description: Generate comprehensive project reports in various formats (summary, sprint, milestone, velocity, full)
---
# Generate Project Report
When the user runs `/project-report [project-name] [report-type]`, generate a comprehensive report document.
## Command Syntax
```
/project-report # Interactive: asks for project and type
/project-report [project-name] # Interactive: asks for type
/project-report [project-name] [type] # Direct: generates specified report
```
**Report Types**:
- `summary` - High-level project overview (default)
- `sprint` - Current/recent sprint detailed analysis
- `milestone` - Milestone progress and roadmap
- `velocity` - Team velocity and estimation analysis
- `full` - Complete project report (all sections)
## Task 1: Identify Project and Report Type
### If no parameters provided:
1. **Discover projects in workspace**:
```bash
find . -name "RULE.md" -type f
```
2. **Present project selection**:
```
📊 Generate Project Report
Select project:
1. {Project 1 Name} ({path})
2. {Project 2 Name} ({path})
3. {Project 3 Name} ({path})
Which project? (1-3)
```
3. **Present report type selection**:
```
Select report type:
1. Summary - High-level overview (recommended for stakeholders)
2. Sprint - Current sprint detailed analysis
3. Milestone - Milestone progress and timeline
4. Velocity - Team performance metrics
5. Full - Comprehensive report (all sections)
Which type? (1-5)
```
### If parameters provided:
Parse and validate:
- Project name matches existing project
- Report type is valid (summary|sprint|milestone|velocity|full)
## Task 2: Gather Report Data
Based on report type, collect relevant information:
### For All Report Types:
- Project name and basic info (from RULE.md)
- Current date and report generation metadata
- Project start date and duration
### For Summary Report:
- Methodology and team size
- Current sprint/phase status
- Milestone completion overview
- Key achievements (last 30 days)
- Upcoming milestones and deadlines
- High-level risks or blockers
### For Sprint Report:
- Current or most recent sprint details
- Sprint goal and dates
- Story breakdown with status
- Burndown/velocity data
- Team assignments
- Blockers and resolutions
- Sprint ceremony notes (planning, review, retro)
- Comparison with previous sprints
### For Milestone Report:
- All milestones with status
- Timeline and roadmap
- Dependencies between milestones
- Progress against targets
- Contributing sprints for each milestone
- Risk analysis for upcoming milestones
### For Velocity Report:
- Historical sprint velocities (last 6-10 sprints)
- Average velocity calculation
- Velocity trends (improving/declining/stable)
- Estimation accuracy analysis
- Team capacity over time
- Factors affecting velocity
- Recommendations for future sprint planning
### For Full Report:
All of the above sections combined.
## Task 3: Generate Report Document
Create a comprehensive markdown document with proper formatting:
### Summary Report Format:
```markdown
# Project Report: {Project Name}
**Report Type**: Summary
**Generated**: {YYYY-MM-DD HH:MM}
**Report Period**: {project_start} to {current_date}
**Project Duration**: {X} months
---
## Executive Summary
{2-3 paragraph overview of project status, key achievements, and next steps}
---
## Project Information
| Field | Value |
|-------|-------|
| **Project Name** | {name} |
| **Methodology** | {Scrum/Kanban/etc.} |
| **Team Size** | {size} members |
| **Project Start** | {date} |
| **Current Phase** | {Sprint X / Phase Y} |
| **Status** | {On Track / At Risk / Behind} |
---
## Current Status
### Active Sprint/Phase
**{Sprint Number}: {Goal}**
- Duration: {start_date} to {end_date}
- Progress: {X}/{Y} stories completed ({percentage}%)
- Status: {On Track | At Risk | Behind}
- Days Remaining: {days}
### Recent Completions
- ✅ {Item 1}
- ✅ {Item 2}
- ✅ {Item 3}
### In Progress
- 🔄 {Item 1} - @{owner}
- 🔄 {Item 2} - @{owner}
### Blockers
{If any blockers exist:}
- ⚠️ {Blocker description} - {impact}
{If no blockers:}
- None. All work proceeding smoothly.
