name: ln-350-story-test-planner
|
||||
description: Plans Story test task by Risk-Based Testing after manual testing. Calculates priorities, selects E2E/Integration/Unit, delegates to ln-311-task-creator. Invoked by ln-340-story-quality-gate.
|
||||
---
|
||||
|
||||
# Test Task Planner
|
||||
|
||||
Creates final Story task with comprehensive test coverage (Unit/Integration/E2E) PLUS existing test fixes, infrastructure updates, documentation, and legacy cleanup based on REAL manual testing results.
|
||||
|
||||
## When to Use This Skill
|
||||
|
||||
This skill should be used when:
|
||||
- **Invoked by ln-340-story-quality-gate Pass 1** after manual functional testing PASSED
|
||||
- **Invocation method:** Use Skill tool with command: `Skill(command: "ln-350-story-test-planner")`
|
||||
- All implementation tasks in Story are Done
|
||||
- Manual testing results documented in Linear comment
|
||||
- Create final Story task covering: tests, test fixes, infrastructure, documentation, legacy cleanup
|
||||
|
||||
**Prerequisites:**
|
||||
- All implementation Tasks in Story status = Done
|
||||
- ln-340-story-quality-gate Pass 1 completed manual testing
|
||||
- Manual test results in Linear comment (created by ln-340-story-quality-gate Phase 3 step 4)
|
||||
|
||||
**Automation:** Supports `autoApprove: true` (default when invoked by ln-340-story-quality-gate) to skip manual confirmation and run unattended.
|
||||
|
||||
## When NOT to Use
|
||||
|
||||
Do NOT use if:
|
||||
- Manual testing NOT completed → Wait for ln-340-story-quality-gate Pass 1
|
||||
- Manual test results NOT in Linear comment → ln-340-story-quality-gate must document first
|
||||
- Implementation tasks NOT all Done → Complete impl tasks first
|
||||
|
||||
## How It Works
|
||||
|
||||
### Phase 1: Discovery (Automated)
|
||||
|
||||
Auto-discovers Team ID from `docs/tasks/kanban_board.md` (see CLAUDE.md "Configuration Auto-Discovery").
|
||||
|
||||
**Input:** Story ID from user (e.g., US001, API-42)
|
||||
|
||||
### Phase 2: Story + Tasks Analysis (NO Dialog)
|
||||
|
||||
**Step 0: Study Project Test Files**
|
||||
1. Scan for test-related files:
|
||||
- tests/README.md (commands, setup, environment)
|
||||
- Test configs (jest.config.js, vitest.config.ts, pytest.ini)
|
||||
- Existing test structure (tests/, __tests__/ directories)
|
||||
- Coverage config (.coveragerc, coverage.json)
|
||||
2. Extract: test commands, framework, patterns, coverage thresholds
|
||||
3. Ensures test planning aligns with project practices
|
||||
|
||||
**Step 1: Load Manual Test Results**
|
||||
1. Fetch Story from Linear (must have label "user-story")
|
||||
2. Extract Story.id (UUID) - ⚠️ Use UUID, NOT short ID (required for Linear API)
|
||||
3. Load manual test results comment (format: ln-343-manual-tester Format v1.0)
|
||||
- Search for the header containing "Manual Testing Results" (see `ln-343-manual-tester/references/test_result_format_v1.md`)
|
||||
- If not found → ERROR: Run ln-340-story-quality-gate Pass 1 first
|
||||
4. Parse sections: AC results (PASS/FAIL), Edge Cases, Error Handling, Integration flows
|
||||
5. Map to test design: PASSED AC → E2E, Edge cases → Unit, Errors → Error handling, Flows → Integration
|
||||
|
||||
**Step 2: Analyze Story + Tasks**
|
||||
1. Parse Story: Goal, Test Strategy, Technical Notes
|
||||
