Capacity planning (team size, utilization, buffer calculated)",
|
||||
"Dependencies mapped (critical path identified)",
|
||||
"Quality checklist completed (self-assessment documented)",
|
||||
"Stakeholder participants and sign-off documented"
|
||||
],
|
||||
"poor": [
|
||||
"Just a list of items with scores (no matrix, no roadmap)",
|
||||
"No visual representation (hard to see quadrants at a glance)",
|
||||
"No roadmap sequencing (unclear execution order)",
|
||||
"No capacity planning (unclear if realistic)",
|
||||
"Missing quadrant summaries (can't quickly see Quick Wins)",
|
||||
"No documentation of process (unclear how decisions were made)"
|
||||
]
|
||||
}
|
||||
}
|
||||
],
|
||||
"guidance": {
|
||||
"by_context": {
|
||||
"product_backlog": {
|
||||
"focus": "Emphasize user reach, business value, and technical complexity. Quick wins should be UX improvements or small integrations. Big bets are new workflows or platform changes.",
|
||||
"red_flags": [
|
||||
"All features scored high impact (if everything is priority, nothing is)",
|
||||
"Effort ignores design/QA time (only engineering hours)",
|
||||
"No usage data to validate impact assumptions",
|
||||
"Edge cases prioritized over core functionality"
|
||||
]
|
||||
},
|
||||
"technical_debt": {
|
||||
"focus": "Emphasize developer productivity impact, future velocity, and risk reduction. Quick wins are dependency upgrades or small refactors. Big bets are architecture overhauls.",
|
||||
"red_flags": [
|
||||
"Impact scored only on 'clean code' (not business value or velocity)",
|
||||
"Premature optimizations (performance work with no bottleneck)",
|
||||
"Refactoring for refactoring's sake (no measurable improvement)",
|
||||
"Not tying technical debt to business outcomes"
|
||||
]
|
||||
},
|
||||
"bug_triage": {
|
||||
"focus": "Emphasize user pain severity, frequency, and business impact (revenue, support cost). Quick wins are high-frequency easy fixes. Big bets are complex architectural bugs.",
|
||||
"red_flags": [
|
||||
"Severity without frequency (rare edge case scored high priority)",
|
||||
"Cosmetic bugs prioritized over functional bugs",
|
||||
"Effort underestimated (bug fixes often have hidden complexity)",
|
||||
"No workarounds considered (high-effort bug with easy workaround is lower priority)"
|
||||
]
|
||||
},
|
||||
"strategic_initiatives": {
|
||||
"focus": "Emphasize strategic alignment, competitive positioning, and revenue/cost impact. Quick wins are pilot programs or process tweaks. Big bets are market expansion or platform investments.",
|
||||
"red_flags": [
|
||||
"All initiatives scored 'strategic' (dilutes meaning)",
|
||||
"No tie to company OKRs or goals",
|
||||
"Ignoring opportunity cost (resources used here can't be used there)",
|
||||
"Betting on too many big bets (spreading too thin)"
|
||||
]
|
||||
}
|
||||
},
|
||||
"by_team_size": {
|
||||
"small_team_2_5": {
|
||||
"advice": "Focus heavily on Quick Wins and Fill-Ins. Can only do 1 Big Bet at a time. Avoid Time Sinks completely (no capacity to waste). Expect 60-70% utilization (support/bugs take more time in small teams).",
|
||||
"capacity_planning": "Assume 60% project capacity (40% goes to support, bugs, meetings, context switching)"
|
||||
},
|
||||
"medium_team_6_15": {
|
||||
"advice": "Balance Quick Wins (70%) and Big Bets (30%). Can parallelize 2-3 Big Bets if low dependencies. Explicitly cut Time Sinks. Expect 70-80% utilization.",
|
||||
"capacity_planning": "Assume 70% project capacity (30% support, bugs, meetings, code review)"
|
||||
},
|
||||
"large_team_16_plus": {
|
||||
"advice": "Can run multiple Big Bets in parallel, but watch for coordination overhead. Need more strategic work (Big Bets 40%, Quick Wins 60%) to justify team size. Expect 75-85% utilization.",
|
||||
"capacity_planning": "Assume 75% project capacity (25% meetings, cross-team coordination, support)"
|
||||
}
|
||||
},
|
||||
"by_time_horizon": {
|
||||
"sprint_2_weeks": {
|
||||
"advice": "Only Quick Wins and Fill-Ins. No Big Bets (can't complete in 2 weeks). Focus on 1-3 Quick Wins max. Expect interruptions (support, bugs).",
|
||||
"typical_velocity": "3-5 effort points per sprint for 3-person team"
|
||||
},
|
||||
"quarter_3_months": {
|
||||
"advice": "2-3 Quick Wins in first month, 1-2 Big Bets over remaining 2 months. Don't overcommit (leave buffer for Q-end support/planning).",
|
||||
"typical_velocity": "15-25 effort points per quarter for 3-person team"
|
||||
},
|
||||
"annual_12_months": {
|
||||
"advice": "Mix of 8-12 Quick Wins and 3-5 Big Bets across year. Revisit quarterly (don't lock in for full year). Balance short-term momentum and long-term strategy.",
|
||||
"typical_velocity": "60-100 effort points per year for 3-person team"
|
||||
}
|
||||
}
|
||||
},
|
||||
"common_failure_modes": {
|
||||
"all_quick_wins": {
|
||||
"symptom": "50%+ of items scored as Quick Wins (high impact, low effort)",
|
||||
"root_cause": "Optimism bias (underestimating effort or overestimating impact), lack of calibration, wishful thinking",
|
||||
"fix": "Run pre-mortem on 'Quick Wins': If this is so easy and valuable, why haven't we done it already? Re-calibrate effort scores with engineering input. Validate impact with user research."
|
||||
},
|
||||
"no_quick_wins": {
|
||||
"symptom": "0 Quick Wins identified (everything is low impact or high effort)",
|
||||
"root_cause": "Pessimism bias (overestimating effort or underestimating impact), lack of creativity, analysis paralysis",
|
||||
"fix": "Force brainstorm: What's the smallest thing we could do to deliver value? What's the lowest-hanging fruit? Consider config changes, UX tweaks, integrations."
|
||||
},
|
||||
"all_3s": {
|
||||
"symptom": "80%+ of items scored 2.5-3.5 (no differentiation)",
|
||||
"root_cause": "Lack of calibration, avoiding hard choices, consensus-seeking without debate",
|
||||
"fix": "Forced ranking (only one item can be #1), use wider scale (1-10), calibrate with reference items, silent voting to avoid groupthink."
|
||||
},
|
||||
"time_sinks_in_roadmap": {
|
||||
"symptom": "Time Sinks (low impact, high effort) scheduled in roadmap",
|
||||
"root_cause": "Sunk cost fallacy, HIPPO pressure, not saying 'no', ignoring opportunity cost",
|
||||
"fix": "Explicitly cut Time Sinks. Challenge: Can we descope to make this lower effort? If not, reject. Communicate to stakeholders: 'We're not doing X because low ROI.'"
|
||||
},
|
||||
"capacity_overload": {
|
||||
"symptom": "Roadmap plans 100%+ of team capacity",
|
||||
"root_cause": "Ignoring support/bugs/meetings, optimism about execution, not accounting for unknowns",
|
||||
"fix": "Reduce planned capacity to 70-80% (buffer for unknowns). Calculate realistic capacity: team size × hours × utilization. Cut lowest-priority items to fit."
