"skill_name": "kill-criteria-exit-ramps",
"version": "1.0",
"criteria": [
{
"name": "Upfront Definition",
"description": "Kill criteria defined before launch, not after emotional/financial investment",
"ratings": {
"1": "No kill criteria defined, or defined after project started",
"3": "Kill criteria defined at launch but not formally documented or signed",
"5": "Kill criteria defined in PRD before launch, signed by stakeholders, formally documented"
}
},
{
"name": "Objectivity",
"description": "Criteria use quantifiable metrics and thresholds, not subjective judgment",
"ratings": {
"1": "Subjective criteria (e.g., 'team feels it's not working', 'low adoption')",
"3": "Mix of quantitative and qualitative criteria, some ambiguity",
"5": "Fully objective criteria with specific numbers (e.g., '<10% conversion after 6 months', 'CAC >$200 for 3 months')"
}
},
{
"name": "Decision Rights",
"description": "Clear assignment of who makes kill decision, with escalation path",
"ratings": {
"1": "No clear decision-maker, 'team decides' or unclear ownership",
"3": "Decision-maker named but no escalation path or override process",
"5": "Specific person named as decision authority, clear escalation path, override process with limits"
}
},
{
"name": "No Goalpost Moving",
"description": "Kill criteria remain fixed; changes require formal justification and re-approval",
"ratings": {
"1": "Criteria change informally when approached, goalposts move frequently",
"3": "Criteria mostly stable but some informal adjustments without documentation",
"5": "Criteria fixed at launch, changes require written justification + senior approval + new document"
}
},
{
"name": "Sunk Cost Avoidance",
"description": "Decision based on future value, not past investment; uses pre-mortem inversion",
"ratings": {
"1": "Heavy focus on sunk costs ('invested too much to quit'), no counterfactual analysis",
"3": "Acknowledges sunk costs but also considers future, limited use of inversion techniques",
"5": "Explicitly uses pre-mortem inversion ('would we start this today?'), focuses only on future value"
}
},
{
"name": "Execution Speed",
"description": "Kill decision executed quickly (wind-down within 1 month), avoiding zombie projects",
"ratings": {
"1": "Projects linger for 3+ months after kill decision, zombie projects exist",
"3": "Wind-down takes 1-2 months, some delays but eventual completion",
"5": "Wind-down plan executed within 1 month: team reallocated, resources freed, postmortem completed"
}
},
{
"name": "Opportunity Cost Consideration",
"description": "Evaluates best alternative use of resources, quantifies opportunity cost",
"ratings": {
"1": "No consideration of alternatives, 'finish what we started' mentality",
"3": "Mentions alternatives informally but no quantification or comparison",
"5": "Explicitly compares current project to top 3 alternatives, quantifies EV/Cost ratio for each"
}
},
{
"name": "Portfolio Thinking",
"description": "Projects ranked and managed as portfolio, bottom performers killed to free resources",
"ratings": {
"1": "Projects evaluated individually, no portfolio ranking or rebalancing",
"3": "Informal portfolio view but no systematic ranking or kill threshold",
"5": "Quarterly portfolio ranking with explicit methodology, kill threshold (e.g., bottom 30%), active rebalancing"
}
},
{
"name": "Postmortem Culture",
"description": "Blameless postmortems conducted within 2 weeks, learnings shared, killing normalized",
"ratings": {
"1": "No postmortems, or blame-focused, killed projects hidden or stigmatized",
"3": "Postmortems occur but sometimes delayed, limited sharing, some stigma remains",
"5": "Blameless postmortems within 2 weeks, documented and shared widely, killing celebrated as discipline"
}
},
{
"name": "Wind-Down Planning",
"description": "Detailed wind-down plan prepared upfront, includes communication, reallocation, customer transition",
"ratings": {
"1": "No wind-down plan, ad-hoc execution when kill triggered, customers/team surprised",
"3": "Basic wind-down plan exists but incomplete (missing communication or customer transition)",
"5": "Comprehensive wind-down plan with communication timeline, team reallocation, customer transition, postmortem schedule"
}
}
],
"guidance_by_type": [
{
"type": "New Product Launch",
"focus_areas": ["Upfront Definition", "Objectivity", "Decision Rights", "Wind-Down Planning"],
"target_score": "≥4.0",
"rationale": "New products carry high uncertainty. Strong upfront kill criteria and wind-down planning prevent prolonged resource drain if product-market fit not achieved."
},
{
"type": "Feature Development",
"focus_areas": ["Objectivity", "Execution Speed", "Opportunity Cost Consideration"],
"target_score": "≥3.5",
"rationale": "Features compete for engineering resources. Clear metrics, fast kill decisions, and opportunity cost analysis ensure resources flow to highest-impact features."
},
{
"type": "R&D / Experiments",
"focus_areas": ["Upfront Definition", "Sunk Cost Avoidance", "Postmortem Culture"],
"target_score": "≥4.0",
"rationale": "Experiments should have clear success/failure criteria upfront. Avoid sunk cost trap for failed experiments; learn systematically via postmortems."