2. Fetch **all child Tasks** (parentId = Story.id, status = Done) from Linear
|
||||
3. Analyze each Task:
|
||||
- Components implemented
|
||||
- Business logic added
|
||||
- Integration points created
|
||||
- Conditional branches (if/else/switch)
|
||||
4. Identify what needs testing
|
||||
|
||||
### Phase 3: Parsing Strategy for Manual Test Results
|
||||
|
||||
**Process:** Locate Linear comment with the "Manual Testing Results" header described in `ln-343-manual-tester/references/test_result_format_v1.md` → Verify Format Version 1.0 → Extract structured sections (Acceptance Criteria, Test Results by AC, Edge Cases, Error Handling, Integration Testing) using regex → Validate (at least 1 PASSED AC, AC count matches Story, completeness check) → Map parsed data to test design structure
|
||||
|
||||
**Error Handling:** Missing comment → ERROR (run ln-340-story-quality-gate Pass 1 first), Missing format version → WARNING (try legacy parsing), Required section missing → ERROR (re-run ln-340-story-quality-gate), No PASSED AC → ERROR (fix implementation)
|
||||
|
||||
### Phase 4: Risk-Based Test Planning (Automated)
|
||||
|
||||
**Reference:** See `references/risk_based_testing_guide.md` for complete methodology (Business Impact/Probability tables, detailed decision trees, anti-patterns with code examples).
|
||||
|
||||
**E2E-First Approach:** Prioritize by business risk (Priority = Impact × Probability), not coverage metrics.
|
||||
|
||||
**Workflow:**
|
||||
|
||||
**Step 1: Risk Assessment**
|
||||
|
||||
Calculate Priority for each scenario from manual testing:
|
||||
|
||||
```
|
||||
Priority = Business Impact (1-5) × Probability (1-5)
|
||||
```
|
||||
|
||||
**Decision Criteria:**
|
||||
- Priority ≥15 → **MUST test**
|
||||
- Priority 9-14 → **SHOULD test** if not covered
|
||||
- Priority ≤8 → **SKIP** (manual testing sufficient)
|
||||
|
||||
*See guide: Business Impact Table, Probability Table, Priority Matrix 5×5*
|
||||
|
||||
**Step 2: E2E Test Selection (2-5):** Baseline 2 (positive + negative) ALWAYS + 0-3 additional (Priority ≥15 only)
|
||||
|
||||
**Step 3: Unit Test Selection (0-15):** DEFAULT 0. Add ONLY for complex business logic (Priority ≥15): financial, security, algorithms
|
||||
|
||||
**Step 4: Integration Test Selection (0-8):** DEFAULT 0. Add ONLY if E2E gaps AND Priority ≥15: rollback, concurrency, external API errors
|
||||
|
||||
**Step 5: Validation:** Limits 2-28 total (realistic goal: 2-7). Auto-trim if >7 (keep 2 baseline + top 5 by Priority)
|
||||
|
||||
**Decision criteria details in guide:** Justification Checks, MANDATORY SKIP lists, Anti-Framework Rule
|
||||
|
||||
### Phase 5: Test Task Generation (Automated)
|
||||
|
||||
Generates complete Story Finalizer test task per `test_task_template.md` (11 sections):
|
||||
|
||||
**Sections 1-7:** Context, Risk Matrix, E2E/Integration/Unit Tests (with Priority scores + justifications), Coverage, DoD
|
||||
|
||||
**Section 8:** Existing Tests to Fix (analysis of affected tests from implementation tasks)
|
||||
|
||||
**Section 9:** Infrastructure Changes (packages, Docker, configs - based on test dependencies)
|
||||
|
||||
**Section 10:** Documentation Updates (README, CHANGELOG, tests/README, config docs)
|
||||
|
||||
**Section 11:** Legacy Code Cleanup (deprecated patterns, backward compat, dead code)
|
||||
|
||||
Shows preview for review.