|
||||
},
|
||||
"solo_prioritization": {
|
||||
"symptom": "One person (usually PM) scored everything alone",
|
||||
"root_cause": "Lack of process, time pressure, avoiding conflict",
|
||||
"fix": "Multi-stakeholder scoring session (2-hour workshop with eng, product, sales, CS). Diverse input improves accuracy and builds buy-in."
|
||||
}
|
||||
},
|
||||
"excellence_indicators": {
|
||||
"overall": [
|
||||
"Scores are differentiated (use full 1-5 range, not clustered at 3)",
|
||||
"Scoring rationale is transparent and defensible for all items",
|
||||
"Diverse stakeholders contributed (eng, product, sales, CS, design)",
|
||||
"Quadrant distribution is realistic (10-20% Quick Wins, 20-30% Big Bets, not 50% Quick Wins)",
|
||||
"Roadmap sequences Quick Wins → Big Bets → Fill-Ins, explicitly cuts Time Sinks",
|
||||
"Capacity planning includes buffer (70-80% utilization, not 100%)",
|
||||
"Dependencies mapped and accounted for in sequencing",
|
||||
"Trade-offs explicit (doing X means not doing Y)",
|
||||
"Success metrics defined and review cadence set"
|
||||
],
|
||||
"data_driven": [
|
||||
"Impact scores validated with user research (surveys, interviews, usage analytics)",
|
||||
"Effort scores calibrated with historical data (past estimates vs actuals)",
|
||||
"Business value quantified (revenue impact, cost savings, NPS drivers)",
|
||||
"User pain measured (support ticket frequency, NPS detractor feedback)",
|
||||
"A/B test results inform prioritization (validate assumptions before big bets)"
|
||||
],
|
||||
"stakeholder_alignment": [
|
||||
"Participants documented (names, roles, contributions)",
|
||||
"Bias mitigation used (silent voting, anonymous scoring, forced ranking)",
|
||||
"Disagreements surfaced and resolved (documented how consensus reached)",
|
||||
"Pre-mortem for controversial items (surface hidden assumptions/risks)",
|
||||
"Stakeholder sign-off documented (alignment on final roadmap)"
|
||||
]
|
||||
}
|
||||
}
|
||||
488
skills/prioritization-effort-impact/resources/methodology.md
Normal file
488
skills/prioritization-effort-impact/resources/methodology.md
Normal file
@@ -0,0 +1,488 @@
|
||||
# Prioritization: Advanced Methodologies
|
||||
|
||||
## Table of Contents
|
||||
1. [Advanced Scoring Frameworks](#1-advanced-scoring-frameworks)
|
||||
2. [Alternative Prioritization Models](#2-alternative-prioritization-models)
|
||||
3. [Stakeholder Alignment Techniques](#3-stakeholder-alignment-techniques)
|
||||
4. [Data-Driven Prioritization](#4-data-driven-prioritization)
|
||||
5. [Roadmap Optimization](#5-roadmap-optimization)
|
||||
6. [Common Pitfalls and Solutions](#6-common-pitfalls-and-solutions)
|
||||
|
||||
---
|
||||
|
||||
## 1. Advanced Scoring Frameworks
|
||||
|
||||
### RICE Score (Reach × Impact × Confidence / Effort)
|
||||
|
||||
**Formula**: `Score = (Reach × Impact × Confidence) / Effort`
|
||||
|
||||
**When to use**: Product backlogs where user reach and confidence matter more than simple impact
|
||||
|
||||
**Components**:
|
||||
- **Reach**: Users/customers affected per time period (e.g., 1000 users/quarter)
|
||||
- **Impact**: Value per user (1=minimal, 2=low, 3=medium, 4=high, 5=massive)
|
||||
- **Confidence**: How certain are we? (100%=high, 80%=medium, 50%=low)
|
||||
- **Effort**: Person-months (e.g., 2 = 2 engineers for 1 month, or 1 engineer for 2 months)
|
||||
|
||||
**Example**:
|
||||
- Feature A: (5000 users/qtr × 3 impact × 100% confidence) / 2 effort = **7500 score**
|
||||
- Feature B: (500 users/qtr × 5 impact × 50% confidence) / 1 effort = **1250 score**
|
||||
- **Decision**: Feature A scores 6× higher despite lower per-user impact
|
||||
|
||||
**Advantages**: More nuanced than 2x2 matrix, accounts for uncertainty
|
||||
**Disadvantages**: Requires estimation of reach (hard for new features)
|
||||
|
||||
### ICE Score (Impact × Confidence × Ease)
|
||||
|
||||
**Formula**: `Score = Impact × Confidence × Ease`
|
||||
|
||||
**When to use**: Growth experiments, marketing campaigns, quick prioritization
|
||||
|
||||
**Components**:
|
||||
- **Impact**: Potential value (1-10 scale)
|
||||
- **Confidence**: How sure are we this will work? (1-10 scale)
|
||||
- **Ease**: How easy to implement? (1-10 scale, inverse of effort)
|
||||
|
||||
**Example**:
|
||||
- Experiment A: 8 impact × 9 confidence × 7 ease = **504 score**
|
||||
- Experiment B: 10 impact × 3 confidence × 5 ease = **150 score**
|
||||
- **Decision**: A scores higher due to confidence, even with lower max impact
|
||||
|
||||
**Advantages**: Simpler than RICE, no time period needed
|
||||
**Disadvantages**: Multiplicative scoring can exaggerate differences
|
||||
|
||||
### Weighted Scoring (Custom Criteria)
|
||||
|
||||
**When to use**: Complex decisions with multiple evaluation dimensions beyond effort/impact
|
||||
|
||||
**Process**:
|
||||
1. Define criteria (e.g., Revenue, Strategic Fit, User Pain, Complexity, Risk)
|
||||
2. Weight each criterion (sum to 100%)
|
||||
3. Score each item on each criterion (1-5)
|
||||
4. Calculate weighted score: `Score = Σ(criterion_score × criterion_weight)`
|
||||
|
||||
**Example**:
|
||||
|
||||
| Criteria | Weight | Feature A Score | Feature A Weighted | Feature B Score | Feature B Weighted |
|
||||
|----------|--------|----------------|-------------------|----------------|-------------------|
|
||||
| Revenue | 40% | 4 | 1.6 | 2 | 0.8 |
|
||||
| Strategic | 30% | 5 | 1.5 | 4 | 1.2 |
|
||||
| User Pain | 20% | 3 | 0.6 | 5 | 1.0 |
|
||||
| Complexity | 10% | 2 (low) | 0.2 (penalty) | 4 (high) | 0.4 (penalty) |
|
||||
| **Total** | **100%** | - | **3.9** | - | **3.0** |
|
||||
|
||||
**Decision**: Feature A scores higher (3.9 vs 3.0) due to revenue and strategic fit
|
||||
|
||||
**Advantages**: Transparent, customizable to organization's values
|
||||
**Disadvantages**: Can become analysis paralysis with too many criteria
|
||||
|
||||
### Kano Model (Customer Satisfaction)
|
||||
|
||||
**When to use**: Understanding which features delight vs must-have vs don't-matter
|
||||
|
||||
**Categories**:
|
||||
- **Must-Be (Basic)**: Absence causes dissatisfaction, presence is expected (e.g., product works, no security bugs)
|
||||
- **Performance (Linear)**: More is better, satisfaction increases linearly (e.g., speed, reliability)
|
||||
- **Delighters (Excitement)**: Unexpected features that wow users (e.g., dark mode before it was common)
|
||||
- **Indifferent**: Users don't care either way (e.g., internal metrics dashboard for end users)
|
||||
- **Reverse**: Some users actively dislike (e.g., forced tutorials, animations)
|
||||
|
||||
**Survey technique**:
|
||||
- Ask functional question: "How would you feel if we had feature X?" (Satisfied / Expected / Neutral / Tolerate / Dissatisfied)
|
||||
- Ask dysfunctional question: "How would you feel if we did NOT have feature X?"