},
{
"type": "Portfolio Management",
"focus_areas": ["Portfolio Thinking", "Opportunity Cost Consideration", "No Goalpost Moving"],
"target_score": "≥4.5",
"rationale": "Managing multiple projects requires disciplined ranking, rebalancing, and adherence to kill criteria. Portfolio optimization depends on killing bottom performers."
},
{
"type": "Organizational Change",
"focus_areas": ["Postmortem Culture", "Decision Rights", "Wind-Down Planning"],
"target_score": "≥3.5",
"rationale": "Building culture around disciplined stopping requires clear governance, blameless learning, and smooth wind-downs that preserve team morale."
}
],
"guidance_by_complexity": [
{
"complexity": "Simple (single feature/experiment)",
"target_score": "≥3.5",
"priority_criteria": ["Objectivity", "Upfront Definition", "Execution Speed"],
"notes": "Focus on clear metrics defined upfront and fast execution. Complexity is low enough that informal decision rights acceptable."
},
{
"complexity": "Moderate (product/initiative with team of 3-10)",
"target_score": "≥4.0",
"priority_criteria": ["Upfront Definition", "Decision Rights", "Sunk Cost Avoidance", "Wind-Down Planning"],
"notes": "Requires formal kill criteria document, named decision-maker, and detailed wind-down plan. Team size creates reallocation complexity."
},
{
"complexity": "Complex (portfolio of 5+ projects, or multi-year initiatives)",
"target_score": "≥4.5",
"priority_criteria": ["Portfolio Thinking", "No Goalpost Moving", "Opportunity Cost Consideration", "Postmortem Culture"],
"notes": "Demands systematic portfolio management with quarterly rebalancing, strict adherence to criteria, opportunity cost analysis, and strong learning culture."
}
],
"common_failure_modes": [
{
"name": "Moving Goalposts",
"symptom": "When kill criteria approached, team extends timeline or lowers bar ('let's give it another 3 months')",
"detection": "Compare current criteria to original PRD; check for informal changes without re-approval",
"fix": "Lock criteria at launch with sign-off; require written justification + senior approval for any changes"
},
{
"name": "Sunk Cost Justification",
"symptom": "'We've invested $2M/18 months, can't quit now' even though future prospects poor",
"detection": "Listen for past-focused language ('invested', 'spent', 'too far to stop'); absence of opportunity cost analysis",
"fix": "Apply pre-mortem inversion: 'If starting today with $0, would we do this?' Focus only on future value."
},
{
"name": "Subjective Criteria",
"symptom": "Debates over whether 'low engagement' or 'poor adoption' triggers kill, no clear threshold",
"detection": "Two people evaluating same data reach different conclusions; criteria use qualitative terms",
"fix": "Quantify all criteria with specific numbers and dates (e.g., '<10% weekly active after 6 months')"
},
{
"name": "Committee Decision-Making",
"symptom": "'Team decides' or 'we'll discuss' leads to paralysis, no one willing to make tough call",
"detection": "Kill decision delayed for weeks/months despite criteria met; multiple meetings with no resolution",
"fix": "Assign single decision-maker by name in kill criteria doc; decision-maker accountable for timely call"
},
{
"name": "Zombie Projects",
"symptom": "Projects linger in 'wind-down' for 3+ months, still consuming resources (time, attention, budget)",
"detection": "Check wind-down duration; team members still partially allocated; infrastructure still running",
"fix": "Set hard deadline for wind-down (1 month max); track completion; reallocate team immediately"
},
{
"name": "Portfolio Inertia",
"symptom": "Same projects continue year over year without reevaluation; no projects killed despite poor performance",
"detection": "Portfolio composition unchanged for 2+ quarters; no active rebalancing or kill decisions",
"fix": "Implement quarterly portfolio ranking; define kill threshold (bottom 20-30%); actively rebalance"
},
{
"name": "No Postmortem",
"symptom": "Killed projects immediately forgotten; no documentation of learnings; repeat same mistakes",
"detection": "No postmortem docs; team can't articulate what went wrong; same failure patterns in new projects",
"fix": "Require postmortem within 2 weeks of kill; document and share learnings; track pattern across projects"
},
{
"name": "Stigma Around Killing",
"symptom": "Teams reluctant to propose kill; PMs hide struggles; 'failure' language used; career concerns",
"detection": "Projects linger past kill criteria; escalations delayed; teams defensive in reviews",
"fix": "Leadership celebrates disciplined stopping; share kill decisions transparently; reward early recognition"
},
{
"name": "After-the-Fact Criteria",
"symptom": "Kill criteria defined after project launched; criteria adjusted to match current performance",
"detection": "No kill criteria in original PRD; criteria added months into project; retroactive documentation",
"fix": "Make kill criteria mandatory in PRD template; gate project approval on criteria definition; sign-off required"
},
{
"name": "Ignoring Opportunity Cost",
"symptom": "Continue project because 'almost done' even though resources could create more value elsewhere",
"detection": "'80% complete' or 'just need to finish' justifications; no comparison to alternative uses",
"fix": "Quantify opportunity cost; rank portfolio by EV/Cost ratio; kill if better alternatives exist regardless of completion"
}
],
"overall_guidance": {
"excellent": "Score ≥4.5: Exemplary discipline around stopping. Clear upfront criteria, objective metrics, decisive execution, portfolio thinking, strong learning culture. Organization skilled at capital allocation through disciplined killing.",
"good": "Score 3.5-4.4: Solid kill criteria and execution. Some areas for improvement (portfolio thinking, speed, or culture) but core discipline exists. Most projects have clear criteria and timely decisions.",
"needs_improvement": "Score <3.5: Significant gaps. Likely suffering from sunk cost fallacy, zombie projects, moved goalposts, or stigma around killing. Risk of prolonged resource drain on underperformers.",
"key_principle": "The hardest and most valuable skill is knowing when to quit. Organizations that kill projects decisively outperform those that let them linger. Sunk costs are irrelevant; only future value and opportunity cost matter."