|
||||
|
||||
### Phase 6: Confirmation & Delegation
|
||||
|
||||
**Step 1:** Preview generated test plan (always displayed for transparency)
|
||||
|
||||
**Step 2:** Confirmation logic:
|
||||
- **autoApprove: true** (default for ln-340-story-quality-gate) → proceed automatically with no user input
|
||||
- **Manual run** → prompt user to type "confirm" after reviewing the preview
|
||||
|
||||
**Step 3:** Check for existing test task
|
||||
|
||||
Query Linear: `list_issues(parentId=Story.id, labels=["tests"])`
|
||||
|
||||
**Decision:**
|
||||
- **Count = 0** → **CREATE MODE** (Step 4a)
|
||||
- **Count ≥ 1** → **REPLAN MODE** (Step 4b)
|
||||
|
||||
**Step 4a: CREATE MODE** (if Count = 0)
|
||||
|
||||
Invoke ln-311-task-creator worker with taskType: "test"
|
||||
|
||||
**Pass to worker:**
|
||||
- taskType, teamId, storyData (Story.id, title, AC, Technical Notes, Context)
|
||||
- manualTestResults (parsed from Linear comment)
|
||||
- testPlan (e2eTests, integrationTests, unitTests, riskPriorityMatrix)
|
||||
- infrastructureChanges, documentationUpdates, legacyCleanup
|
||||
|
||||
**Worker returns:** Task URL + summary
|
||||
|
||||
**Step 4b: REPLAN MODE** (if Count ≥ 1)
|
||||
|
||||
Invoke ln-312-task-replanner worker with taskType: "test"
|
||||
|
||||
**Pass to worker:**
|
||||
- Same data as CREATE MODE + existingTaskIds
|
||||
|
||||
**Worker returns:** Operations summary + warnings
|
||||
|
||||
**Step 5:** Return summary to user
|
||||
- CREATE MODE: "Test task created. Linear URL: [...]"
|
||||
- REPLAN MODE: "Test task updated. Operations executed."
|
||||
|
||||
---
|
||||
|
||||
## Definition of Done
|
||||
|
||||
Before completing work, verify ALL checkpoints:
|
||||
|
||||
**✅ Manual Testing Results Parsed:**
|
||||
- [ ] Linear comment "## 🧪 Manual Testing Results" found and parsed successfully
|
||||
- [ ] Format Version 1.0 validated
|
||||
- [ ] All required sections extracted: AC, Test Results by AC, Edge Cases, Error Handling, Integration Testing
|
||||
- [ ] At least 1 AC marked as PASSED (cannot create test task if all AC failed)
|
||||
|
||||
**✅ Risk-Based Test Plan Generated:**
|
||||
- [ ] Risk Priority Matrix calculated for all scenarios (Business Impact × Probability)
|
||||
- [ ] E2E tests (2-5): Baseline 2 (positive/negative) + additional 0-3 with Priority ≥15 AND justification
|
||||
- [ ] Integration tests (0-8): ONLY if E2E doesn't cover AND Priority ≥15 AND justification provided
|
||||
- [ ] Unit tests (0-15): ONLY complex business logic with Priority ≥15 AND justification for each test
|
||||
- [ ] **Total tests: 2-7 realistic goal** (hard limit: 2-28) - auto-trimmed if exceeds 7
|
||||
- [ ] No test duplication: Each test adds unique business value
|
||||
- [ ] No framework/library testing: Each test validates OUR business logic only
|
||||
|
||||
**✅ Story Finalizer Task Description Complete (11 sections):**
|
||||
- [ ] Section 1 - Context: Story link, why final task needed
|
||||
- [ ] Section 2 - Risk Priority Matrix: All scenarios with calculated Priority (Impact × Probability)
|
||||
- [ ] Section 3 - E2E Tests (2-5 max): Baseline 2 + additional 0-3 with Priority ≥15 AND justification, based on ACTUAL manual testing
|
||||
- [ ] Section 4 - Integration Tests (0-8 max): ONLY if E2E doesn't cover AND Priority ≥15 AND justification
|
||||
- [ ] Section 5 - Unit Tests (0-15 max): ONLY complex business logic with Priority ≥15 AND justification for EACH test