---
## Milestone Progress
**Overall**: {X}/{Y} milestones completed ({percentage}%)
### Completed Milestones
- ✅ {Milestone 1} - {completion_date}
- ✅ {Milestone 2} - {completion_date}
### In Progress
- 🔄 {Milestone name} - {target_date} ({progress}%)
- Status: {On Time | At Risk | Delayed}
### Upcoming (Next 90 Days)
- 📅 {Milestone name} - {target_date}
- 📅 {Milestone name} - {target_date}
---
## Key Achievements (Last 30 Days)
{Extract from Recent Activity in README.md}
- {Date}: {Achievement}
- {Date}: {Achievement}
- {Date}: {Achievement}
---
## Upcoming Priorities
### This Month
1. {Priority item 1}
2. {Priority item 2}
3. {Priority item 3}
### Next Month
1. {Priority item 1}
2. {Priority item 2}
---
## Risks and Concerns
{If risks exist:}
### High Priority
- ⚠️ {Risk description}
- Impact: {impact}
- Mitigation: {mitigation plan}
### Medium Priority
- {Risk description}
{If no major risks:}
No significant risks identified. Project is progressing according to plan.
---
## Team Performance
- **Sprint Velocity**: {average} points/sprint
- **Completion Rate**: {percentage}% of planned work delivered
- **Team Morale**: {from retrospective notes if available}
---
## Recommendations
{Based on analysis, provide 3-5 actionable recommendations}
1. {Recommendation 1}
2. {Recommendation 2}
3. {Recommendation 3}
---
## Next Steps
1. {Next step 1}
2. {Next step 2}
3. {Next step 3}
---
**Report Generated by**: ProjectMaster
**Last Updated**: {YYYY-MM-DD HH:MM}
```
### Sprint Report Format:
```markdown
# Sprint Report: Sprint {Number}
**Project**: {Project Name}
**Sprint Goal**: {Goal}
**Generated**: {YYYY-MM-DD HH:MM}
---
## Sprint Overview
| Field | Value |
|-------|-------|
| **Sprint Number** | {number} |
| **Duration** | {start_date} to {end_date} |
| **Sprint Length** | {X} weeks |
| **Days Elapsed** | {Y} of {Z} days |
| **Status** | {Planning / Active / Review / Completed} |
---
## Sprint Goal
{Detailed description of sprint goal}
---
## Story Breakdown
### Summary
| Status | Count | Story Points |
|--------|-------|--------------|
| ✅ Completed | {X} | {A} pts |
| 🔄 In Progress | {Y} | {B} pts |
| ⏸️ Not Started | {Z} | {C} pts |
| ⚠️ Blocked | {W} | {D} pts |
| **Total** | **{total}** | **{total_pts} pts** |
### Completed Stories
{For each completed story:}
#### ✅ {Story Title}
- **Story Points**: {X}
- **Assignee**: @{name}
- **Completed**: {date}
- **Description**: {brief description}
- **Acceptance Criteria**: All met
---
### In Progress Stories
{For each in-progress story:}
#### 🔄 {Story Title}
- **Story Points**: {X}
- **Assignee**: @{name}
- **Progress**: {percentage}%
- **Status**: On track / Needs attention
- **Next Steps**: {what's next}
---
### Blocked Stories
{If any blockers:}
#### ⚠️ {Story Title}
- **Story Points**: {X}
- **Assignee**: @{name}
- **Blocker**: {blocker description}
- **Impact**: {impact on sprint}
- **Resolution Plan**: {plan}
- **Owner**: @{resolution_owner}
---
## Velocity Analysis
- **Planned Velocity**: {planned} points
- **Actual Velocity**: {actual} points (if sprint completed)
- **Completion Rate**: {percentage}%
- **Comparison to Average**: {above/below/on par} with team average of {avg} points
{If sprint active:}
- **Projected Velocity**: {projected} points based on current progress
- **On Track For**: {percentage}% completion
---
## Team Assignments
{For each team member:}
### @{member_name}
- **Assigned**: {count} stories ({points} points)
- **Completed**: {count} stories ({points} points)
- **In Progress**: {count} stories
- **Utilization**: {percentage}%
---
## Daily Progress
{Summary of daily updates if tracked}
### Week 1
- **Mon**: {summary}
- **Tue**: {summary}
- **Wed**: {summary}
- **Thu**: {summary}
- **Fri**: {summary}
### Week 2
- **Mon**: {summary}
- ...