}
}

View File

@@ -0,0 +1,363 @@
# Kill Criteria & Exit Ramps: Methodology
Advanced techniques for setting kill criteria, avoiding behavioral biases, managing portfolios, and building organizational culture around disciplined stopping.
---
## 1. Sunk Cost Psychology and Behavioral Economics
### Understanding Sunk Cost Fallacy
**Definition**: Tendency to continue project based on past investment rather than future value
**Cognitive mechanisms**:
- **Loss aversion**: Losses feel 2× more painful than equivalent gains (Kahneman & Tversky)
- **Escalation of commitment**: Justifying past decisions by doubling down
- **Status quo bias**: Preference for current state over change
- **Endowment effect**: Overvaluing what we already own/built
**Common rationalizations**:
- "We've invested $2M, can't quit now" (ignoring opportunity cost)
- "Just need a little more time" (moving goalposts)
- "Too close to finishing to stop" (completion bias)
- "Team morale will suffer if we quit" (social pressure)
### Behavioral Interventions
**Pre-commitment devices**:
1. **Signed kill criteria document** before launch (removes discretion)
2. **Third-party decision maker** without sunk cost attachment
3. **Time-locked gates** with automatic NO-GO if criteria not met
4. **Financial caps** ("Will not invest more than $X total")
**Framing techniques**:
1. **Pre-mortem inversion**: "If starting today with $0, would we do this?"
2. **Opportunity cost framing**: "What else could these resources achieve?"
3. **Reverse trial**: "To CONTINUE, we need to prove X" (default = kill)
4. **Outside view**: "What would we advise another company to do?"
**Example**: Company spent $5M on enterprise sales, 3 customers in 2 years (need 50 for viability)
- **Sunk cost framing**: "We've invested $5M, can't stop now"
- **Opportunity cost framing**: "Next $5M could yield 200 SMB customers based on pilot data"
- **Pre-mortem inversion**: "If starting today, would we choose enterprise over SMB?" → No
- **Decision**: Kill enterprise sales, reallocate to SMB
### Quantifying Opportunity Cost
**Formula**: Opportunity Cost = Value of Best Alternative Value of Current Project
**Process**:
1. Identify top 3 alternatives for resources (team, budget)
2. Estimate expected value for each: EV = Σ (Probability × Payoff)
3. Rank by EV / Resource Cost ratio
4. If current project ranks below alternatives → Kill signal
**Example**: SaaS with 3 options
- **Current project** (mobile app): EV = $2M, Cost = 5 engineers × 6 months = 30 eng-months, Ratio = $67k/eng-month
- **Alternative 1** (API platform): EV = $8M, Cost = 30 eng-months, Ratio = $267k/eng-month
- **Alternative 2** (integrations): EV = $5M, Cost = 20 eng-months, Ratio = $250k/eng-month
- **Decision**: Kill mobile app (lowest ratio), reallocate to API platform (highest ratio)
---
## 2. Portfolio Management Frameworks
### Portfolio Ranking Methodologies
**Method 1: Expected Value / Resource Cost**
Formula: `Rank Score = (Revenue × Probability of Success) / (Engineer-Months × Avg Cost)`
**Steps**:
1. Estimate revenue potential for each project (pessimistic, baseline, optimistic)
2. Assign probability of success (use reference class forecasting for calibration)
3. Calculate expected value: EV = Σ (Probability × Revenue)
4. Estimate resource cost (engineer-months, budget, opportunity cost)
5. Rank by EV/Cost ratio
6. Define kill threshold (e.g., bottom 30% of portfolio)
**Method 2: Weighted Scoring Model**
Formula: `Score = Σ (Weight_i × Rating_i)`
**Dimensions** (weights sum to 100%):
- Strategic fit (30%): Alignment with company vision
- Revenue potential (25%): Market size × conversion × pricing
- Probability of success (20%): Team capability, market readiness, technical risk
- Resource efficiency (15%): ROI, payback period, opportunity cost
- Competitive urgency (10%): Time-to-market importance
**Ratings**: 1-5 scale for each dimension
**Example**:
- **Project A**: Strategic fit (4), Revenue (5), Probability (3), Efficiency (4), Urgency (5) → Score = 0.30×4 + 0.25×5 + 0.20×3 + 0.15×4 + 0.10×5 = 4.05
- **Project B**: Strategic fit (3), Revenue (3), Probability (4), Efficiency (2), Urgency (2) → Score = 0.30×3 + 0.25×3 + 0.20×4 + 0.15×2 + 0.10×2 = 3.05
- **Ranking**: A > B
**Method 3: Real Options Analysis**
Treat projects as options (right but not obligation to continue)
**Value of option**:
- **Upside**: High if market/tech uncertainty resolves favorably
- **Downside**: Limited to incremental investment at each gate