|
||||
- [ ] Section 6 - Critical Path Coverage: What MUST be tested (Priority ≥15) vs what skipped (≤14)
|
||||
- [ ] Section 7 - Definition of Done: All tests pass, Priority ≥15 scenarios tested, **realistic goal 2-7 tests** (max 28), no flaky tests, each test beyond baseline 2 justified
|
||||
- [ ] Section 8 - Existing Tests to Fix/Update: Affected tests + reasons + required fixes
|
||||
- [ ] Section 9 - Infrastructure Changes: Packages, Docker, configs to update
|
||||
- [ ] Section 10 - Documentation Updates: tests/README, README, CHANGELOG, other docs
|
||||
- [ ] Section 11 - Legacy Code Cleanup: Workarounds, backward compat, deprecated patterns, dead code
|
||||
|
||||
**✅ Worker Delegation Executed:**
|
||||
- [ ] Checked for existing test task in Linear (labels=["tests"])
|
||||
- [ ] CREATE MODE (if count = 0): Delegated to ln-311-task-creator with taskType: "test"
|
||||
- [ ] REPLAN MODE (if count ≥ 1): Delegated to ln-312-task-replanner with taskType: "test"
|
||||
- [ ] All required data passed to worker:
|
||||
- taskType, teamId, storyData (AC, Technical Notes, Context)
|
||||
- manualTestResults (parsed from Linear comment)
|
||||
- testPlan (e2eTests, integrationTests, unitTests, riskPriorityMatrix)
|
||||
- infrastructureChanges, documentationUpdates, legacyCleanup
|
||||
|
||||
**✅ Worker Completed Successfully:**
|
||||
- [ ] ln-311-task-creator: Test task created in Linear + kanban_board.md updated
|
||||
- [ ] ln-312-task-replanner: Operations executed + kanban_board.md updated
|
||||
- [ ] Linear Issue URL returned from worker
|
||||
|
||||
**✅ Confirmation Handling:**
|
||||
- [ ] Preview displayed (automation logs still capture full plan)
|
||||
- [ ] Confirmation satisfied: autoApprove: true supplied or user typed "confirm" after manual review
|
||||
|
||||
**Output:**
|
||||
- **CREATE MODE:** Linear Issue URL + confirmation message ("Created test task for Story US00X")
|
||||
- **REPLAN MODE:** Operations summary + URLs ("Test task updated. X operations executed.")
|
||||
|
||||
---
|
||||
|
||||
## Example Usage
|
||||
|
||||
**Context:**
|
||||
- ln-340-story-quality-gate Pass 1 completed manual testing
|
||||
- Manual test results in Linear comment (3 AC PASSED, 2 edge cases discovered, error handling verified)
|
||||
|
||||
**Invocation (by ln-340-story-quality-gate via Skill tool):**
|
||||
```
|
||||
Skill(skill: "ln-350-story-test-planner", storyId: "US001")
|
||||
```
|
||||
|
||||
**Execution (NO questions):**
|
||||
1. Discovery → Team "API", Story: US001
|
||||
2. Load Manual Test Results → Parse Linear comment (3 scenarios PASSED, 2 edge cases, 1 error scenario)
|
||||
3. Analysis → Story + 5 Done implementation Tasks
|
||||
4. Risk-Based Test Planning with Minimum Viable Testing:
|
||||
- Calculate Priority for each scenario (Business Impact × Probability)
|
||||
- E2E: 2 baseline tests (positive + negative for main endpoint) + 1 additional (critical edge case with Priority 20)
|
||||
- Integration: 0 tests (2 baseline E2E cover full stack)
|
||||
- Unit: 2 tests (tax calculation + discount logic with Priority ≥15)
|
||||
- **Total: 5 tests (within realistic goal 2-7)**
|
||||
- Auto-trim: Skipped 3 scenarios with Priority ≤14 (manual testing sufficient)
|
||||
5. Impact Analysis:
|
||||
- Existing Tests: 2 test files need updates (mock responses changed)
|
||||
- Infrastructure: Add Playwright for UI E2E tests
|
||||