|
||||
- Map responses to category
|
||||
|
||||
**Prioritization strategy**:
|
||||
1. **Must-Be first**: Fix broken basics (dissatisfiers)
|
||||
2. **Delighters for differentiation**: Quick wins that wow
|
||||
3. **Performance for competitiveness**: Match or exceed competitors
|
||||
4. **Avoid indifferent/reverse**: Don't waste time
|
||||
|
||||
**Example**:
|
||||
- Must-Be: Fix crash on login (everyone expects app to work)
|
||||
- Performance: Improve search speed from 2s to 0.5s
|
||||
- Delighter: Add "undo send" for emails (unexpected delight)
|
||||
- Indifferent: Add 50 new color themes (most users don't care)
|
||||
|
||||
### Value vs Complexity (Alternative Labels)
|
||||
|
||||
**When to use**: Same as effort-impact, but emphasizes business value and technical complexity
|
||||
|
||||
**Axes**:
|
||||
- **X-axis: Complexity** (technical difficulty, dependencies, unknowns)
|
||||
- **Y-axis: Value** (business value, strategic value, user value)
|
||||
|
||||
**Quadrants** (same concept, different framing):
|
||||
- **High Value, Low Complexity** = Quick Wins (same)
|
||||
- **High Value, High Complexity** = Strategic Investments (same as Big Bets)
|
||||
- **Low Value, Low Complexity** = Nice-to-Haves (same as Fill-Ins)
|
||||
- **Low Value, High Complexity** = Money Pits (same as Time Sinks)
|
||||
|
||||
**When to use this framing**: Technical audiences respond to "complexity", business audiences to "value"
|
||||
|
||||
---
|
||||
|
||||
## 2. Alternative Prioritization Models
|
||||
|
||||
### MoSCoW (Must/Should/Could/Won't)
|
||||
|
||||
**When to use**: Fixed-scope projects (e.g., product launch, migration) with deadline constraints
|
||||
|
||||
**Categories**:
|
||||
- **Must Have**: Non-negotiable, project fails without (e.g., core functionality, security, legal requirements)
|
||||
- **Should Have**: Important but not critical, defer if needed (e.g., nice UX, analytics)
|
||||
- **Could Have**: Desirable if time/budget allows (e.g., polish, edge cases)
|
||||
- **Won't Have (this time)**: Out of scope, revisit later (e.g., advanced features, integrations)
|
||||
|
||||
**Process**:
|
||||
1. List all requirements
|
||||
2. Stakeholders categorize each (force hard choices: only 60% can be Must/Should)
|
||||
3. Build Must-Haves first, then Should-Haves, then Could-Haves if time remains
|
||||
4. Communicate Won't-Haves to set expectations
|
||||
|
||||
**Example (product launch)**:
|
||||
- **Must**: User registration, core workflow, payment processing, security
|
||||
- **Should**: Email notifications, basic analytics, help docs
|
||||
- **Could**: Dark mode, advanced filters, mobile app
|
||||
- **Won't**: Integrations, API, white-labeling (v2 scope)
|
||||
|
||||
**Advantages**: Forces scope discipline, clear for deadline-driven work
|
||||
**Disadvantages**: Doesn't account for effort (may put high-effort items in Must)
|
||||
|
||||
### Cost of Delay (CD3: Cost, Duration, Delay)
|
||||
|
||||
**When to use**: Time-sensitive decisions where delaying has quantifiable revenue/strategic cost
|
||||
|
||||
**Formula**: `CD3 Score = Cost of Delay / Duration`
|
||||
- **Cost of Delay**: $/month of delaying this (revenue loss, market share, customer churn)
|
||||
- **Duration**: Months to complete
|
||||
|
||||
**Example**:
|
||||
- Feature A: $100K/mo delay cost, 2 months duration → **$50K/mo score**
|
||||
- Feature B: $200K/mo delay cost, 5 months duration → **$40K/mo score**
|
||||
- **Decision**: Feature A higher score (faster time-to-value despite lower total CoD)
|
||||
|
||||
**When to use**: Competitive markets, revenue-critical features, time-limited opportunities (e.g., seasonal)
|
||||
|
||||
**Advantages**: Explicitly values speed to market
|
||||
**Disadvantages**: Requires estimating revenue impact (often speculative)
|
||||
|
||||
### Opportunity Scoring (Jobs-to-be-Done)
|
||||
|
||||
**When to use**: Understanding which user jobs are underserved (high importance, low satisfaction)
|
||||
|
||||
**Survey**:
|
||||
- Ask users to rate each "job" on:
|
||||
- **Importance**: How important is this outcome? (1-5)
|
||||
- **Satisfaction**: How well does current solution satisfy? (1-5)
|
||||
|
||||
**Opportunity Score**: `Importance + max(Importance - Satisfaction, 0)`
|
||||
- Score ranges 0-10
|
||||
- **>8 = High opportunity** (important but poorly served)
|
||||
- **<5 = Low opportunity** (either unimportant or well-served)
|
||||
|
||||
**Example**:
|
||||
- Job: "Quickly find relevant past conversations"
|
||||
- Importance: 5 (very important)
|
||||
- Satisfaction: 2 (very dissatisfied)
|
||||
- Opportunity: 5 + (5-2) = **8 (high opportunity)** → prioritize search improvements
|
||||
|
||||
- Job: "Customize notification sounds"
|
||||
- Importance: 2 (not important)
|
||||
- Satisfaction: 3 (neutral)
|
||||
- Opportunity: 2 + 0 = **2 (low opportunity)** → deprioritize
|
||||
|
||||
**Advantages**: User-centric, identifies gaps between need and solution
|
||||
**Disadvantages**: Requires user research, doesn't account for effort
|
||||
|
||||
---
|
||||
|
||||
## 3. Stakeholder Alignment Techniques
|
||||
|
||||
### Silent Voting (Avoid Anchoring Bias)
|
||||
|
||||
**Problem**: First person to score influences others (anchoring bias), HIPPO dominates
|
||||
**Solution**: Everyone scores independently, then discuss
|
||||
|
||||
**Process**:
|
||||
1. Each stakeholder writes scores on sticky notes (don't share yet)
|
||||
2. Reveal all scores simultaneously
|
||||
3. Discuss discrepancies (why did eng score Effort=5 but product scored Effort=2?)
|
||||
4. Converge on consensus score
|
||||
|
||||
**Tools**: Planning poker (common in agile), online voting (Miro, Mural)
|
||||
|
||||
### Forced Ranking (Avoid "Everything is High Priority")
|
||||
|
||||
**Problem**: Stakeholders rate everything 4-5, no differentiation
|
||||
**Solution**: Force stack ranking (only one item can be #1)
|
||||
|
||||
**Process**:
|
||||
1. List all items
|
||||
2. Stakeholders must rank 1, 2, 3, ..., N (no ties allowed)
|
||||
3. Convert ranks to scores (e.g., top 20% = 5, next 20% = 4, middle 20% = 3, etc.)
|
||||
|
||||
**Variant: $100 Budget**:
|
||||
- Give stakeholders $100 to "invest" across all items
|
||||
- They allocate dollars based on priority ($30 to A, $25 to B, $20 to C, ...)