- **Flexibility value**: Ability to pivot, expand, or abandon based on new info
**Decision rule**: Continue if `Option Value > Immediate Kill Value`
**Example**: R&D project with 3 gates
- Gate 1 ($50k): Learn if technology feasible (60% chance) → Continue if yes
- Gate 2 ($200k): Learn if market demand exists (40% chance) → Continue if yes
- Gate 3 ($1M): Full launch if both tech + market validated
- **Option value**: Flexibility to kill early if tech/market fails (limits downside)
- **Immediate kill value**: $0 but foregoes learning
**Decision**: Continue through gates (option value > kill value)
### Portfolio Rebalancing Cadence
**Quarterly portfolio review**:
1. Re-rank all projects using latest data
2. Identify projects below threshold (bottom 20-30%)
3. Evaluate kill vs. pivot for bottom performers
4. Reallocate resources from killed projects to top performers
5. Document decisions and communicate transparently
**Trigger-based review** (between quarterly reviews):
- Major market change (competitor launch, regulation, economic shift)
- Significant underperformance vs. projections (>30% variance)
- Resource constraints (hiring freeze, budget cut, key person departure)
- Strategic pivot (new company direction)
---
## 3. Decision Rights Frameworks
### RACI Matrix for Kill Decisions
**Roles**:
- **Responsible (R)**: Gathers data, monitors metrics, presents to decision-maker
- **Accountable (A)**: Makes final kill decision (single person, not committee)
- **Consulted (C)**: Provides input before decision (team, stakeholders)
- **Informed (I)**: Notified after decision (broader org, customers)
**Example**:
- **Kill Criteria Met → Kill Decision**:
- Responsible: Product Manager (gathers data)
- Accountable: Product VP (makes decision)
- Consulted: Engineering Lead, Finance, CEO (input)
- Informed: Team, customers, company (notification)
**Anti-pattern**: "Team decides" (everyone has sunk cost, leads to paralysis)
### Escalation Paths
**Standard path**:
1. **Metrics tracked** → Alert if approaching kill threshold
2. **Project owner evaluates** → Presents data + recommendation to decision authority
3. **Decision authority decides** → GO, NO-GO, or PIVOT
4. **Execute decision** → If kill, wind down within 1 month
**Override path** (use sparingly):
- **Override condition**: Decision authority wants to continue despite kill criteria met
- **Override process**: Written justification, senior approval (e.g., CEO), new kill criteria with shorter timeline
- **Override limit**: Max 1 override per project (prevents repeated goal-post moving)
**Example**: Product VP wants to override kill criteria for feature with 8% adoption (threshold: 10%)
- **Justification**: "Enterprise pilot starting next month, expect 15% adoption within 60 days"
- **New criteria**: "If <12% adoption after 60 days, kill immediately (no further overrides)"
- **CEO approval**: Required for override
### Governance Mechanisms
**Pre-launch approval**:
- Kill criteria document signed by project owner, decision authority, executive sponsor
- Changes to criteria require re-approval by all signatories
**Monitoring dashboard**:
- Real-time metrics vs. kill thresholds
- Traffic light system: Green (>20% above threshold), Yellow (within 20%), Red (below threshold)
- Automated alerts when entering Yellow or Red zones
**Postmortem requirement**:
- All killed projects require postmortem within 2 weeks
- Focus: learning, not blame
- Shared with broader org to normalize killing projects
---
## 4. Postmortem Processes and Learning Culture
### Postmortem Structure
**Timing**: Within 2 weeks of kill decision (while context fresh)
**Participants**: Project team + key stakeholders (5-10 people)
**Facilitator**: Neutral person (not project owner, avoids defensiveness)
**Duration**: 60-90 minutes
**Agenda**:
1. **Project recap** (5 min): Goals, kill criteria, timeline, outcome
2. **What went well?** (15 min): Successes, positive learnings
3. **What went wrong?** (20 min): Root causes of failure (not blame)
4. **What did we learn?** (20 min): Insights, surprises, assumptions invalidated
5. **What would we do differently?** (15 min): Specific changes for future projects
6. **Action items** (10 min): How to apply learnings (process changes, skill gaps, hiring needs)
**Output**: Written doc (2-3 pages) shared with broader team
### Blameless Postmortem Techniques
**Goal**: Learn from failure without blame culture
**Techniques**:
1. **Focus on systems, not individuals**: "Why did our process allow this?" not "Who screwed up?"