---
## Sprint Ceremonies
### Sprint Planning
- **Date**: {date}
- **Duration**: {X} minutes
- **Attendees**: {list}
- **Key Decisions**: {summary}
- **Meeting Notes**: [Link](path/to/meeting.md)
{If sprint completed:}
### Sprint Review
- **Date**: {date}
- **Demos**: {count} stories demonstrated
- **Stakeholder Feedback**: {summary}
- **Meeting Notes**: [Link](path/to/meeting.md)
### Sprint Retrospective
- **Date**: {date}
- **What Went Well**: {summary}
- **What Could Improve**: {summary}
- **Action Items**: {list}
- **Meeting Notes**: [Link](path/to/meeting.md)
---
## Blockers and Resolutions
{Detailed list of blockers encountered and how they were resolved}
| Blocker | Reported | Resolved | Duration | Impact |
|---------|----------|----------|----------|--------|
| {description} | {date} | {date / "Open"} | {days} | {High/Med/Low} |
---
## Sprint Health Assessment
**Overall Health**: {Excellent / Good / Fair / Poor}
**Indicators**:
- Velocity: {On Track / Below / Above}
- Blockers: {None / Minor / Significant}
- Team Capacity: {Appropriate / Overloaded / Underutilized}
- Goal Achievement: {Likely / Uncertain / Unlikely}
---
## Recommendations
{3-5 specific recommendations for this sprint or next}
1. {Recommendation}
2. {Recommendation}
3. {Recommendation}
---
## Related Links
- [Sprint Plan Document](path/to/sprint-plan.md)
- [Sprint Planning Meeting](path/to/meeting.md)
- [Related Milestone](path/to/milestones.yaml)
- [Project README](../README.md)
---
**Report Generated by**: ProjectMaster
**Last Updated**: {YYYY-MM-DD HH:MM}
```
### Milestone Report Format:
```markdown
# Milestone Report: {Project Name}
**Generated**: {YYYY-MM-DD HH:MM}
**Report Period**: {project_start} to {current_date}
---
## Milestone Summary
| Metric | Value |
|--------|-------|
| **Total Milestones** | {total} |
| **Completed** | {completed} ({percentage}%) |
| **In Progress** | {in_progress} |
| **Planned** | {planned} |
| **Delayed** | {delayed} |
---
## Timeline Overview
{Text-based timeline visualization}
```
Q1 2025
├── [✅] Alpha Release (2025-02-15) ← Completed on time
└── [✅] Internal Testing (2025-03-01) ← Completed 2 days early
Q2 2025
├── [🔄] Beta Release (2025-03-31) ← In Progress (75%)
└── [📅] Feature Freeze (2025-04-15) ← Planned (blocked by Beta)
Q3 2025
├── [📅] Public Launch (2025-06-30) ← Planned
└── [📅] 1.0 Release (2025-07-31) ← Planned
```
---
## Milestone Details
{For each milestone:}
### {Status Icon} {Milestone Name}
**ID**: {milestone-id}
**Target Date**: {target_date}
**Actual Date**: {actual_date if completed}
**Status**: {planned / in_progress / completed / delayed}
**Owner**: @{name}
**Description**:
{milestone description}
**Deliverables**:
- [X] {Deliverable 1} (if completed)
- [🔄] {Deliverable 2} (if in progress)
- [ ] {Deliverable 3} (if pending)
**Dependencies**:
{If dependencies exist:}
- Depends on: {dependency names}
- Blocks: {dependent milestone names}
**Contributing Sprints**:
- Sprint {X}: {contribution}
- Sprint {Y}: {contribution}
**Progress**: {percentage}%
**Status**: {On Time / Early / Delayed by X days / At Risk}
{If completed:}
**Completion Report**: [View Report](path/to/completion-report.md)
---
{Repeat for each milestone}
---
## Dependency Map
{Visual representation of milestone dependencies}
```
Alpha Release
└── Internal Testing
└── Beta Release
├── Feature Freeze
└── Public Launch
└── 1.0 Release
```
---
## Progress Against Roadmap
**Original Plan vs. Actual**:
| Milestone | Planned Date | Actual/Projected | Variance | Status |
|-----------|--------------|------------------|----------|--------|
| Alpha | 2025-02-15 | 2025-02-15 | On time | ✅ |
| Beta | 2025-03-31 | 2025-04-05 | +5 days | ⚠️ |
| Launch | 2025-06-30 | 2025-07-10 | +10 days | ⚠️ |
---
## Risk Analysis
### Milestones At Risk
{For milestones at risk:}
#### ⚠️ {Milestone Name}
- **Risk Level**: {High / Medium / Low}
- **Reason**: {why at risk}
- **Impact**: {what happens if delayed}
- **Mitigation**: {plan to get back on track}
- **Owner**: @{responsible person}
---
## Recommendations
{Based on milestone analysis:}
1. {Recommendation for getting milestones on track}
2. {Recommendation for risk mitigation}
3. {Recommendation for process improvement}
---