|
||||
- Items with most investment are highest priority
|
||||
|
||||
### Weighted Stakeholder Input (Account for Expertise)
|
||||
|
||||
**Problem**: Not all opinions are equal (eng knows effort, sales knows customer pain)
|
||||
**Solution**: Weight scores by expertise domain
|
||||
|
||||
**Example**:
|
||||
- Effort score = 100% from Engineering (they know effort best)
|
||||
- Impact score = 40% Product + 30% Sales + 30% Customer Success (all know value)
|
||||
|
||||
**Process**:
|
||||
1. Define who estimates what (effort, user impact, revenue, etc.)
|
||||
2. Assign weights (e.g., 60% engineering + 40% product for effort)
|
||||
3. Calculate weighted average: `Score = Σ(stakeholder_score × weight)`
|
||||
|
||||
### Pre-Mortem for Controversial Items
|
||||
|
||||
**Problem**: Stakeholders disagree on whether item is Quick Win or Time Sink
|
||||
**Solution**: Run pre-mortem to surface hidden risks/assumptions
|
||||
|
||||
**Process**:
|
||||
1. Assume item failed spectacularly ("We spent 6 months and it failed")
|
||||
2. Each stakeholder writes down "what went wrong" (effort blowups, impact didn't materialize)
|
||||
3. Discuss: Are these risks real? Should we adjust scores or descope?
|
||||
|
||||
**Example**:
|
||||
- Item: "Build mobile app" (scored Impact=5, Effort=3)
|
||||
- Pre-mortem reveals: "App store approval took 3 months", "iOS/Android doubled effort", "Users didn't download"
|
||||
- **Revised score**: Impact=3 (uncertain), Effort=5 (doubled for two platforms) → Time Sink, defer
|
||||
|
||||
---
|
||||
|
||||
## 4. Data-Driven Prioritization
|
||||
|
||||
### Usage Analytics (Prioritize High-Traffic Areas)
|
||||
|
||||
**When to use**: Product improvements where usage data is available
|
||||
|
||||
**Metrics**:
|
||||
- **Page views / Feature usage**: Improve high-traffic areas first (more users benefit)
|
||||
- **Conversion funnel**: Fix drop-off points with biggest impact (e.g., 50% drop at checkout)
|
||||
- **Support tickets**: High ticket volume = high user pain
|
||||
|
||||
**Example**:
|
||||
- Dashboard page: 1M views/mo, 10% bounce rate → **100K frustrated users** → high impact
|
||||
- Settings page: 10K views/mo, 50% bounce rate → **5K frustrated users** → lower impact
|
||||
- **Decision**: Fix dashboard first (20× more impact)
|
||||
|
||||
**Advantages**: Objective, quantifies impact
|
||||
**Disadvantages**: Ignores new features (no usage data yet), low-traffic areas may be high-value for specific users
|
||||
|
||||
### A/B Test Results (Validate Impact Assumptions)
|
||||
|
||||
**When to use**: Uncertain impact; run experiment to measure before committing
|
||||
|
||||
**Process**:
|
||||
1. Build minimal version of feature (1-2 weeks)
|
||||
2. A/B test with 10% of users
|
||||
3. Measure impact (conversion, retention, revenue, NPS)
|
||||
4. If impact validated, commit to full version; if not, deprioritize
|
||||
|
||||
**Example**:
|
||||
- Hypothesis: "Adding social login will increase signups 20%"
|
||||
- A/B test: 5% increase (not 20%)
|
||||
- **Decision**: Impact=3 (not 5 as assumed), deprioritize vs other items
|
||||
|
||||
**Advantages**: Reduces uncertainty, validates assumptions before big bets
|
||||
**Disadvantages**: Requires experimentation culture, time to run tests
|
||||
|
||||
### Customer Request Frequency (Vote Counting)
|
||||
|
||||
**When to use**: Feature requests from sales, support, customers
|
||||
|
||||
**Metrics**:
|
||||
- **Request count**: Number of unique customers asking
|
||||
- **Revenue at risk**: Total ARR of customers requesting (enterprise vs SMB)
|
||||
- **Churn risk**: Customers threatening to leave without feature
|
||||
|
||||
**Example**:
|
||||
- Feature A: 50 SMB customers requesting ($5K ARR each) = **$250K ARR**
|
||||
- Feature B: 2 Enterprise customers requesting ($200K ARR each) = **$400K ARR**
|
||||
- **Decision**: Feature B higher impact (more revenue at risk) despite fewer requests