2. **Assume good intent**: Team made best decisions with info available at the time
3. **Prime Directive**: "Everyone did the best job they could, given what they knew, their skills, the resources available, and the situation at hand"
4. **"How might we" framing**: Forward-looking, solutions-focused
**Red flags** (blame culture):
- Finger-pointing ("PM should have known...")
- Defensiveness ("It wasn't my fault...")
- Punishment mindset ("Someone should be held accountable...")
- Learning avoidance ("Let's just move on...")
**Example**:
- **Blame framing**: "Why didn't PM validate market demand before building?"
- **Blameless framing**: "How might we improve our discovery process to validate demand earlier with less investment?"
### Normalizing Killing Projects
**Cultural shift**: Killing projects = good (disciplined capital allocation), not bad (failure)
**Messaging**:
- **Positive framing**: "We killed 3 projects this quarter, freeing resources for winners"
- **Celebrate discipline**: Acknowledge teams for recognizing kill criteria and executing quickly
- **Success metrics**: % of portfolio actively managed (killed or pivoted) each quarter (target: 20-30%)
**Leadership behaviors**:
- CEO/VPs publicly discuss projects they killed and why
- Reward PMs who kill projects early (before major resource drain)
- Promote "disciplined stopping" as core competency in performance reviews
**Anti-patterns**:
- Hiding killed projects (creates stigma)
- Only discussing successes (survivorship bias)
- Punishing teams for "failed" projects (discourages risk-taking)
---
## 5. Advanced Topics
### Real Options Theory
**Concept**: Treat uncertain projects as financial options
**Option types**:
1. **Option to defer**: Delay investment until uncertainty resolves
2. **Option to expand**: Scale up if initial results positive
3. **Option to contract**: Scale down if results negative
4. **Option to abandon**: Kill if results very negative
5. **Option to switch**: Pivot to alternative use
**Valuation**: Black-Scholes model adapted for projects
- **Underlying asset**: NPV of project
- **Strike price**: Investment required
- **Volatility**: Uncertainty in outcomes
- **Time to expiration**: Decision window
**Application**: Continue projects with high option value (high upside, limited downside, flexibility)
### Stage-Gate Process Design
**Optimal gate structure**:
- **3-5 gates** for major initiatives
- **Investment increases** by 3-5× at each gate (e.g., $10k → $50k → $200k → $1M)
- **Success criteria tighten** at each gate (higher bar as investment grows)
**Gate design**:
- **Gate 0 (Concept)**: $0-10k, 1-2 weeks, validate problem exists
- **Gate 1 (Discovery)**: $10-50k, 4-8 weeks, validate solution direction
- **Gate 2 (MVP)**: $50-200k, 2-3 months, validate product-market fit
- **Gate 3 (Scale)**: $200k-1M, 6-12 months, validate unit economics
- **Gate 4 (Growth)**: $1M+, ongoing, optimize and scale
**Kill rates by gate** (typical):
- Gate 0 → 1: Kill 50% (cheap to kill, many bad ideas)
- Gate 1 → 2: Kill 30% (learning reveals issues)
- Gate 2 → 3: Kill 20% (product-market fit hard)
- Gate 3 → 4: Kill 10% (unit economics don't work)
### Bayesian Updating for Kill Criteria
**Process**: Update kill probability as new data arrives
**Steps**:
1. **Prior probability** of kill: P(Kill) = initial estimate (e.g., 40% based on historical kill rate)
2. **Likelihood** of data given kill: P(Data | Kill) = how likely is this data if project should be killed?
3. **Likelihood** of data given success: P(Data | Success) = how likely is this data if project will succeed?
4. **Posterior probability** using Bayes theorem: P(Kill | Data) = P(Data | Kill) × P(Kill) / P(Data)
**Example**: SaaS feature with 10% adoption target (kill if <10% after 6 months)
- **Month 3 data**: 7% adoption
- **Prior**: P(Kill) = 40% (4 in 10 similar features killed historically)
- **Likelihood**: P(7% at month 3 | Kill) = 70% (projects that get killed typically have ~7% at halfway point)
- **Likelihood**: P(7% at month 3 | Success) = 30% (successful projects typically have ~12% at halfway point)
- **Posterior**: P(Kill | 7% adoption) = (0.70 × 0.40) / [(0.70 × 0.40) + (0.30 × 0.60)] = 0.28 / 0.46 = 61%
- **Interpretation**: 61% chance this project should be killed (up from 40% prior)
- **Action**: Evaluate closely, prepare pivot/kill plan
### Stopping Rules in Scientific Research
**Clinical trial stopping rules** (adapted for product development):
1. **Futility stopping**: Stop early if interim data shows unlikely to reach success criteria
- **Rule**: If <10% chance of reaching target at current trajectory → Stop
- **Application**: Monitor weekly, project trajectory, stop if trajectory misses by >30%
2. **Efficacy stopping**: Stop early if interim data shows clear success (reallocate resources)
- **Rule**: If >95% confident success criteria will be met → Graduate early
- **Application**: Feature with 25% adoption at month 3 (target: 15% at month 6) → Graduate to core product