**Report Generated by**: ProjectMaster
**Last Updated**: {YYYY-MM-DD HH:MM}
```
### Velocity Report Format:
```markdown
# Velocity Report: {Project Name}
**Generated**: {YYYY-MM-DD HH:MM}
**Analysis Period**: {first_sprint_date} to {current_date}
**Sprints Analyzed**: {count}
---
## Velocity Summary
| Metric | Value |
|--------|-------|
| **Average Velocity** | {avg} story points/sprint |
| **Highest Velocity** | {max} points (Sprint {X}) |
| **Lowest Velocity** | {min} points (Sprint {Y}) |
| **Standard Deviation** | {stddev} points |
| **Trend** | {Improving / Stable / Declining} |
---
## Sprint-by-Sprint Velocity
| Sprint | Goal | Planned | Actual | Completion % | Status |
|--------|------|---------|--------|--------------|--------|
| Sprint 1 | {goal} | {planned} | {actual} | {pct}% | {icon} |
| Sprint 2 | {goal} | {planned} | {actual} | {pct}% | {icon} |
| Sprint 3 | {goal} | {planned} | {actual} | {pct}% | {icon} |
| ... | ... | ... | ... | ... | ... |
**Total Story Points Delivered**: {total} points across {count} sprints
---
## Velocity Trend Analysis
{Text-based trend visualization}
```
Story Points
50 │
45 │ ●
40 │ ● ●
35 │●
30 │ ●
25 │ ●
└─────────────────────────
S1 S2 S3 S4 S5 S6
```
**Trend**: {Improving / Stable / Declining}
**Analysis**:
{Interpret the trend:}
- Sprint 1-2: Ramping up, team finding rhythm
- Sprint 3-4: Peak performance, all team members fully onboarded
- Sprint 5-6: {Slight decline due to complexity / Maintained pace / etc.}
---
## Estimation Accuracy
**Overall Accuracy**: {percentage}%
| Sprint | Estimated | Delivered | Accuracy | Notes |
|--------|-----------|-----------|----------|-------|
| Sprint 1 | {est} | {actual} | {pct}% | {notes} |
| Sprint 2 | {est} | {actual} | {pct}% | {notes} |
| ... | ... | ... | ... | ... |
**Observations**:
- {Observation about overestimation/underestimation patterns}
- {Observation about improving accuracy over time}
---
## Factors Affecting Velocity
{Analyze factors that impacted velocity}
### Positive Factors
- {Factor 1}: Increased velocity by ~{X}% (Sprint {Y})
- {Factor 2}: Contributed to higher output
### Negative Factors
- {Factor 1}: Reduced velocity by ~{X}% (Sprint {Y})
- {Factor 2}: Caused delays
### Lessons Learned
- {Lesson 1}
- {Lesson 2}
---
## Team Capacity Analysis
**Team Size Over Time**:
{If team size changed}
| Period | Team Size | Avg Velocity | Points per Person |
|--------|-----------|--------------|-------------------|
| Sprint 1-2 | {size} | {velocity} | {per_person} |
| Sprint 3-5 | {size} | {velocity} | {per_person} |
**Observations**:
- {How team size changes affected overall velocity}
- {Per-person productivity trends}
---
## Story Point Distribution
**By Size**:
| Size | Count | Percentage | Avg Completion Time |
|------|-------|------------|---------------------|
| 1 pt | {count} | {pct}% | {X} days |
| 2 pts | {count} | {pct}% | {X} days |
| 3 pts | {count} | {pct}% | {X} days |
| 5 pts | {count} | {pct}% | {X} days |
| 8 pts | {count} | {pct}% | {X} days |
| 13+ pts | {count} | {pct}% | {X} days |
**Observations**:
- {Most common story size}
- {Correlation between size and completion rate}
---
## Velocity Predictions
**For Next Sprint**:
- **Conservative Estimate**: {avg - stddev} points
- **Expected Estimate**: {avg} points
- **Optimistic Estimate**: {avg + stddev} points
**Recommendation**: Plan for {recommended} story points in Sprint {next}
**Rationale**: {Based on recent trend and team capacity}
---
## Recommendations for Sprint Planning
{5-7 actionable recommendations based on velocity analysis}
1. **Story Sizing**: {recommendation about estimations}
2. **Capacity Planning**: {recommendation about sprint commitments}
3. **Risk Buffer**: {recommendation about buffer time}
4. **Team Focus**: {recommendation based on patterns}
5. **Process Improvements**: {recommendation for efficiency}
---
## Appendix: Data Sources
- Sprint Plans: {paths to sprint documents}
- Sprint Retrospectives: {paths to retro notes}
- Team Composition: {source}
- Story Point Definitions: {link to estimation guide if exists}
---
**Report Generated by**: ProjectMaster
**Last Updated**: {YYYY-MM-DD HH:MM}
```
### Full Report:
Combine all sections above into one comprehensive document with table of contents.