|
||||
|
||||
**Guardrail**: Don't just count votes (10 vocal users ≠ real demand), weight by revenue/strategic value
|
||||
|
||||
### NPS/CSAT Drivers Analysis
|
||||
|
||||
**When to use**: Understanding which improvements drive customer satisfaction most
|
||||
|
||||
**Process**:
|
||||
1. Collect NPS/CSAT scores
|
||||
2. Ask open-ended: "What's the one thing we could improve?"
|
||||
3. Categorize feedback (performance, features, support, etc.)
|
||||
4. Correlate categories with NPS (which issues are mentioned by detractors most?)
|
||||
|
||||
**Example**:
|
||||
- Detractors (NPS 0-6) mention "slow performance" 80% of time
|
||||
- Passives (NPS 7-8) mention "missing integrations" 60%
|
||||
- **Decision**: Fix performance first (bigger impact on promoter score)
|
||||
|
||||
---
|
||||
|
||||
## 5. Roadmap Optimization
|
||||
|
||||
### Dependency Mapping (Critical Path)
|
||||
|
||||
**Problem**: Items with dependencies can't start until prerequisites complete
|
||||
**Solution**: Map dependency graph, identify critical path
|
||||
|
||||
**Process**:
|
||||
1. List all items with dependencies (A depends on B, C depends on A and D)
|
||||
2. Draw dependency graph (use tools: Miro, Mural, project management software)
|
||||
3. Identify critical path (longest chain of dependencies)
|
||||
4. Parallelize non-dependent work
|
||||
|
||||
**Example**:
|
||||
- Quick Win A (2 weeks) → Big Bet B (8 weeks) → Quick Win C (1 week) = **11 week critical path**
|
||||
- Quick Win D (2 weeks, no dependencies) can run in parallel with A
|
||||
- **Optimized timeline**: 11 weeks instead of 13 weeks (if sequential)
|
||||
|
||||
### Team Velocity and Capacity Planning
|
||||
|
||||
**Problem**: Overcommitting to more work than team can deliver
|
||||
**Solution**: Use historical velocity to forecast capacity
|
||||
|
||||
**Process**:
|
||||
1. Measure past velocity (effort points completed per sprint/quarter)
|
||||
2. Estimate total capacity (team size × utilization × time period)
|
||||
3. Don't plan >70-80% of capacity (buffer for unknowns, support, bugs)
|
||||
|
||||
**Example**:
|
||||
- Team completes 20 effort points/quarter historically
|
||||
- Next quarter roadmap: 30 effort points planned
|
||||
- **Problem**: 150% overcommitted
|
||||
- **Fix**: Cut lowest-priority items (time sinks, fill-ins) to fit 16 effort points (80% of 20)
|
||||
|
||||
**Guardrail**: If you consistently complete <50% of roadmap, estimation is broken (not just overcommitted)
|
||||
|
||||
### Incremental Delivery (Break Big Bets into Phases)
|
||||
|
||||
**Problem**: Big Bet takes 6 months; no value delivery until end
|
||||
**Solution**: Break into phases that deliver incremental value
|
||||
|
||||
**Example**:
|
||||
- **Original**: "Rebuild reporting system" (6 months, Effort=5)
|
||||
- **Phased**:
|
||||
- Phase 1: Migrate 3 most-used reports (1 month, Effort=2, Impact=3)
|
||||
- Phase 2: Add drill-down capability (1 month, Effort=2, Impact=4)
|
||||
- Phase 3: Real-time data (2 months, Effort=3, Impact=5)
|
||||
- Phase 4: Custom dashboards (2 months, Effort=3, Impact=3)
|
||||
- **Benefit**: Ship value after 1 month (not 6), can adjust based on feedback
|
||||
|
||||
**Advantages**: Faster time-to-value, reduces risk, allows pivoting
|
||||
**Disadvantages**: Requires thoughtful phasing (some work can't be incrementalized)
|
||||
|
||||
### Portfolio Balancing (Mix of Quick Wins and Big Bets)
|
||||
|
||||
**Problem**: Roadmap is all quick wins (no strategic depth) or all big bets (no momentum)
|
||||
**Solution**: Balance portfolio across quadrants and time horizons
|
||||
|
||||
**Target distribution**:
|
||||
- **70% Quick Wins + Fill-Ins** (short-term value, momentum)
|
||||
- **30% Big Bets** (long-term strategic positioning)
|
||||
- OR by time: **Now (0-3 months)**: 60%, **Next (3-6 months)**: 30%, **Later (6-12 months)**: 10%
|
||||
|
||||
**Example**:
|
||||
- Q1: 5 quick wins + 1 big bet Phase 1
|
||||
- Q2: 3 quick wins + 1 big bet Phase 2
|
||||
- Q3: 4 quick wins + 1 new big bet start
|
||||
- **Result**: Consistent value delivery (quick wins) + strategic progress (big bets)
|
||||
|
||||
---
|
||||
|
||||
## 6. Common Pitfalls and Solutions
|
||||
|
||||
### Pitfall 1: Solo Scoring (No Stakeholder Input)
|
||||
|
||||
**Problem**: PM scores everything alone, misses engineering effort or sales context
|
||||
**Solution**: Multi-stakeholder scoring session (2-hour workshop)
|
||||
|
||||
**Workshop agenda**:
|
||||
- 0-15min: Align on scoring scales (calibrate with examples)
|
||||
- 15-60min: Silent voting on effort/impact for all items
|
||||
- 60-90min: Discuss discrepancies, converge on consensus
|
||||
- 90-120min: Plot matrix, identify quadrants, sequence roadmap
|
||||
|
||||
### Pitfall 2: Analysis Paralysis (Perfect Scores)
|
||||
|
||||
**Problem**: Spending days debating if item is Effort=3.2 or Effort=3.4
|
||||
**Solution**: Good-enough > perfect; prioritization is iterative
|
||||
|
||||
**Guardrail**: Limit scoring session to 2 hours; if still uncertain, default to conservative (higher effort, lower impact)
|
||||
|
||||
### Pitfall 3: Ignoring Dependencies
|
||||
|
||||
**Problem**: Quick Win scored Effort=2, but depends on Effort=5 migration completing first
|
||||
**Solution**: Score standalone effort AND prerequisite effort separately
|
||||
|
||||
**Example**:
|
||||
- Item: "Add SSO login" (Effort=2 standalone)
|
||||
- Depends on: "Migrate to new auth system" (Effort=5)
|
||||
- **True effort**: 5 (for new roadmaps) or 2 (if migration already planned)
|
||||
|
||||
### Pitfall 4: Strategic Override ("CEO Wants It")
|
||||
|
||||
**Problem**: Exec declares item "high priority" without scoring, bypasses process
|
||||
**Solution**: Make execs participate in scoring, apply same framework
|
||||
|
||||
**Response**: "Let's score this using our framework so we can compare to other priorities. If it's truly high impact and low effort, it'll naturally rise to the top."
|
||||
|
||||
### Pitfall 5: Sunk Cost Fallacy (Continuing Time Sinks)
|
||||
|
||||
**Problem**: "We already spent 2 months on X, we can't stop now" (even if impact is low)
|
||||
**Solution**: Sunk costs are sunk; evaluate based on future effort/impact only
|
||||
|
||||
**Decision rule**: If you wouldn't start this project today knowing what you know, stop it now
|
||||
|
||||
### Pitfall 6: Neglecting Maintenance (Assuming 100% Project Capacity)
|
||||
|
||||
**Problem**: Roadmap plans 100% of team time, ignoring support/bugs/tech debt/meetings
|
||||
**Solution**: Reduce capacity by 20-50% for non-project work
|
||||
|
||||
**Realistic capacity**:
|
||||
- 100% time - 20% support/bugs - 10% meetings - 10% code review/pairing = **60% project capacity**
|
||||
- If team is 5 people × 40 hrs/wk × 12 weeks = 2400 hrs, only 1440 hrs available for roadmap
|
||||
|
||||
### Pitfall 7: Ignoring User Research (Opinion-Based Scoring)
|
||||
|
||||
**Problem**: Impact scores based on team intuition, not user data
|
||||
**Solution**: Validate impact with user research (surveys, interviews, usage data)
|
||||
|
||||
**Quick validation**:
|
||||
- Survey 50 users: "How important is feature X?" (1-5)
|
||||
- If <50% say 4-5, impact is not as high as assumed
|
||||
- Adjust scores based on data
|
||||
|
||||
### Pitfall 8: Scope Creep During Execution
|
||||
|
||||
**Problem**: Quick Win (Effort=2) grows to Big Bet (Effort=5) during implementation
|
||||
**Solution**: Timebox quick wins; if effort exceeds estimate, cut scope or defer
|
||||
|
||||
**Guardrail**: "If this takes >1 week, we stop and re-evaluate whether it's still worth it"
|
||||
|
||||
### Pitfall 9: Forgetting to Say "No"
|
||||
|
||||
**Problem**: Roadmap keeps growing (never remove items), becomes unexecutable
|
||||
**Solution**: Explicitly cut time sinks, communicate what you're NOT doing
|
||||
|
||||
**Communication template**: "We prioritized X, Y, Z based on impact/effort. This means we're NOT doing A, B, C this quarter because [reason]. We'll revisit in [timeframe]."