3. **Safety stopping**: Stop if harmful unintended consequences detected
- **Rule**: If churn increases >20% or NPS drops >10 points → Stop immediately
- **Application**: New feature causing user confusion, support ticket spike → Kill
**Example**: Mobile app experiment
- **Target**: 20% weekly active users at month 6
- **Month 2 data**: 5% weekly active
- **Trajectory**: Projecting 10% at month 6 (50% below target)
- **Futility analysis**: 95% confidence interval for month 6: 8-12% (entirely below 20% target)
- **Decision**: Invoke futility stopping, kill experiment at month 2 (save 4 months)
---
## Key Principles Summary
1. **Set kill criteria before launch** (remove emotion, politics, sunk cost bias)
2. **Make criteria objective** (numbers, dates, not feelings)
3. **Assign clear decision rights** (single decision-maker, not committee)
4. **Don't move goalposts** (criteria are fixed; changes require formal process)
5. **Sunk costs are irrelevant** (only future value matters)
6. **Kill quickly** (wind down within 1 month, avoid zombie projects)
7. **Opportunity cost > sunk cost** (kill even if "almost done" if better options exist)
8. **Normalize killing** (celebrate discipline, share learnings, remove stigma)
9. **Portfolio thinking** (rank all projects, kill bottom 20-30% regularly)
10. **Learn from kills** (blameless postmortems, apply insights to future projects)
---
## Common Mistakes and Solutions
| Mistake | Symptom | Solution |
|---------|---------|----------|
| **Setting criteria after launch** | Goalposts move when results disappoint | Document criteria in PRD before launch, get sign-off |
| **Subjective criteria** | Debate over "low engagement" | Quantify: "<10% weekly active", not "poor adoption" |
| **Team consensus for kill** | Paralysis, no one wants to kill | Single decision-maker with clear authority |
| **Sunk cost justification** | "Invested $2M, can't quit" | Pre-mortem inversion: "Would we start this today?" |
| **Zombie projects** | Lingering for 6+ months | Wind down within 1 month of kill decision |
| **Stigma around killing** | Teams hide struggles, delay kill | Celebrate kills, share postmortems, normalize stopping |
| **Portfolio inertia** | Same projects year over year | Quarterly ranking + kill bottom 20-30% |
| **No postmortem** | Repeat same mistakes | Require postmortem within 2 weeks, share learnings |

View File

@@ -0,0 +1,373 @@
# Kill Criteria & Exit Ramps Templates
Quick-start templates for defining kill criteria, go/no-go gates, pivot/kill decisions, and wind-down plans.
---
## Template 1: Kill Criteria Document (Pre-Launch)
**When to use**: Before starting new project, feature, or product
### Kill Criteria Document Template
**Project Name**: [Project name]
**Project Owner**: [Name, role]
**Start Date**: [Date]
**Kill Decision Authority**: [Specific person who makes kill decision, e.g., "Product VP"]
**Escalation Path**: [Who can override, e.g., "CEO can override with written justification"]
---
### Success Metrics
**Primary Success Metric**: [Quantifiable metric, e.g., "20% conversion rate"]
**Secondary Success Metrics** (if applicable):
- [Metric 2, e.g., "NPS >40"]
- [Metric 3, e.g., "CAC <$100"]
**Time Horizon**: [Evaluation period, e.g., "6 months post-launch"]
---
### Kill Criteria
**Kill Criterion 1** (Primary):
- **Metric**: [What to measure, e.g., "Conversion rate"]
- **Threshold**: [Trigger value, e.g., "<10%"]
- **Time**: [When to evaluate, e.g., "6 months post-launch"]
- **Action**: If threshold met → Kill project
**Kill Criterion 2** (Secondary, if applicable):
- **Metric**: [e.g., "CAC"]
- **Threshold**: [e.g., ">$200"]
- **Time**: [e.g., "3 months post-launch"]
- **Action**: If threshold met → Evaluate pivot or kill
**Kill Criterion 3** (Time-based):
- **Metric**: [e.g., "Profitability"]
- **Threshold**: [e.g., "Not profitable"]
- **Time**: [e.g., "By Month 18"]
- **Action**: If threshold met → Kill project
---
### Pivot Criteria (Optional)
**Pivot Criterion 1**:
- **Metric**: [e.g., "Conversion rate"]
- **Threshold**: [e.g., "10-15% (between kill and success)"]
- **Time**: [e.g., "6 months post-launch"]
- **Action**: If threshold met → Evaluate pivot options
**Pivot Options to Consider** (if pivot triggered):
- [ ] Option 1: [e.g., "Target different customer segment"]
- [ ] Option 2: [e.g., "Change pricing model"]
- [ ] Option 3: [e.g., "Shift go-to-market strategy"]
---
### Monitoring Plan
**Tracking Frequency**: [How often to review metrics, e.g., "Weekly dashboard, monthly review"]
**Dashboard Owner**: [Who maintains dashboard, e.g., "Product Analyst"]
**Review Meetings**: [When to formally review, e.g., "Monthly project review"]
**Alert Thresholds**: [When to notify decision-maker, e.g., "Alert if conversion <12% (approaching kill threshold)"]
---
### Wind-Down Plan (If Kill Triggered)
See **Template 5: Wind-Down Plan** for detailed execution checklist.
