@@ -0,0 +1,91 @@
---
name: implement-plan
description: Implement approved technical plans phase by phase with automated and manual verification at each step
---
# Implement Plan
You are tasked with implementing an approved technical plan. These plans contain phases with specific changes and success criteria.
## Process
### Step 1: Context Gathering
1. **Read all relevant files**:
- Read the plan completely
- Read the original ticket (if any) and all files mentioned in the plan
- **Read files fully** - never use limit/offset parameters, you need complete context
2. **Identify the current implementation status**:
- Check for any existing checkmarks (- [x]) to assess which phases are already implemented (if any)
- Identify the phase that needs to be implemented next
### Step 2: Implementation
1. **Think deeply to ensure that you have the needed context to successfully implement the next phase**
2. **Create a todo list to track your progress**
3. **Start implemeting**
- Execute the changes identified on the plan document
- ALWAYS implement unit tests
- Tests are part of the implementation phase and must NEVER be postponed
### Step 3: Validation
1. **Verify your implementation**
- Execute the success criteria automated checks
- Fix any issues before proceeding
- Verify your work makes sense in the broader codebase context
- Update your progress in both the plan file and your todos
2. **Pause for manual validations**
- Inform the human that the phase is ready for manual testing. Use this format:
```
Phase [N] Complete - Ready for Manual Verification
Automated verification passed:
- [List automated checks that passed]
Please perform the manual verification steps listed in the plan:
- [List manual verification items from the plan]
Let me know when manual testing is complete so I can proceed to Phase [N+1].
```
- If instructed to execute multiple phases consecutively, skip the pause until the last phase. Otherwise, assume you are just doing one phase.
- If no manual steps are required, proceed.
- Do not check off items in the manual testing steps until confirmed by the user.
6. **Wrap up**
- after a phase is fully implemented and tested, ensure the plan progress is updated before moving to the next phase
- NEVER proceed to the next phase if automated checks are not validated, unless explicitely allowed by the user
- NEVER proceed to the next phase if unit tests were not implemented, unless explicitely allowed by the user
## Implementation Philosophy
Plans are carefully designed, but reality can be messy. Your job is to:
- Follow the plan's intent while adapting to what you find
- Implement each phase fully before moving to the next
- Update checkboxes in the plan as you complete sections/phases
When things don't match the plan exactly, think about why and communicate clearly. The plan is your guide, but your judgment matters too.
If you encounter a mismatch:
- STOP and think deeply about why the plan can't be followed
- Present the issue clearly:
```
Issue in Phase [N]:
Expected: [what the plan says]
Found: [actual situation]
Why this matters: [explanation]
How should I proceed?
```
## If You Get Stuck
When something isn't working as expected:
- First, make sure you've read and understood all the relevant code
- Consider if the codebase has evolved since the plan was written
- Present the mismatch clearly and ask for guidance