|
||||
|
||||
### Pitfall 10: One-Time Prioritization (Never Re-Score)
|
||||
|
||||
**Problem**: Scores from 6 months ago are stale (context changed, new data available)
|
||||
**Solution**: Re-score quarterly, adjust roadmap based on new information
|
||||
|
||||
**Triggers for re-scoring**:
|
||||
- Quarterly planning cycles
|
||||
- Major context changes (new competitor, customer churn, team size change)
|
||||
- Big bets complete (update dependent items' scores)
|
||||
- User research reveals new insights
|
||||
374
skills/prioritization-effort-impact/resources/template.md
Normal file
374
skills/prioritization-effort-impact/resources/template.md
Normal file
@@ -0,0 +1,374 @@
|
||||
# Prioritization: Effort-Impact Matrix Template
|
||||
|
||||
## Table of Contents
|
||||
1. [Workflow](#workflow)
|
||||
2. [Prioritization Matrix Template](#prioritization-matrix-template)
|
||||
3. [Scoring Table Template](#scoring-table-template)
|
||||
4. [Prioritized Roadmap Template](#prioritized-roadmap-template)
|
||||
5. [Guidance for Each Section](#guidance-for-each-section)
|
||||
6. [Quick Patterns](#quick-patterns)
|
||||
7. [Quality Checklist](#quality-checklist)
|
||||
|
||||
## Workflow
|
||||
|
||||
Copy this checklist and track your progress:
|
||||
|
||||
```
|
||||
Prioritization Progress:
|
||||
- [ ] Step 1: Gather items and clarify scoring
|
||||
- [ ] Step 2: Score effort and impact
|
||||
- [ ] Step 3: Plot matrix and identify quadrants
|
||||
- [ ] Step 4: Create prioritized roadmap
|
||||
- [ ] Step 5: Validate and communicate decisions
|
||||
```
|
||||
|
||||
**Step 1:** Collect all items to prioritize and define scoring scales. See [Scoring Table Template](#scoring-table-template) for structure.
|
||||
|
||||
**Step 2:** Rate each item on effort (1-5) and impact (1-5) with stakeholder input. See [Guidance: Scoring](#guidance-scoring) for calibration tips.
|
||||
|
||||
**Step 3:** Plot items on 2x2 matrix and categorize into quadrants. See [Prioritization Matrix Template](#prioritization-matrix-template) for visualization.
|
||||
|
||||
**Step 4:** Sequence items into roadmap (Quick Wins → Big Bets → Fill-Ins, avoid Time Sinks). See [Prioritized Roadmap Template](#prioritized-roadmap-template) for execution plan.
|
||||
|
||||
**Step 5:** Self-check quality and communicate decisions with rationale. See [Quality Checklist](#quality-checklist) for validation.
|
||||
|
||||
---
|
||||
|
||||
## Prioritization Matrix Template
|
||||
|
||||
Copy this section to create your effort-impact matrix:
|
||||
|
||||
### Effort-Impact Matrix: [Context Name]
|
||||
|
||||
**Date**: [YYYY-MM-DD]
|
||||
**Scope**: [e.g., Q1 Product Backlog, Technical Debt Items, Strategic Initiatives]
|
||||
**Participants**: [Names/roles who contributed to scoring]
|
||||
|
||||
#### Matrix Visualization
|
||||
|
||||
```
|
||||
High Impact │
|
||||
5 │ Big Bets │ Quick Wins
|
||||
│ [Item names] │ [Item names]
|
||||
4 │ │
|
||||
│ │
|
||||
3 │─────────────────────┼─────────────────
|
||||
│ │
|
||||
2 │ Time Sinks │ Fill-Ins
|
||||
│ [Item names] │ [Item names]
|
||||
1 │ │
|
||||
Low Impact │ │
|
||||
└─────────────────────┴─────────────────
|
||||
5 4 3 2 1
|
||||
High Effort Low Effort
|
||||
```
|
||||
|
||||
**Visual Plotting** (if using visual tools):
|
||||
- Create 2x2 grid (effort on X-axis, impact on Y-axis)
|
||||
- Place each item at coordinates (effort, impact)
|
||||
- Use color coding: Green=Quick Wins, Blue=Big Bets, Yellow=Fill-Ins, Red=Time Sinks
|
||||
- Add item labels or numbers for reference
|
||||
|
||||
#### Quadrant Summary
|
||||
|
||||
**Quick Wins (High Impact, Low Effort)** - Do First! ✓
|
||||
- [Item 1]: Impact=5, Effort=2 - [Brief rationale]
|
||||
- [Item 2]: Impact=4, Effort=1 - [Brief rationale]
|
||||
- **Total**: X items
|
||||
|
||||
**Big Bets (High Impact, High Effort)** - Do Second
|
||||
- [Item 3]: Impact=5, Effort=5 - [Brief rationale]
|
||||
- [Item 4]: Impact=4, Effort=4 - [Brief rationale]
|
||||
- **Total**: X items
|
||||
|
||||
**Fill-Ins (Low Impact, Low Effort)** - Do During Downtime
|
||||
- [Item 5]: Impact=2, Effort=1 - [Brief rationale]
|
||||
- [Item 6]: Impact=1, Effort=2 - [Brief rationale]
|
||||
- **Total**: X items
|
||||
|
||||
**Time Sinks (Low Impact, High Effort)** - Avoid/Defer ❌
|
||||
- [Item 7]: Impact=2, Effort=5 - [Brief rationale for why low impact]
|
||||
- [Item 8]: Impact=1, Effort=4 - [Brief rationale]
|
||||
- **Total**: X items
|
||||
- **Recommendation**: Cut scope, reject, or significantly descope these items
|
||||
|
||||
---
|
||||
|
||||
## Scoring Table Template
|
||||
|
||||
Copy this table to score all items systematically:
|
||||
|
||||
### Scoring Table: [Context Name]
|
||||
|
||||
| # | Item Name | Effort | Impact | Quadrant | Notes/Rationale |
|
||||
|---|-----------|--------|--------|----------|-----------------|
|
||||
| 1 | [Feature/initiative name] | 2 | 5 | Quick Win ✓ | [Why this score?] |
|
||||
| 2 | [Another item] | 4 | 4 | Big Bet | [Why this score?] |
|
||||
| 3 | [Another item] | 1 | 2 | Fill-In | [Why this score?] |
|
||||
| 4 | [Another item] | 5 | 2 | Time Sink ❌ | [Why low impact?] |
|
||||
| ... | ... | ... | ... | ... | ... |
|
||||
|
||||
**Scoring Scales:**
|
||||
|
||||
**Effort (1-5):**
|
||||
- **1 - Trivial**: < 1 day, one person, no dependencies, no risk
|
||||
- **2 - Small**: 1-3 days, one person or pair, minimal dependencies
|
||||
- **3 - Medium**: 1-2 weeks, small team, some dependencies or moderate complexity
|
||||
- **4 - Large**: 1-2 months, cross-team coordination, significant complexity or risk
|
||||
- **5 - Massive**: 3+ months, major initiative, high complexity/risk/dependencies
|
||||
|
||||
**Impact (1-5):**
|
||||
- **1 - Negligible**: <5% users affected, <$10K value, minimal pain relief
|
||||
- **2 - Minor**: 5-20% users, $10-50K value, nice-to-have improvement
