Initial commit
This commit is contained in:
97
commands/analyze-project.md
Normal file
97
commands/analyze-project.md
Normal file
@@ -0,0 +1,97 @@
|
||||
Advanced project analysis with actionable insights and recommendations.
|
||||
|
||||
Arguments: $ARGUMENTS
|
||||
|
||||
## Comprehensive Project Analysis
|
||||
|
||||
Multi-dimensional analysis based on requested focus area.
|
||||
|
||||
### 1. **Analysis Modes**
|
||||
|
||||
Based on $ARGUMENTS:
|
||||
- "velocity" → Sprint velocity and trends
|
||||
- "quality" → Code quality metrics
|
||||
- "risk" → Risk assessment and mitigation
|
||||
- "dependencies" → Dependency graph analysis
|
||||
- "team" → Workload and skill distribution
|
||||
- "architecture" → System design coherence
|
||||
- Default → Full spectrum analysis
|
||||
|
||||
### 2. **Velocity Analytics**
|
||||
|
||||
```
|
||||
📊 Velocity Analysis
|
||||
━━━━━━━━━━━━━━━━━━━
|
||||
Current Sprint: 24 points/week ↗️ +20%
|
||||
Rolling Average: 20 points/week
|
||||
Efficiency: 85% (17/20 tasks on time)
|
||||
|
||||
Bottlenecks Detected:
|
||||
- Code review delays (avg 4h wait)
|
||||
- Test environment availability
|
||||
- Dependency on external team
|
||||
|
||||
Recommendations:
|
||||
1. Implement parallel review process
|
||||
2. Add staging environment
|
||||
3. Mock external dependencies
|
||||
```
|
||||
|
||||
### 3. **Risk Assessment**
|
||||
|
||||
**Technical Risks**
|
||||
- High complexity tasks without backup assignee
|
||||
- Single points of failure in architecture
|
||||
- Insufficient test coverage in critical paths
|
||||
- Technical debt accumulation rate
|
||||
|
||||
**Project Risks**
|
||||
- Critical path dependencies
|
||||
- Resource availability gaps
|
||||
- Deadline feasibility analysis
|
||||
- Scope creep indicators
|
||||
|
||||
### 4. **Dependency Intelligence**
|
||||
|
||||
Visual dependency analysis:
|
||||
```
|
||||
Critical Path:
|
||||
#12 → #15 → #23 → #45 → #50 (20 days)
|
||||
↘ #24 → #46 ↗
|
||||
|
||||
Optimization: Parallelize #15 and #24
|
||||
Time Saved: 3 days
|
||||
```
|
||||
|
||||
### 5. **Quality Metrics**
|
||||
|
||||
**Code Quality**
|
||||
- Test coverage trends
|
||||
- Complexity scores
|
||||
- Technical debt ratio
|
||||
- Review feedback patterns
|
||||
|
||||
**Process Quality**
|
||||
- Rework frequency
|
||||
- Bug introduction rate
|
||||
- Time to resolution
|
||||
- Knowledge distribution
|
||||
|
||||
### 6. **Predictive Insights**
|
||||
|
||||
Based on patterns:
|
||||
- Completion probability by deadline
|
||||
- Resource needs projection
|
||||
- Risk materialization likelihood
|
||||
- Suggested interventions
|
||||
|
||||
### 7. **Executive Dashboard**
|
||||
|
||||
High-level summary with:
|
||||
- Health score (0-100)
|
||||
- Top 3 risks
|
||||
- Top 3 opportunities
|
||||
- Recommended actions
|
||||
- Success probability
|
||||
|
||||
Result: Data-driven decisions with clear action paths.
|
||||
Reference in New Issue
Block a user