# GitHub Project Board (Kanban) Management Command
|
||||
|
||||
You are helping the user create, manage, and organize GitHub Project boards (Kanbans) following Sngular's agile project management best practices.
|
||||
|
||||
## Instructions
|
||||
|
||||
1. **Determine the action**:
|
||||
- Create a new project board
|
||||
- View existing project boards
|
||||
- Add issues/PRs to a board
|
||||
- Move items between columns
|
||||
- Update project fields (status, priority, etc.)
|
||||
- Generate project reports
|
||||
- Archive or close projects
|
||||
|
||||
2. **Verify GitHub access**:
|
||||
- Check if in a GitHub repository
|
||||
- Verify `gh` CLI is installed and authenticated
|
||||
- Confirm user has appropriate permissions
|
||||
- Check for GitHub Projects (V2) availability
|
||||
|
||||
3. **Understand project structure**:
|
||||
- Board name and purpose
|
||||
- Workflow stages (columns/status)
|
||||
- Custom fields (priority, size, sprint, etc.)
|
||||
- Automation rules
|
||||
- Views and filters
|
||||
|
||||
## GitHub Projects Overview
|
||||
|
||||
### Project Types
|
||||
|
||||
**Repository Project**: Attached to a single repository
|
||||
- Good for: Single product development
|
||||
- Access: Repository collaborators
|
||||
|
||||
**Organization Project**: Spans multiple repositories
|
||||
- Good for: Cross-team initiatives, programs
|
||||
- Access: Organization members
|
||||
|
||||
**User Project**: Personal project boards
|
||||
- Good for: Individual task tracking
|
||||
|
||||
### Board Layouts
|
||||
|
||||
**Board View**: Classic kanban columns (Todo, In Progress, Done)
|
||||
**Table View**: Spreadsheet-like view with custom fields
|
||||
**Roadmap View**: Timeline view for planning
|
||||
|
||||
## GitHub CLI Commands
|
||||
|
||||
### Viewing Projects
|
||||
|
||||
```bash
|
||||
# List all projects in organization
|
||||
gh project list --owner ORGANIZATION
|
||||
|
||||
# List projects for current repository
|
||||
gh project list
|
||||
|
||||
# View specific project
|
||||
gh project view PROJECT_NUMBER
|
||||
|
||||
# View project in browser
|
||||
gh project view PROJECT_NUMBER --web
|
||||
|
||||
# View project as JSON for scripting
|
||||
gh project view PROJECT_NUMBER --format json
|
||||
```
|
||||
|
||||
### Creating Projects
|
||||
|
||||
```bash
|
||||
# Create repository project
|
||||
gh project create --owner OWNER --title "Sprint 24" --body "Sprint 24 work items"
|
||||
|
||||
# Create organization project
|
||||
gh project create --org ORGANIZATION --title "Q4 Roadmap" --body "Q4 2024 initiatives"
|
||||
|
||||
# Create project with specific format
|
||||
gh project create --title "Product Backlog" --format board
|
||||
```
|
||||
|
||||
### Managing Project Items
|
||||
|
||||
```bash
|
||||
# Add issue to project
|
||||
gh project item-add PROJECT_NUMBER --owner OWNER --url https://github.com/owner/repo/issues/123
|
||||
|
||||
# Add PR to project
|
||||
gh project item-add PROJECT_NUMBER --owner OWNER --url https://github.com/owner/repo/pull/456