|
||||
- **3 - Moderate**: 20-50% users, $50-200K value, meaningful pain relief
|
||||
- **4 - Major**: 50-90% users, $200K-1M value, significant competitive advantage
|
||||
- **5 - Transformative**: >90% users, $1M+ value, existential or strategic imperative
|
||||
|
||||
**Effort Dimensions (optional detail):**
|
||||
| # | Item | Time | Complexity | Risk | Dependencies | **Avg Effort** |
|
||||
|---|------|------|------------|------|--------------|----------------|
|
||||
| 1 | [Item] | 2 | 2 | 1 | 2 | **2** |
|
||||
|
||||
**Impact Dimensions (optional detail):**
|
||||
| # | Item | Users | Business Value | Strategy | Pain | **Avg Impact** |
|
||||
|---|------|-------|----------------|----------|------|----------------|
|
||||
| 1 | [Item] | 5 | 4 | 5 | 5 | **5** |
|
||||
|
||||
---
|
||||
|
||||
## Prioritized Roadmap Template
|
||||
|
||||
Copy this section to sequence items into execution plan:
|
||||
|
||||
### Prioritized Roadmap: [Context Name]
|
||||
|
||||
**Planning Horizon**: [e.g., Q1 2024, Next 6 months]
|
||||
**Team Capacity**: [e.g., 3 engineers × 80% project time = 2.4 FTE, assumes 20% support/maintenance]
|
||||
**Execution Strategy**: Quick Wins first to build momentum, then Big Bets for strategic impact
|
||||
|
||||
#### Phase 1: Quick Wins (Weeks 1-4)
|
||||
|
||||
**Objective**: Deliver visible value fast, build stakeholder confidence
|
||||
|
||||
| Priority | Item | Effort | Impact | Timeline | Owner | Dependencies |
|
||||
|----------|------|--------|--------|----------|-------|--------------|
|
||||
| 1 | [Quick Win 1] | 2 | 5 | Week 1-2 | [Name] | None |
|
||||
| 2 | [Quick Win 2] | 1 | 4 | Week 2 | [Name] | None |
|
||||
| 3 | [Quick Win 3] | 2 | 4 | Week 3-4 | [Name] | [Blocker if any] |
|
||||
|
||||
**Expected Outcomes**: [User impact, metrics improvement, stakeholder wins]
|
||||
|
||||
#### Phase 2: Big Bets (Weeks 5-16)
|
||||
|
||||
**Objective**: Tackle high-value strategic initiatives
|
||||
|
||||
| Priority | Item | Effort | Impact | Timeline | Owner | Dependencies |
|
||||
|----------|------|--------|----------|----------|-------|--------------|
|
||||
| 4 | [Big Bet 1] | 5 | 5 | Week 5-12 | [Team/Name] | Quick Win 1 complete |
|
||||
| 5 | [Big Bet 2] | 4 | 4 | Week 8-14 | [Team/Name] | External API access |
|
||||
| 6 | [Big Bet 3] | 4 | 5 | Week 12-18 | [Team/Name] | Phase 1 learnings |
|
||||
|
||||
**Expected Outcomes**: [Strategic milestones, competitive positioning, revenue impact]
|
||||
|
||||
#### Phase 3: Fill-Ins (Ongoing, Low Priority)
|
||||
|
||||
**Objective**: Batch small tasks during downtime, sprint buffers, or waiting periods
|
||||
|
||||
| Item | Effort | Impact | Timing | Notes |
|
||||
|------|--------|--------|--------|-------|
|
||||
| [Fill-In 1] | 1 | 2 | Sprint buffer | Do if capacity available |
|
||||
| [Fill-In 2] | 2 | 1 | Between phases | Nice-to-have polish |
|
||||
| [Fill-In 3] | 1 | 2 | Waiting on blocker | Quick task while blocked |
|
||||
|
||||
**Strategy**: Don't schedule these explicitly; fill gaps opportunistically
|
||||
|
||||
#### Deferred/Rejected Items (Time Sinks)
|
||||
|
||||
**Objective**: Communicate what we're NOT doing and why
|
||||
|
||||
| Item | Effort | Impact | Reason for Rejection | Reconsider When |
|
||||
|------|--------|--------|----------------------|-----------------|
|
||||
| [Time Sink 1] | 5 | 2 | Low ROI, niche use case | User demand increases 10× |
|
||||
| [Time Sink 2] | 4 | 1 | Premature optimization | Performance becomes bottleneck |
|
||||
| [Time Sink 3] | 5 | 2 | Edge case perfection | Core features stable for 6mo |
|
||||
|
||||
**Communication**: Explicitly tell stakeholders these are cut to focus resources on higher-impact work
|
||||
|
||||
#### Capacity Planning
|
||||
|
||||
**Total Planned Work**: [X effort points] across Quick Wins + Big Bets
|
||||
**Available Capacity**: [Y effort points] (team size × time × utilization)
|
||||
**Buffer**: [Z%] for unplanned work, support, bugs
|
||||
**Risk**: [High/Medium/Low] - [Explanation of capacity risks]
|
||||
|
||||
**Guardrail**: Don't exceed 70-80% of available capacity to allow for unknowns
|
||||
|
||||
---
|
||||
|
||||
## Guidance for Each Section
|
||||
|
||||
### Guidance: Scoring
|
||||
|
||||
**Get diverse input**:
|
||||
- **Engineering**: Estimates effort (time, complexity, risk, dependencies)
|
||||
- **Product**: Estimates impact (user value, business value, strategic alignment)
|
||||
- **Sales/CS**: Validates customer pain and business value
|
||||
- **Design**: Assesses UX impact and design effort
|
||||
|
||||
**Calibration session**:
|
||||
1. Score 3-5 reference items together to calibrate scale
|
||||
2. Use these as anchors: "If X is a 3, then Y is probably a 2"
|
||||
3. Document examples: "Effort=2 example: Add CSV export (2 days, one dev)"
|
||||
|
||||
**Avoid bias**:
|
||||
- ❌ **Anchoring**: First person's score influences others → use silent voting, then discuss
|
||||
- ❌ **Optimism bias**: Engineers underestimate effort → add 20-50% buffer
|
||||
- ❌ **HIPPO (Highest Paid Person's Opinion)**: Exec scores override reality → anonymous scoring first
|
||||
- ❌ **Recency bias**: Recent successes inflate confidence → review past estimates
|
||||
|
||||
**Differentiate scores**:
|
||||
- If 80% of items are scored 3, you haven't prioritized
|
||||
- Force distribution: Top 20% are 4-5, bottom 20% are 1-2, middle 60% are 2-4
|
||||
- Use ranking if needed: "Rank all items, then assign scores based on distribution"
|
||||
|
||||
### Guidance: Quadrant Interpretation
|
||||
|
||||
**Quick Wins (High Impact, Low Effort)** - Rare, valuable
|
||||
- ✓ Do these immediately
|
||||
- ✓ Communicate early wins to build momentum
|
||||
- ❌ Beware: If you have >5 quick wins, scores may be miscalibrated
|
||||
- ❓ Ask: "If this is so easy and valuable, why haven't we done it already?"