- Documentation: Update tests/README.md, main README.md
|
||||
- Legacy Cleanup: Remove deprecated API v1 compatibility shim
|
||||
6. Generation → Complete story finalizer task (11 sections) with Risk Priority Matrix + justification for each test beyond baseline 2
|
||||
7. Confirmation / autoApprove → Creates final Task with parentId=US001, label "tests"
|
||||
|
||||
## Reference Files
|
||||
|
||||
### risk_based_testing_guide.md (Skill-Specific)
|
||||
|
||||
**Purpose**: Risk-Based Testing methodology for test task planning
|
||||
|
||||
**Contents**: Risk Priority Matrix (Business Impact × Probability), test limits (E2E 2-5, Integration 0-8, Unit 0-15), decision tree, anti-patterns, test selection examples
|
||||
|
||||
**Location**: [ln-350-story-test-planner/references/risk_based_testing_guide.md](references/risk_based_testing_guide.md)
|
||||
|
||||
**Ownership**: ln-350-story-test-planner (orchestrator-specific logic)
|
||||
|
||||
**Usage**: ln-350-story-test-planner uses this guide in Phase 4 (Risk-Based Test Planning)
|
||||
|
||||
### test_task_template.md (MOVED)
|
||||
|
||||
**Purpose**: Story finalizer task structure (11 sections: tests + fixes + infrastructure + docs + cleanup)
|
||||
|
||||
**Location**: Moved to [ln-311-task-creator/references/test_task_template.md](../ln-311-task-creator/references/test_task_template.md)
|
||||
|
||||
**Ownership**: ln-311-task-creator (universal factory owns all product templates)
|
||||
|
||||
**Rationale**: Templates moved to universal factory (ln-311-task-creator) which creates ALL 3 task types (implementation, refactoring, test). ln-311-task-creator owns all product templates.
|
||||
|
||||
**Usage**: Workers (ln-311-task-creator, ln-312-task-replanner) read this template when generating test task documents (via `taskType: "test"`)
|
||||
|
||||
### linear_integration.md (Shared Reference)
|
||||
|
||||
**Location**: [ln-210-epic-coordinator/references/linear_integration.md](../ln-210-epic-coordinator/references/linear_integration.md)
|
||||
|
||||
**Purpose**: Linear API reference and integration patterns
|
||||
|
||||
## Best Practices
|
||||
|
||||
**Minimum Viable Testing Philosophy:** Start with 2 E2E tests per endpoint (positive + negative). Add more tests ONLY with critical justification. **Realistic goal: 2-7 tests per Story** (not 10-28). Each test beyond baseline 2 MUST justify: "Why does this test OUR business logic (not framework/library/database)?"
|
||||
|
||||
**Risk-Based Testing:** Prioritize by Business Impact × Probability (not coverage metrics). Test limits: 2-5 E2E (baseline 2 + additional 0-3), 0-8 Integration (default 0), 0-15 Unit (default 0). E2E-first from ACTUAL manual testing results. Priority ≥15 scenarios covered by tests, Priority ≤14 covered by manual testing.
|
||||
|
||||
**Anti-Duplication:** Each test validates unique business value. If 2 baseline E2E cover it, SKIP unit test. Test OUR code only (not frameworks/libraries/database queries). Focus on complex business logic ONLY (financial calculations, security algorithms, complex business rules). MANDATORY SKIP: CRUD, getters/setters, trivial conditionals, framework code, library functions, database queries.
|
||||
|
||||
**Auto-Trim:** If test plan exceeds 7 tests → auto-trim to 7 by Priority. Keep 2 baseline E2E always, trim lowest Priority tests. Document trimmed scenarios: "Covered by manual testing".
|
||||
|
||||
---
|
||||
|
||||
**Version:** 7.2.0
|
||||