|
||||
|
||||
# Remove item from project
|
||||
gh project item-delete --id ITEM_ID --project-id PROJECT_ID
|
||||
|
||||
# List items in project
|
||||
gh project item-list PROJECT_NUMBER --owner OWNER
|
||||
|
||||
# List items with specific status
|
||||
gh project item-list PROJECT_NUMBER --owner OWNER --format json | \
|
||||
jq '.items[] | select(.status == "In Progress")'
|
||||
```
|
||||
|
||||
### Updating Item Fields
|
||||
|
||||
```bash
|
||||
# Update item status
|
||||
gh project item-edit \
|
||||
--project-id PROJECT_ID \
|
||||
--id ITEM_ID \
|
||||
--field-id STATUS_FIELD_ID \
|
||||
--value "In Progress"
|
||||
|
||||
# Update priority
|
||||
gh project item-edit \
|
||||
--project-id PROJECT_ID \
|
||||
--id ITEM_ID \
|
||||
--field-id PRIORITY_FIELD_ID \
|
||||
--value "High"
|
||||
|
||||
# Update sprint
|
||||
gh project item-edit \
|
||||
--project-id PROJECT_ID \
|
||||
--id ITEM_ID \
|
||||
--field-id SPRINT_FIELD_ID \
|
||||
--value "Sprint 24"
|
||||
|
||||
# Update multiple fields
|
||||
gh project item-edit \
|
||||
--project-id PROJECT_ID \
|
||||
--id ITEM_ID \
|
||||
--field-id STATUS_FIELD_ID \
|
||||
--value "Done" \
|
||||
--field-id COMPLETED_DATE_FIELD_ID \
|
||||
--value "2024-11-04"
|
||||
```
|
||||
|
||||
### Managing Project Fields
|
||||
|
||||
```bash
|
||||
# List all fields in project
|
||||
gh project field-list PROJECT_NUMBER --owner OWNER
|
||||
|
||||
# Create new field
|
||||
gh project field-create PROJECT_NUMBER \
|
||||
--owner OWNER \
|
||||
--name "Story Points" \
|
||||
--data-type "NUMBER"
|
||||
|
||||
# Create single-select field
|
||||
gh project field-create PROJECT_NUMBER \
|
||||
--owner OWNER \
|
||||
--name "Priority" \
|
||||
--data-type "SINGLE_SELECT" \
|
||||
--options "High,Medium,Low"
|
||||
|
||||
# Delete field
|
||||
gh project field-delete PROJECT_NUMBER --field-id FIELD_ID
|
||||
```
|
||||
|
||||
## Common Kanban Board Configurations
|
||||
|
||||
### Basic Scrum Board
|
||||
|
||||
**Columns**:
|
||||
1. **Backlog**: All items not yet started
|
||||
2. **Sprint Backlog**: Items planned for current sprint
|
||||
3. **In Progress**: Actively being worked on
|
||||
4. **In Review**: Code review or testing
|
||||
5. **Done**: Completed items
|
||||
|
||||
**Custom Fields**:
|
||||
- Priority: High / Medium / Low
|
||||
- Story Points: 1, 2, 3, 5, 8, 13
|
||||
- Sprint: Sprint 1, Sprint 2, etc.
|
||||
- Assignee: Team member
|
||||
|
||||
### Feature Development Board
|
||||
|
||||
**Columns**:
|
||||
1. **Ideas**: Proposals and feature requests
|
||||
2. **Refined**: Requirements documented
|
||||
3. **Ready**: Approved and ready for development
|
||||
4. **In Development**: Active coding
|
||||
5. **In Review**: Code review
|
||||
6. **In Testing**: QA testing
|
||||
7. **Deployed**: Live in production
|
||||
|
||||
**Custom Fields**:
|
||||
- Feature Area: Frontend / Backend / DevOps
|
||||
- Size: Small / Medium / Large
|
||||
- Target Release: v1.0, v1.1, etc.