|
||||
|
||||
**Big Bets (High Impact, High Effort)** - Strategic focus
|
||||
- ✓ Schedule 1-2 big bets per quarter (don't overcommit)
|
||||
- ✓ Break into phases/milestones for incremental value
|
||||
- ✓ Start after quick wins to build team capability and stakeholder trust
|
||||
- ❌ Don't start 3+ big bets simultaneously (thrashing, context switching)
|
||||
|
||||
**Fill-Ins (Low Impact, Low Effort)** - Opportunistic
|
||||
- ✓ Batch together (e.g., "polish sprint" once per quarter)
|
||||
- ✓ Do during downtime, sprint buffers, or while blocked
|
||||
- ❌ Don't schedule explicitly (wastes planning time)
|
||||
- ❌ Don't let these crowd out big bets
|
||||
|
||||
**Time Sinks (Low Impact, High Effort)** - Avoid!
|
||||
- ✓ Explicitly reject or defer with clear rationale
|
||||
- ✓ Challenge: Can we descope to make this lower effort?
|
||||
- ✓ Communicate to stakeholders: "We're not doing X because..."
|
||||
- ❌ Don't let these sneak into roadmap due to HIPPO or sunk cost fallacy
|
||||
|
||||
### Guidance: Roadmap Sequencing
|
||||
|
||||
**Phase 1: Quick Wins First**
|
||||
- Builds momentum, team confidence, stakeholder trust
|
||||
- Delivers early value while learning about systems/users
|
||||
- Creates psychological safety for bigger risks later
|
||||
|
||||
**Phase 2: Big Bets Second**
|
||||
- Team is warmed up, systems are understood
|
||||
- Quick wins have bought goodwill for longer timeline items
|
||||
- Learnings from Phase 1 inform Big Bet execution
|
||||
|
||||
**Phase 3: Fill-Ins Opportunistically**
|
||||
- Don't schedule; do when capacity available
|
||||
- Useful for onboarding new team members (low-risk tasks)
|
||||
- Good for sprint buffers or while waiting on dependencies
|
||||
|
||||
**Dependencies:**
|
||||
- Map explicitly (item X depends on item Y completing)
|
||||
- Use critical path analysis for complex roadmaps
|
||||
- Build slack/buffer before dependent items
|
||||
|
||||
---
|
||||
|
||||
## Quick Patterns
|
||||
|
||||
### By Context
|
||||
|
||||
**Product Backlog (50+ features)**:
|
||||
- Effort: Engineering time + design + QA + deployment risk
|
||||
- Impact: User reach × pain severity × business value
|
||||
- Quick wins: UX fixes, config changes, small integrations
|
||||
- Big bets: New workflows, platform changes, major redesigns
|
||||
|
||||
**Technical Debt (30+ items)**:
|
||||
- Effort: Refactoring time + testing + migration risk
|
||||
- Impact: Developer productivity + future feature velocity + incidents prevented
|
||||
- Quick wins: Dependency upgrades, linting fixes, small refactors
|
||||
- Big bets: Architecture overhauls, language migrations, monolith → microservices
|
||||
|
||||
**Bug Triage (100+ bugs)**:
|
||||
- Effort: Debug time + fix complexity + regression risk + deployment
|
||||
- Impact: User pain × frequency × business impact (revenue/support cost)
|
||||
- Quick wins: High-frequency easy fixes, workarounds for critical bugs
|
||||
- Big bets: Complex race conditions, performance issues, architectural bugs
|
||||
|
||||
**Strategic Initiatives (10-20 ideas)**:
|
||||
- Effort: People × months + capital + dependencies
|
||||
- Impact: Revenue/cost impact + strategic alignment + competitive advantage
|
||||
- Quick wins: Process improvements, pilot programs, low-cost experiments
|
||||
- Big bets: Market expansion, platform bets, major partnerships
|
||||
|
||||
### Common Scenarios
|
||||
|
||||
**All Big Bets, No Quick Wins**:
|
||||
- Problem: Roadmap takes 6+ months for first value delivery
|
||||
- Fix: Break big bets into phases; ship incremental value
|
||||
- Example: Instead of "Rebuild platform" (6mo), do "Migrate auth" (1mo) + "Migrate users" (1mo) + ...
|
||||
|
||||
**All Quick Wins, No Strategic Depth**:
|
||||
- Problem: Delivering small wins but losing competitive ground
|
||||
- Fix: Schedule 1-2 big bets per quarter for strategic positioning
|
||||
- Balance: 70% quick wins + fill-ins, 30% big bets
|
||||
|
||||
**Too Many Time Sinks**:
|
||||
- Problem: Backlog clogged with low-value high-effort items
|
||||
- Fix: Purge ruthlessly; if impact is low, effort doesn't matter
|
||||
- Communication: "We're closing 20 low-value items to focus resources"
|
||||
|
||||
---
|
||||
|
||||
## Quality Checklist
|
||||
|
||||
Before finalizing, verify:
|
||||
|
||||
**Scoring Quality:**
|
||||
- [ ] Diverse stakeholders contributed to scores (eng, product, sales, etc.)
|
||||
- [ ] Scores are differentiated (not all 3s; use full 1-5 range)
|
||||
- [ ] Extreme scores questioned ("Why haven't we done this quick win already?")
|
||||
- [ ] Scoring rationale documented for transparency
|
||||
- [ ] Effort includes time, complexity, risk, dependencies (not just time)
|
||||
- [ ] Impact includes users, value, strategy, pain (not just one dimension)
|
||||
|
||||
**Matrix Quality:**
|
||||
- [ ] 10-20% Quick Wins (if 0%, scores miscalibrated; if 50%, too optimistic)
|
||||
- [ ] 20-30% Big Bets (strategic work, not just small tasks)
|
||||
- [ ] Time Sinks identified and explicitly cut/deferred
|
||||
- [ ] Items clustered around quadrant boundaries re-evaluated (e.g., Effort=2.5, Impact=2.5)
|
||||
- [ ] Visual matrix created (not just table) for stakeholder communication
|
||||
|
||||
**Roadmap Quality:**
|
||||
- [ ] Quick Wins scheduled first (Weeks 1-4)
|
||||
- [ ] Big Bets scheduled second (after momentum built)
|
||||
- [ ] Fill-Ins not explicitly scheduled (opportunistic)
|
||||
- [ ] Time Sinks explicitly rejected with rationale communicated
|
||||
- [ ] Dependencies mapped (item X depends on Y)
|
||||
- [ ] Capacity buffer included (don't plan 100% of capacity)
|
||||
- [ ] Timeline realistic (effort scores × team size = weeks)
|
||||
|
||||
**Communication Quality:**
|
||||
- [ ] Prioritization decisions explained (not just "we're doing X")
|
||||
- [ ] Trade-offs visible ("Doing X means not doing Y")
|
||||
- [ ] Stakeholder concerns addressed ("Sales wanted Z, but impact is low because...")
|
||||
- [ ] Success metrics defined (how will we know this roadmap succeeded?)
|
||||
- [ ] Review cadence set (re-score quarterly, adjust roadmap monthly)
|
||||
|
||||
**Red Flags to Fix:**
|
||||
- ❌ One person scored everything alone
|
||||
- ❌ All scores are 2.5-3.5 (not differentiated)
|
||||
- ❌ Zero quick wins identified
|
||||
- ❌ Roadmap is 100% big bets (unrealistic)
|
||||
- ❌ Time sinks included in roadmap (low ROI)
|
||||
- ❌ No capacity buffer (planned at 100%)
|
||||
- ❌ No rationale for why items were prioritized
|
||||
- ❌ Stakeholders disagree on scores but no discussion happened
|
||||