---
### Signatures (Pre-Launch Approval)
- **Project Owner**: ________________ Date: ______
- **Decision Authority**: ________________ Date: ______
**Note**: Changes to kill criteria after launch require re-approval.
---
## Template 2: Go/No-Go Gate Assessment
**When to use**: At milestone gates during multi-stage project
### Go/No-Go Gate Template
**Project Name**: [Project name]
**Gate Number**: [e.g., "Gate 2: MVP"]
**Gate Date**: [Date]
**Decision Authority**: [Who makes go/no-go decision]
---
### Gate Success Criteria (Defined at Previous Gate)
1. **Criterion 1**: [e.g., "40% weekly active users among 50 beta users"]
- **Target**: 40%
- **Actual Result**: [X]%
- **Met?**: ☐ Yes ☐ No
2. **Criterion 2**: [e.g., "NPS >30"]
- **Target**: >30
- **Actual Result**: [X]
- **Met?**: ☐ Yes ☐ No
3. **Criterion 3**: [e.g., "CAC <$150"]
- **Target**: <$150
- **Actual Result**: $[X]
- **Met?**: ☐ Yes ☐ No
---
### Overall Gate Assessment
**Criteria Met**: [X] out of [Y] criteria met
**Business Case Review**:
- **Original Business Case**: [Revenue projection, strategic rationale]
- **Current Business Case**: [Has it changed? Still valid?]
- **Changes**: [Any significant changes in market, competition, resources?]
**Alternative Opportunities**:
- **Alternative 1**: [Other project/opportunity] — Expected value: [X]
- **Alternative 2**: [Other project/opportunity] — Expected value: [X]
- **This Project**: Expected value: [X]
- **Ranking**: [Is this project still best use of resources?]
---
### Gate Decision
**Decision**: ☐ **GO** (Continue to next stage) ☐ **NO-GO** (Kill project) ☐ **PIVOT** (Change approach)
**Rationale**: [1-2 paragraph explanation of decision]
**Next Stage Investment** (if GO):
- **Budget**: $[X]
- **Timeline**: [X months]
- **Team Size**: [X people]
- **Next Gate**: [Date and success criteria for next gate]
**Kill Actions** (if NO-GO):
- [ ] Wind down within [timeframe]
- [ ] Reallocate team to [project]
- [ ] Postmortem scheduled for [date]
**Pivot Plan** (if PIVOT):
- **Pivot Direction**: [What changes?]
- **Hypothesis**: [What are we testing?]
- **Timeline**: [How long to test pivot?]
- **Success Criteria**: [What success looks like for pivot]
**Decision Authority**: ________________ Date: ______
---
## Template 3: Pivot vs. Kill Decision Framework
**When to use**: Project not meeting targets, deciding whether to pivot or kill
### Pivot vs. Kill Assessment
**Project Name**: [Project name]
**Assessment Date**: [Date]
**Current Status**: [Brief summary of current state]
---
### Assessment Factors
| Factor | Pivot Score (1-5) | Kill Score (1-5) | Notes |
|--------|-------------------|------------------|-------|
| **Customer Pain** | ☐ Real pain, wrong solution (5) | ☐ No pain, nice-to-have (1) | [Evidence] |
| **Market Size** | ☐ Large enough (5) | ☐ Too small (1) | [TAM estimate] |
| **Learning Rate** | ☐ High insights (5) | ☐ Low, stuck (1) | [Discoveries per week] |
| **Burn Rate** | ☐ Sustainable (5) | ☐ Too high (1) | [Monthly burn vs. runway] |
| **Team Belief** | ☐ Believes in vision (5) | ☐ Doesn't believe (1) | [Team sentiment] |
| **Opportunity Cost** | ☐ Still best option (5) | ☐ Better options exist (1) | [Alternatives] |
| **Execution vs. Hypothesis** | ☐ Hypothesis valid, execution wrong (5) | ☐ Hypothesis invalid (1) | [Root cause analysis] |