|
||||
- Customer Impact: High / Medium / Low
|
||||
|
||||
### Bug Tracking Board
|
||||
|
||||
**Columns**:
|
||||
1. **Triage**: New bugs needing review
|
||||
2. **Confirmed**: Verified and reproduced
|
||||
3. **Prioritized**: Assigned priority
|
||||
4. **In Progress**: Being fixed
|
||||
5. **Fixed**: Code merged
|
||||
6. **Verified**: QA confirmed fix
|
||||
|
||||
**Custom Fields**:
|
||||
- Severity: Critical / High / Medium / Low
|
||||
- Affected Version: Version numbers
|
||||
- Root Cause: Code bug / Configuration / External
|
||||
- Customer Reported: Yes / No
|
||||
|
||||
## Workflow Automation
|
||||
|
||||
### Automated Column Movements
|
||||
|
||||
**Auto-move to "In Progress"** when:
|
||||
- Issue is assigned
|
||||
- PR is opened
|
||||
- Branch is created
|
||||
|
||||
**Auto-move to "In Review"** when:
|
||||
- PR is ready for review
|
||||
- Issue is labeled "review"
|
||||
|
||||
**Auto-move to "Done"** when:
|
||||
- PR is merged
|
||||
- Issue is closed
|
||||
|
||||
### Example Automation Setup
|
||||
|
||||
While GitHub Projects V2 automation is typically configured via the UI, you can use GitHub Actions:
|
||||
|
||||
```yaml
|
||||
# .github/workflows/project-automation.yml
|
||||
name: Project Board Automation
|
||||
|
||||
on:
|
||||
issues:
|
||||
types: [opened, assigned, closed]
|
||||
pull_request:
|
||||
types: [opened, ready_for_review, closed]
|
||||
|
||||
jobs:
|
||||
update-project:
|
||||
runs-on: ubuntu-latest
|
||||
steps:
|
||||
- name: Move issue to In Progress
|
||||
if: github.event_name == 'issues' && github.event.action == 'assigned'
|
||||
uses: actions/github-script@v7
|
||||
with:
|
||||
script: |
|
||||
// Update project item status
|
||||
// (Implementation depends on project structure)
|
||||
|
||||
- name: Move PR to In Review
|
||||
if: github.event_name == 'pull_request' && github.event.action == 'ready_for_review'
|
||||
uses: actions/github-script@v7
|
||||
with:
|
||||
script: |
|
||||
// Update project item status
|
||||
|
||||
- name: Move to Done
|
||||
if: (github.event_name == 'issues' && github.event.action == 'closed') || (github.event_name == 'pull_request' && github.event.pull_request.merged)
|
||||
uses: actions/github-script@v7
|
||||
with:
|
||||
script: |
|
||||
// Update project item status to Done
|
||||
```
|
||||
|
||||
## Project Management Workflows
|
||||
|
||||
### Sprint Planning
|
||||
|
||||
1. **Review backlog**:
|
||||
```bash
|
||||
gh project item-list PROJECT_NUMBER --owner OWNER --format json | \
|
||||
jq '.items[] | select(.status == "Backlog")'
|
||||
```
|
||||
|
||||
2. **Select items for sprint**:
|
||||
```bash
|
||||
# Move items to Sprint Backlog
|
||||
gh project item-edit \
|
||||
--project-id PROJECT_ID \
|
||||
--id ITEM_ID \
|
||||
--field-id STATUS_FIELD_ID \
|
||||
--value "Sprint Backlog" \
|
||||
--field-id SPRINT_FIELD_ID \
|
||||
--value "Sprint 24"
|
||||
```
|
||||
|
||||
3. **Assign to team members**:
|
||||
```bash
|
||||
gh issue edit 123 --add-assignee username
|
||||
```
|
||||
|
||||
4. **Set priorities and estimates**:
|
||||
```bash
|
||||
gh project item-edit \
|
||||
--project-id PROJECT_ID \
|
||||
--id ITEM_ID \
|
||||
--field-id STORY_POINTS_FIELD_ID \
|
||||
--value 5
|
||||
```
|
||||
|
||||
### Daily Standup Report
|
||||
|
||||
```bash
|
||||
# Items in progress
|
||||
echo "In Progress:"
|
||||
gh project item-list PROJECT_NUMBER --owner OWNER --format json | \
