Files
gh-gtmagents-gtm-agents-plu…/commands/manage-production.md
2025-11-29 18:30:05 +08:00

3.0 KiB
Raw Blame History

name, description, usage
name description usage
manage-production Generates a production tracker with tasks, owners, feedback cycles, and QA steps. /content-pipeline-orchestration:manage-production --pillar "AI readiness" --assets "ebook,video,design kit"

Command: manage-production

Inputs

  • pillar reference pillar or campaign.
  • assets comma-separated asset types or names.
  • tools optional tools/platforms (Docs, Figma, Notion, CMS).
  • qa include QA/evidence plan (default true).
  • localization regions/languages requiring localization.

GTM Agents Pattern & Plan Checklist

Pulled from GTM Agents orchestrator blueprint @puerto/plugins/orchestrator/README.md#112-325.

  • Pattern selection: Production typically runs pipeline (tasks → owners → feedback → QA → packaging). Use diamond when localization or QA evidence can run parallel; document choice in the plan header.
  • Plan schema: Save or update .claude/plans/plan-<timestamp>.json with task IDs, asset references, tooling context, parallel groups, handoff requirements, error handling, and success criteria (on-time %, defect ceiling).
  • Tool hooks: Reference docs/gtm-essentials.md stack (Serena for CMS automation patches, Context7 for brand/legal standards, Sequential Thinking for retros, Playwright for accessibility/QA screens).
  • Guardrails: Default retry limit = 2 for failed QA; escalation ladder = Creative Producer → Editorial Director → Marketing Director.
  • Review: Run docs/usage-guide.md#orchestration-best-practices-puerto-parity before execution to confirm agents, dependencies, deliverables.

Workflow

  1. Task Breakdown create tasks per asset (draft, design, review, localization, QA).
  2. Owner Assignment map writers, designers, reviewers, approvers, and due dates.
  3. Feedback Loops schedule review checkpoints, consolidate feedback instructions.
  4. QA Checklist ensure brand, accessibility, legal, and technical requirements are validated.
  5. Asset Packaging outline final delivery steps (naming conventions, metadata, storage paths).

Outputs

  • Production tracker (task, owner, status, due date, dependencies, comments).
  • QA/evidence log template.
  • Asset handoff checklist with storage locations.
  • Plan JSON entry stored/updated in .claude/plans for audit trail.

Agent/Skill Invocations

  • creative-producer runs production board + QA.
  • asset-tracking skill ensures dependencies + metadata.
  • distribution-lead receives handoff package for publishing.

GTM Agents Safeguards

  • Fallback agents: document substitutes (e.g., Editorial Director covering Creative Producer) when specialists unavailable.
  • Escalation triggers: if QA defects, brand issues, or missed deadlines breach guardrails twice in 48h, escalate to Content + Growth leadership per GTM Agents runbook.
  • Plan maintenance: update plan JSON and change log whenever assets, owners, or QA scope shift so audit trail mirrors GTM Agents standards.