## Task 4: Save and Present Report
1. **Create reports directory** (if doesn't exist):
```bash
mkdir -p reports/
```
2. **Generate filename**:
```
reports/{report-type}-{project-name-slug}-{YYYY-MM-DD}.md
Example: reports/summary-ecommerce-redesign-2025-11-13.md
```
3. **Write report file**:
```
Use Write tool to create the report document
```
4. **Update governance**:
- Add entry to project README.md Recent Activity:
```markdown
- 2025-11-13: Generated {report-type} report
```
- Create or update reports/README.md:
```markdown
# Project Reports
## Recent Reports
- [{Date}: {Report Type}](filename.md) - {Brief description}
```
5. **Present confirmation**:
```
✅ Report Generated Successfully!
📄 Report Type: {type}
📊 Project: {project name}
📅 Generated: {date time}
📁 Saved to: reports/{filename}.md
📊 Report includes:
{List of sections included}
💡 Next steps:
- View report: Read reports/{filename}.md
- Share with team
- Generate different report type: /project-report {project} {other-type}
Would you like me to:
- Summarize key findings from the report
- Open the report for viewing
- Generate another report type
```
## Notes
- Reports are markdown documents - easy to read, share, and version control
- Reports are timestamped - track project evolution over time
- Each report type serves different audiences:
- **Summary**: Executives, stakeholders
- **Sprint**: Team, Scrum Master
- **Milestone**: Project Manager, Product Owner
- **Velocity**: Team, for sprint planning
- **Full**: Comprehensive record, audits
- Reports are generated from live data - always current
- Reports become historical record of project progress
## Examples
### Example 1: Generate Summary Report
```
User: /project-report
Claude: 📊 Generate Project Report
Select project:
1. E-Commerce Redesign (./ecommerce-redesign)
2. Mobile App (./mobile-app)
Which project? (1-2)
User: 1
Claude: Select report type:
1. Summary - High-level overview
2. Sprint - Current sprint analysis
3. Milestone - Milestone progress
4. Velocity - Team performance
5. Full - Comprehensive report
Which type? (1-5)
User: 1
Claude: Generating summary report for E-Commerce Redesign...
[Gathers data, generates report]
✅ Report Generated Successfully!
📄 Report Type: Summary
📊 Project: E-Commerce Redesign
📅 Generated: 2025-11-13 10:30
📁 Saved to: reports/summary-ecommerce-redesign-2025-11-13.md
📊 Report includes:
- Executive summary
- Current sprint status (Sprint 5)
- Milestone progress (3/7 completed)
- Key achievements (last 30 days)
- Risks and recommendations
Key Finding: Project is on track. Beta Release milestone due in 15 days with 75% progress.
Would you like me to summarize other key findings?
```
### Example 2: Direct Command
```
User: /project-report ecommerce-redesign velocity
Claude: Generating velocity report for E-Commerce Redesign...
[Analyzes last 6 sprints, calculates metrics]
✅ Velocity Report Generated!
📊 Key Findings:
- Average Velocity: 42 points/sprint
- Trend: Stable
- Estimation Accuracy: 89%
- Recommendation: Plan 40-45 points for Sprint 6
📁 Full report: reports/velocity-ecommerce-redesign-2025-11-13.md
```
---
This command transforms project data into actionable insights. Reports provide clarity for decision-making and accountability for progress.