|
||||
jq -r '.items[] | select(.status == "In Progress") | "- #\(.content.number): \(.content.title) (@\(.assignees[0].login))"'
|
||||
|
||||
# Items in review
|
||||
echo "\nIn Review:"
|
||||
gh project item-list PROJECT_NUMBER --owner OWNER --format json | \
|
||||
jq -r '.items[] | select(.status == "In Review") | "- #\(.content.number): \(.content.title)"'
|
||||
|
||||
# Blocked items
|
||||
echo "\nBlocked:"
|
||||
gh issue list --label "status: blocked" --json number,title,assignees
|
||||
```
|
||||
|
||||
### Sprint Retrospective
|
||||
|
||||
```bash
|
||||
# Completed items count
|
||||
COMPLETED=$(gh project item-list PROJECT_NUMBER --owner OWNER --format json | \
|
||||
jq '[.items[] | select(.status == "Done")] | length')
|
||||
|
||||
echo "Completed items: $COMPLETED"
|
||||
|
||||
# Velocity calculation
|
||||
STORY_POINTS=$(gh project item-list PROJECT_NUMBER --owner OWNER --format json | \
|
||||
jq '[.items[] | select(.status == "Done" and .storyPoints != null) | .storyPoints] | add')
|
||||
|
||||
echo "Total story points: $STORY_POINTS"
|
||||
|
||||
# Cycle time (for closed issues)
|
||||
gh issue list --state closed --search "closed:>=$(date -v-14d +%Y-%m-%d)" --json number,closedAt,createdAt
|
||||
```
|
||||
|
||||
## Best Practices
|
||||
|
||||
### Board Organization
|
||||
|
||||
1. **Keep columns focused**: 3-7 columns is optimal
|
||||
2. **Define column criteria**: Clear rules for when items move
|
||||
3. **Limit WIP**: Set work-in-progress limits per column
|
||||
4. **Regular grooming**: Weekly backlog refinement
|
||||
5. **Clear ownership**: Each item should have an assignee
|
||||
|
||||
### Field Usage
|
||||
|
||||
1. **Consistent values**: Use predefined options for consistency
|
||||
2. **Required fields**: Priority, Status, Assignee as minimum
|
||||
3. **Meaningful estimates**: Story points or t-shirt sizes
|
||||
4. **Track progress**: Use dates, sprints, milestones
|
||||
|
||||
### Team Workflows
|
||||
|
||||
1. **Daily updates**: Team members update their items daily
|
||||
2. **Pull model**: Team members pull work from backlog
|
||||
3. **Visual management**: Use labels and colors effectively
|
||||
4. **Transparency**: Keep board public and accessible
|
||||
5. **Retrospectives**: Review and improve process regularly
|
||||
|
||||
### Reporting
|
||||
|
||||
Generate insights from your board:
|
||||
|
||||
```bash
|
||||
# Sprint burndown data
|
||||
gh project item-list PROJECT_NUMBER --format json | \
|
||||
jq '[.items[] | select(.sprint == "Sprint 24")] |
|
||||
{total: length, done: [.[] | select(.status == "Done")] | length}'
|
||||
|
||||
# Items by priority
|
||||
gh project item-list PROJECT_NUMBER --format json | \
|
||||
jq 'group_by(.priority) | map({priority: .[0].priority, count: length})'
|
||||
|
||||
# Team workload
|
||||
gh issue list --assignee username --json state | \
|
||||
jq 'group_by(.state) | map({state: .[0].state, count: length})'
|
||||
```
|
||||
|
||||
## Example Workflows
|
||||
|
||||
### Create New Sprint Board
|
||||
|
||||
```bash
|
||||
# Create project
|
||||
PROJECT_NUMBER=$(gh project create \
|
||||
--owner ORGANIZATION \
|
||||
--title "Sprint 24 - Nov 4-17" \
|
||||
--body "Sprint 24 work items for Product Team" \
|
||||
--format json | jq -r '.number')
|
||||
|
||||
echo "Created project #$PROJECT_NUMBER"
|
||||
|
||||
# Add backlog items to sprint
|
||||