**Total Pivot Score**: [Sum] / 35
**Total Kill Score**: [Sum] / 35
---
### Pre-Mortem Inversion Test
**Question**: "If we were starting today with $0 invested and zero sunk cost, would we start this project?"
**Yes, exactly as-is****CONTINUE** (no pivot needed)
**Yes, but differently****PIVOT** (describe how:_____________________)
**No****KILL** (reallocate resources)
---
### Decision
**Decision**: ☐ **CONTINUE****PIVOT****KILL**
**Rationale**: [Explanation based on factors above]
**If PIVOT**:
- **Pivot Hypothesis**: [What changes and why]
- **Pivot Timeline**: [How long to test]
- **Pivot Success Criteria**: [What success looks like]
- **Pivot Kill Criteria**: [If pivot doesn't work, when to kill]
**If KILL**:
- **Wind-Down Timeline**: [X weeks/months]
- **Resource Reallocation**: [Where team/budget goes]
- **Postmortem Date**: [When to conduct postmortem]
**Decision Authority**: ________________ Date: ______
---
## Template 4: Portfolio Kill Criteria
**When to use**: Managing multiple projects, need to kill some to focus
### Portfolio Ranking & Kill Decision
**Portfolio Review Date**: [Date]
**Decision Authority**: [Who makes portfolio decisions]
**Capacity**: [How many projects can we support? e.g., "5 projects"]
---
### Project Ranking
| Rank | Project | Expected Value (EV) | Resource Cost (RC) | EV/RC Ratio | Status |
|------|---------|---------------------|-------------------|-------------|--------|
| 1 | [Project A] | $[X]M | [Y] FTEs | [X/Y] | ✓ Keep |
| 2 | [Project B] | $[X]M | [Y] FTEs | [X/Y] | ✓ Keep |
| 3 | [Project C] | $[X]M | [Y] FTEs | [X/Y] | ✓ Keep |
| 4 | [Project D] | $[X]M | [Y] FTEs | [X/Y] | ✓ Keep |
| 5 | [Project E] | $[X]M | [Y] FTEs | [X/Y] | ✓ Keep |
| **6** | **[Project F]** | **$[X]M** | **[Y] FTEs** | **[X/Y]** | **← Kill line** |
| 7 | [Project G] | $[X]M | [Y] FTEs | [X/Y] | ✗ Kill |
| 8 | [Project H] | $[X]M | [Y] FTEs | [X/Y] | ✗ Kill |
**Ranking Methodology**: [How EV calculated, e.g., "(Revenue × Probability) / Resource Cost"]
**Kill Threshold**: Projects ranked below [X] get killed
---
### Projects to Kill (Example)
**[Project Name]**:
- **Status**: [e.g., "80% complete"] | **Sunk Cost**: $[X] | **Expected Value**: $[Z]
- **Why Kill**: [Rationale, e.g., "Opportunity cost — reallocating to Project A yields 2× more value"]
- **Wind-Down**: [Timeline] | **Team Reallocation**: [X FTEs] → [Projects]
**Decision Authority**: ________________ Date: ______
---
## Template 5: Wind-Down Plan
**When to use**: Kill decision made, need to execute wind-down
### Project Wind-Down Checklist
**Project Name**: [Project name]
**Kill Decision Date**: [Date]
**Wind-Down Owner**: [Person responsible for executing wind-down]
**Target Wind-Down Completion**: [Date, ideally <1 month]
---
### Communication (Week 1)
- [ ] **Team**: Notify within 1 week ([Decision authority + owner], focus on learning not blame)
- [ ] **Stakeholders**: Notify exec team, adjacent teams ([Project owner])
- [ ] **Customers** (if applicable): Migration plan, support timeline, refund policy ([Customer success])
---
### Team & Technical Transition (Weeks 2-4)
- [ ] **1-on-1s**: Discuss next roles, reallocation plan (Week 2, [Manager])
- [ ] **Knowledge Transfer**: Document learnings, tech docs, research insights (Week 2-3, [Team])
- [ ] **Code Archive**: Archive repository at [Location] (Week 3, [Tech lead])
- [ ] **Infrastructure**: Shutdown servers, cancel services, save $[X]/month (Week 4, [DevOps])
- [ ] **Data**: Backup critical data, ensure GDPR compliance (Week 3, [Tech lead])
---
### Customer Transition (if applicable)
- [ ] **Migration**: [X months timeline] to [Alternative product], support until [date]
- [ ] **Refunds**: Pro-rated refunds for annual customers within [X weeks]
- [ ] **Sunset**: Support ends [date], then [full deprecation]
---
### Postmortem (Week 3-4)
- [ ] **Schedule**: Within 2 weeks ([Date], [Team + stakeholders], [Neutral facilitator])
- [ ] **Agenda**: What worked? What didn't? Learnings? Apply to future?
- [ ] **Document**: Write postmortem doc ([Facilitator]), share with team (learning focus)
- [ ] **Celebrate**: Acknowledge disciplined stopping frees resources for winners
---
### Budget & Metrics
**Sunk Cost**: $[Total spent]
**Remaining Budget Saved**: $[Budget that would have been spent if continued]
**Resources Freed**: [X FTEs, $Y budget]
**Reallocated To**: [List projects receiving resources]
**Time to Wind-Down**: [Actual weeks from decision to completion]
---
### Completion Checklist
- [ ] Team reallocated | [ ] Infrastructure shutdown | [ ] Customers transitioned
- [ ] Postmortem shared | [ ] Budget reallocated | [ ] Project marked "Killed"
---
**Wind-Down Owner Signature**: ________________ Date: ______
---
## Quick Reference: When to Use Each Template
| Template | Use Case | Timing |
|----------|----------|--------|
| **Kill Criteria Document** | New project starting | Before launch |
| **Go/No-Go Gate Assessment** | Milestone decision point | At each gate |
| **Pivot vs. Kill Decision** | Project not meeting targets | When struggling |
| **Portfolio Kill Criteria** | Managing multiple projects | Quarterly or as needed |
| **Wind-Down Plan** | Kill decision made | After kill decision |