gh issue list --label "sprint-24" --json number --jq '.[].number' | \
|
||||
while read issue_number; do
|
||||
gh project item-add $PROJECT_NUMBER \
|
||||
--owner ORGANIZATION \
|
||||
--url "https://github.com/OWNER/REPO/issues/$issue_number"
|
||||
echo "Added issue #$issue_number"
|
||||
done
|
||||
```
|
||||
|
||||
### Move All Ready Items to Sprint
|
||||
|
||||
```bash
|
||||
# Get all items with status "Ready"
|
||||
gh project item-list PROJECT_NUMBER --format json | \
|
||||
jq -r '.items[] | select(.status == "Ready") | .id' | \
|
||||
while read item_id; do
|
||||
gh project item-edit \
|
||||
--project-id PROJECT_ID \
|
||||
--id $item_id \
|
||||
--field-id STATUS_FIELD_ID \
|
||||
--value "Sprint Backlog"
|
||||
echo "Moved item $item_id to Sprint Backlog"
|
||||
done
|
||||
```
|
||||
|
||||
### Generate Sprint Report
|
||||
|
||||
```bash
|
||||
#!/bin/bash
|
||||
# sprint-report.sh
|
||||
|
||||
PROJECT_NUMBER=$1
|
||||
SPRINT_NAME=$2
|
||||
|
||||
echo "# Sprint Report: $SPRINT_NAME"
|
||||
echo "Generated: $(date)"
|
||||
echo ""
|
||||
|
||||
# Get all items
|
||||
ITEMS=$(gh project item-list $PROJECT_NUMBER --format json)
|
||||
|
||||
# Total items
|
||||
TOTAL=$(echo "$ITEMS" | jq '[.items[] | select(.sprint == "'$SPRINT_NAME'")] | length')
|
||||
echo "Total items: $TOTAL"
|
||||
|
||||
# Completed items
|
||||
COMPLETED=$(echo "$ITEMS" | jq '[.items[] | select(.sprint == "'$SPRINT_NAME'" and .status == "Done")] | length')
|
||||
echo "Completed: $COMPLETED"
|
||||
|
||||
# In progress
|
||||
IN_PROGRESS=$(echo "$ITEMS" | jq '[.items[] | select(.sprint == "'$SPRINT_NAME'" and .status == "In Progress")] | length')
|
||||
echo "In progress: $IN_PROGRESS"
|
||||
|
||||
# Completion rate
|
||||
RATE=$(echo "scale=2; $COMPLETED * 100 / $TOTAL" | bc)
|
||||
echo "Completion rate: ${RATE}%"
|
||||
|
||||
# Story points
|
||||
TOTAL_POINTS=$(echo "$ITEMS" | jq '[.items[] | select(.sprint == "'$SPRINT_NAME'" and .storyPoints != null) | .storyPoints] | add')
|
||||
COMPLETED_POINTS=$(echo "$ITEMS" | jq '[.items[] | select(.sprint == "'$SPRINT_NAME'" and .status == "Done" and .storyPoints != null) | .storyPoints] | add')
|
||||
echo ""
|
||||
echo "Total story points: $TOTAL_POINTS"
|
||||
echo "Completed points: $COMPLETED_POINTS"
|
||||
```
|
||||
|
||||
## Integration with Issues
|
||||
|
||||
```bash
|
||||
# Create issue and add to project in one workflow
|
||||
ISSUE_NUMBER=$(gh issue create \
|
||||
--title "Implement user dashboard" \
|
||||
--body "Requirements..." \
|
||||
--label "feature,frontend" \
|
||||
--assignee username \
|
||||
--json number --jq '.number')
|
||||
|
||||
gh project item-add PROJECT_NUMBER \
|
||||
--owner OWNER \
|
||||
--url "https://github.com/OWNER/REPO/issues/$ISSUE_NUMBER"
|
||||
|
||||
echo "Created issue #$ISSUE_NUMBER and added to project"
|
||||
```
|
||||
|
||||
## Questions to Ask
|
||||
|
||||
Before managing project boards:
|
||||
1. "What is the purpose of this project board?"
|
||||
2. "What workflow stages do you need? (e.g., Todo, In Progress, Done)"
|
||||
3. "What custom fields should we track? (priority, sprint, story points)"
|
||||
4. "Is this a repository or organization-level project?"
|
||||
5. "Should we set up any automation rules?"
|
||||
6. "Do you want to add existing issues to this board?"
|
||||
7. "What views do you need? (Board, Table, Roadmap)"
|
||||
|
||||
Ask the user: "What would you like to do with GitHub project boards?"
|
||||